메뉴 건너뛰기




Volumn 16, Issue 6, 2014, Pages 1001-1014

A scenario-based mixed integer linear programming model for composite power system expansion planning with greenhouse gas emission controls

Author keywords

Composite power system expansion planning; Greenhouse gas emissions control; Multi period network design; Scenario based programming

Indexed keywords

CARBON DIOXIDE; ELECTRIC POWER SYSTEM CONTROL; ELECTRIC POWER TRANSMISSION; ENERGY POLICY; EXPANSION; FOSSIL FUELS; GAS EMISSIONS; GREENHOUSE GASES; INTEGER PROGRAMMING; NUCLEAR ENERGY; NUCLEAR FUELS;

EID: 84905273589     PISSN: 1618954X     EISSN: 16189558     Source Type: Journal    
DOI: 10.1007/s10098-013-0699-y     Document Type: Article
Times cited : (18)

References (30)
  • 1
    • 84876843790 scopus 로고    scopus 로고
    • Multiobjective generation expansion planning considering power system adequacy
    • 10.1016/j.epsr.2013.04.001
    • Aghaei J, Akbari MA, Roosta A, Baharvandi A (2013) Multiobjective generation expansion planning considering power system adequacy. Elec Power Syst Res 102:8-19
    • (2013) Elec Power Syst Res , vol.102 , pp. 8-19
    • Aghaei, J.1    Akbari, M.A.2    Roosta, A.3    Baharvandi, A.4
  • 2
    • 0842333988 scopus 로고    scopus 로고
    • A multiple objective mixed integer linear programming model for power generation expansion planning
    • DOI 10.1016/j.energy.2003.10.012
    • Antunes CH, Martins AG, Brito IS (2004) A multiple objective mixed integer linear programming model for power generation expansion planning. Energy 29:613-627 (Pubitemid 38204719)
    • (2004) Energy , vol.29 , Issue.4 , pp. 613-627
    • Antunes, C.H.1    Martins, A.G.2    Brito, I.S.3
  • 3
    • 84905267454 scopus 로고    scopus 로고
    • Bureau of Energy, Ministry of Economic Affairs, Taiwan Taipei, Taiwain (in Chinese) Accessed 10 Sept 2012
    • Bureau of Energy, Ministry of Economic Affairs, Taiwan (2011) Taiwan fuel-fired carbon dioxide emissions statistics and analysis, Taipei, Taiwain (in Chinese). http://verity.erl.itri.org.tw/EIGIC/index.php?option=com- content&view=article&id=45&Itemid=29. Accessed 10 Sept 2012
    • (2011) Taiwan Fuel-fired Carbon Dioxide Emissions Statistics and Analysis
  • 4
    • 84905225793 scopus 로고    scopus 로고
    • Bureau of Energy, Ministry of Economic Affairs, Taiwan Taipei, Taiwain (in Chinese) Accessed 5 Sept 2012
    • Bureau of Energy, Ministry of Economic Affairs, Taiwan (2012) Report on long-term (2011-2020) power load forecasting and power development plan of Taiwan, Taipei, Taiwain (in Chinese). http://verity.erl.itri.org.tw/EIGIC/index. php?option=com-content&view=article&id=45&Itemid=29. Accessed 5 Sept 2012
    • (2012) Report on Long-term (2011-2020) Power Load Forecasting and Power Development Plan of Taiwan
  • 5
    • 84905255085 scopus 로고    scopus 로고
    • Bureau of Energy, Ministry of Economic Affairs, Taiwan Taipei, Taiwain (in Chinese) Accessed 5 Sept 2012
    • Bureau of Energy, Ministry of Economic Affairs, Taiwan (2012) Installed capacity of power plants, Taipei, Taiwain (in Chinese). www.web3.moeaboe.gov.tw/ ECW/populace/content/Content.aspx?menu-id=997. Accessed 5 Sept 2012
    • (2012) Installed Capacity of Power Plants
  • 6
    • 84905231442 scopus 로고    scopus 로고
    • Businessgreen Accessed 8 Sept 2012
    • 2 emissions by 2011. Businessgreen. www.businessgreen.com/bg/news/1800579/taiwan-plans- taxes-energy-co2-emissions-2011. Accessed 8 Sept 2012
    • (2009) 2 Emissions by 2011
    • Chan, Y.1
  • 7
    • 77951666162 scopus 로고    scopus 로고
    • Power generation expansion planning model towards low-carbon economy and its application in China
    • 1:CAS:528:DC%2BC3cXnt1Kis7k%3D 10.1109/TPWRS.2009.2036925
    • Chen Q, Kang C, Xia Q, Zhong J (2010) Power generation expansion planning model towards low-carbon economy and its application in China. IEEE T Power Syst 25(2):1117-1125
    • (2010) IEEE T Power Syst , vol.25 , Issue.2 , pp. 1117-1125
    • Chen, Q.1    Kang, C.2    Xia, Q.3    Zhong, J.4
  • 9
    • 0029343376 scopus 로고
    • A multiple objective linear programming model for power generation expansion planning
    • 10.1002/er.4440190507
    • Climaco J, Antunes CH, Martins AG, Almeida AT (1995) A multiple objective linear programming model for power generation expansion planning. Int J Energy Res 19:419-432
    • (1995) Int J Energy Res , vol.19 , pp. 419-432
    • Climaco, J.1    Antunes, C.H.2    Martins, A.G.3    Almeida, A.T.4
  • 10
    • 77953360493 scopus 로고    scopus 로고
    • Further emissions and energy targeting: An application of CO2 emissions pinch analysis to the Irish electricity generation sector
    • 1:CAS:528:DC%2BC3cXjslejs70%3D 10.1007/s10098-009-0245-0
    • Crilly D, Zhelev T (2010) Further emissions and energy targeting: an application of CO2 emissions pinch analysis to the Irish electricity generation sector. Clean Technol Environ Policy 12(2):177-189
    • (2010) Clean Technol Environ Policy , vol.12 , Issue.2 , pp. 177-189
    • Crilly, D.1    Zhelev, T.2
  • 11
    • 84905276605 scopus 로고    scopus 로고
    • A composite generation and transmission expansion planning pinpointing the optimal location of candidate generating unit
    • Dehghan S, Kazemi A, Jadid S (2009) A composite generation and transmission expansion planning pinpointing the optimal location of candidate generating unit. The 24th International Power System Conference, 1-13
    • (2009) The 24th International Power System Conference , pp. 1-13
    • Dehghan, S.1    Kazemi, A.2    Jadid, S.3
  • 12
    • 84871727419 scopus 로고    scopus 로고
    • Energy Information Administration, Department of Energy, USA Accessed 5 Sept 2012
    • Energy Information Administration, Department of Energy, USA (2010) Levelized cost of new generation resources in the annual energy outlook 2010. www.ucsusa.org/assets/documents/clean-energy/Appendix-Key-Assumptions-Levelized- Costs.pdf. Accessed 5 Sept 2012
    • (2010) Levelized Cost of New Generation Resources in the Annual Energy Outlook 2010
  • 13
    • 79960800548 scopus 로고    scopus 로고
    • Energy Information Administration, Department of Energy, USA Accessed 8 Sept 2012
    • Energy Information Administration, Department of Energy, USA (2012) Updated capital cost estimates for electricity generation plants. www.eia.doe.gov/oiaf/beck-plantcosts/pdf/updatedplantcosts.pdf. Accessed 8 Sept 2012
    • (2012) Updated Capital Cost Estimates for Electricity Generation Plants
  • 15
    • 84905231443 scopus 로고    scopus 로고
    • Institute of Nuclear Energy Research, Atomic Energy Council, Taiwan Taipei, Taiwan (in Chinese) Accessed 8 Sept 2012
    • Institute of Nuclear Energy Research, Atomic Energy Council, Taiwan (2011) Generation costs of low-carbon energy, Taipei, Taiwan (in Chinese). www.iner.gov.tw/siteiner/wSite/ct?xItem=5718&ctNode=394&mp=INER. Accessed 8 Sept 2012
    • (2011) Generation Costs of Low-carbon Energy
  • 16
    • 34547774971 scopus 로고    scopus 로고
    • Intergovernmental Panel on Climate Change (IPCC) Geneva, Switzerland Accessed 10 Sept 2012
    • Intergovernmental Panel on Climate Change (IPCC) (2007) Fourth assessment report: climate change 2007, Geneva, Switzerland. www.ipcc.ch/publications-and- data/publications-ipcc-fourth-assessment-report-synthesis-report.htm. Accessed 10 Sept 2012
    • (2007) Fourth Assessment Report: Climate Change 2007
  • 17
    • 0037843031 scopus 로고    scopus 로고
    • Classification of publications and models on transmission expansion planning
    • 10.1109/TPWRS.2003.811168
    • Latorre G, Cruz RD, Areiza JM, Villegas A (2003) Classification of publications and models on transmission expansion planning. IEEE T Power Syst 18(2):938-946
    • (2003) IEEE T Power Syst , vol.18 , Issue.2 , pp. 938-946
    • Latorre, G.1    Cruz, R.D.2    Areiza, J.M.3    Villegas, A.4
  • 18
    • 84999694980 scopus 로고    scopus 로고
    • A multiple objective linear programming approach to power generation planning with demand-side management
    • 10.1111/j.1475-3995.1996.tb00055.x
    • Martins AG, Coelho D, Antunes CH, Climaco J (1996) A multiple objective linear programming approach to power generation planning with demand-side management. Int Trans Oper Res 3(3/4):305-317
    • (1996) Int Trans Oper Res , vol.3 , Issue.34 , pp. 305-317
    • Martins, A.G.1    Coelho, D.2    Antunes, C.H.3    Climaco, J.4
  • 19
    • 34248592608 scopus 로고    scopus 로고
    • A model for the multiperiod multiobjective power generation expansion problem
    • DOI 10.1109/TPWRS.2007.895178
    • Meza IJC, Yildirim MB, Masud ASM (2007) A model for the multi-period multiobjective power generation expansion problem. IEEE T Power Syst 22(2):871-878 (Pubitemid 46746252)
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.2 , pp. 871-878
    • Meza, J.L.C.1    Yildirim, M.B.2    Masud, A.S.M.3
  • 20
    • 0000994613 scopus 로고    scopus 로고
    • A hybrid genetic algorithm/dynamic programming approach to optimal long-term generation expansion planning
    • PII S0142061597000707
    • Park YM, Park JB, Won JR (1998) A hybrid genetic algorithm/dynamic programming approach to optimal long-term generation expansion planning. Int J Electr Power Energy Syst 20(4):295-303 (Pubitemid 128394041)
    • (1998) International Journal of Electrical Power and Energy Systems , vol.20 , Issue.4 , pp. 295-303
    • Park, Y.M.1    Park, J.B.2    Won, J.R.3
  • 21
    • 84905276452 scopus 로고    scopus 로고
    • Emission constrained power system planning: A pinch analysis based study of Indian electricity sector
    • Priya GSK, Bandyopadhyay S (2012) Emission constrained power system planning: a pinch analysis based study of Indian electricity sector. Clean Technol Environ Policy 3:1-12
    • (2012) Clean Technol Environ Policy , vol.3 , pp. 1-12
    • Priya, G.S.K.1    Bandyopadhyay, S.2
  • 24
    • 77949564008 scopus 로고    scopus 로고
    • Wind power: Capacity factor, intermittency, and what happens when the wind doesn't blow?
    • Renewable Energy Research Laboratory, University of Massachussetts at Amherst Accessed 10 Sept 2012
    • Renewable Energy Research Laboratory, University of Massachussetts at Amherst (2012) Wind power: capacity factor, intermittency, and what happens when the wind doesn't blow? Community Wind Power Fact Sheet #2A: 1-4. www.umass.edu/windenergy/publications/published/communityWindFactSheets/ RERL-Fact-Sheet-2a-Capacity-Factor.pdf. Accessed 10 Sept 2012
    • (2012) Community Wind Power Fact Sheet #2A , pp. 1-4
  • 25
    • 34548042336 scopus 로고    scopus 로고
    • A new efficient GA-Benders' decomposition method: For power generation expansion planning with emission controls
    • DOI 10.1109/TPWRS.2007.901092
    • Sirikum J, Techanitisawad A, Kachitvichyanukul V (2007) A new efficient GA-benders' decomposition method: for power generation expansion planning with emission controls. IEEE T Power Syst 22(3):1092-1100 (Pubitemid 47278368)
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.3 , pp. 1092-1100
    • Sirikum, J.1    Techanitisawad, A.2    Kachitvichyanukul, V.3
  • 26
    • 0003327266 scopus 로고
    • System of experimental design
    • White Plains, NY, USA (English edition translated by Clausing D)
    • Taguchi G (1991) System of experimental design. In: Quality resources I(II), White Plains, NY, USA (English edition translated by Clausing D)
    • (1991) Quality Resources I(II)
    • Taguchi, G.1
  • 27
    • 84905270706 scopus 로고    scopus 로고
    • Taiwan Power Company Taipei, Taiwan (in Chinese) Accessed 10 Sept 2012
    • Taiwan Power Company (2012) Taiwan power company annual report, Taipei, Taiwan (in Chinese). www.gordoncheng.wordpress.com/2010/09/06/ %E9%9B%BB%E5%8A%9B%E7%B3%BB%E7%B5%B1%E8%B2%A0%E8%BC%89%E6%9B%B2%E7%B7%9Aload- curve/. Accessed 10 Sept 2012
    • (2012) Taiwan Power Company Annual Report
  • 28
    • 77956341790 scopus 로고    scopus 로고
    • Multi-period multi-objective electricity generation expansion planning problem with Monte-Carlo simulation
    • 10.1016/j.epsr.2010.05.007
    • Tekiner H, Coit DW, Felder FA (2010) Multi-period multi-objective electricity generation expansion planning problem with Monte-Carlo simulation. Elec Power Syst Res 80(12):1394-1405
    • (2010) Elec Power Syst Res , vol.80 , Issue.12 , pp. 1394-1405
    • Tekiner, H.1    Coit, D.W.2    Felder, F.A.3
  • 29
    • 77952999173 scopus 로고    scopus 로고
    • A fuzzy multi objective programming model for power generation and transmission expansion planning problem
    • Torabi SA, Madadi M (2010) A fuzzy multi objective programming model for power generation and transmission expansion planning problem. Int J Eng 23(1):29-39
    • (2010) Int J Eng , vol.23 , Issue.1 , pp. 29-39
    • Torabi, S.A.1    Madadi, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.