-
1
-
-
0035917381
-
Using the sediment record in a western Oregon flood-control reservoir to assess the influence of storm history and logging on sediment yield
-
DOI 10.1016/S0022-1694(01)00331-6, PII S0022169401003316
-
Ambers, R. K., (2001), Using the sediment record in a western Oregon flood-control reservoir to assess the influence of storm history and logging on sediment yield, J. Hydrol., 244 (3), 181-200. (Pubitemid 32663274)
-
(2001)
Journal of Hydrology
, vol.244
, Issue.3-4
, pp. 181-200
-
-
Ambers, R.K.R.1
-
2
-
-
84904703199
-
-
American Rivers [Available at, Accessed 3 July 2013.]
-
American Rivers (2013), 62 Dams removed to restore rivers in 2012. [Available at http://www.americanrivers.org/newsroom/press-releases/2013/62- dams-removed-in-2012.html, Accessed 3 July 2013.]
-
(2013)
62 Dams Removed to Restore Rivers in 2012
-
-
-
3
-
-
84940279320
-
Sediment impacts from Savage Rapids Dam removal, Rogue River, Oregon
-
in, Geol. Soc. Am. edited by J. V. DeGraff and J. E. Evans, Boulder, Colo.
-
Bountry, J. A., Y. G. Lai, and, T. J. Randle, (2013), Sediment impacts from Savage Rapids Dam removal, Rogue River, Oregon, in The Challenges of Dam Removal and River Restoration, Geol. Soc. Am., edited by, J. V. DeGraff, and, J. E. Evans, pp. 93-104, Boulder, Colo.
-
(2013)
The Challenges of Dam Removal and River Restoration
, pp. 93-104
-
-
Bountry, J.A.1
Lai, Y.G.2
Randle, T.J.3
-
4
-
-
84860895722
-
Importance of hydrology on channel evolution following dam removal: Case study and conceptual model
-
doi: 10.1061/(asce)hy.1943-7900.0000526.
-
Cannatelli, K. M., and, J. C. Curran, (2012), Importance of hydrology on channel evolution following dam removal: Case study and conceptual model, J. Hydraul. Eng.-ASCE, 138 (5), 377-390, doi: 10.1061/(asce)hy.1943-7900.0000526.
-
(2012)
J. Hydraul. Eng.-ASCE
, vol.138
, Issue.5
, pp. 377-390
-
-
Cannatelli, K.M.1
Curran, J.C.2
-
5
-
-
84869810492
-
Jökulhlaups: Geological importance, deglacial association and hazard management
-
Carrivick, J. L., (2011), Jökulhlaups: Geological importance, deglacial association and hazard management, Geol. Today, 27 (4), 133-140.
-
(2011)
Geol. Today
, vol.27
, Issue.4
, pp. 133-140
-
-
Carrivick, J.L.1
-
6
-
-
84904639172
-
Physical and biological responses to dam removal sediment release
-
Patapso River, Maryland
-
Collins, M. L., et al. (2013), Physical and biological responses to dam removal sediment release, Patapso River, Maryland, EOS Trans. AGU, Fall Meet. Suppl., Abstract EP43A-0821.
-
(2013)
EOS Trans. AGU, Fall Meet. Suppl., Abstract EP43A-0821
-
-
Collins, M.L.1
-
7
-
-
84879886748
-
Dynamic interactions between lahars and stream flow: A case study from Ruapehu volcano, New Zealand
-
Cronin, S. J., V. Neall, J. Lecointre, and, A. Palmer, (1999), Dynamic interactions between lahars and stream flow: A case study from Ruapehu volcano, New Zealand, Geol. Soc. Am. Bull., 111 (1), 28-38. (Pubitemid 29212535)
-
(1999)
Bulletin of the Geological Society of America
, vol.111
, Issue.1
, pp. 28-38
-
-
Cronin, S.J.1
Neall, V.E.2
Lecointre, J.A.3
Palmer, A.S.4
-
8
-
-
34848829117
-
Examining the dynamics of grain size distributions of gravel/sand deposits in the Sandy River, Oregon with a numerical model
-
DOI 10.1002/rra.1012
-
Cui, Y., (2007), Examining the dynamics of grain size distributions of gravel/sand deposits in the Sandy River, Oregon with a numerical model, River Res. Appl., 23 (7), 732-751, doi: 10.1002/rra.1012. (Pubitemid 47505893)
-
(2007)
River Research and Applications
, vol.23
, Issue.7
, pp. 732-751
-
-
Cui, Y.1
-
9
-
-
77953906982
-
Development and application of numerical models of sediment transport associated with dam removal
-
in, edited by M. H. Garcia, chap. 23, ASCE, Reston, Va.
-
Cui, Y., and, A. Wilcox, (2008), Development and application of numerical models of sediment transport associated with dam removal, in Sedimentation Engineering: Theory, Measurements, Modeling, and Practice, ASCE Manual 110, edited by, M. H. Garcia, chap. 23, pp. 995-1020, ASCE, Reston, Va.
-
(2008)
Sedimentation Engineering: Theory, Measurements, Modeling, and Practice, ASCE Manual 110
, pp. 995-1020
-
-
Cui, Y.1
Wilcox, A.2
-
10
-
-
84918502761
-
Anticipated sediment delivery to the lower Elwha River during and following dam removal
-
in, U.S. Geol. Surv. edited by J. J. Duda, J. A. Warrick, and C. S. Magirl, Reston, Va.
-
Czuba, C. R., T. J. Randle, J. A. Bountry, C. S. Magirl, J. A. Czuba, C. A. Curran, and, C. P. Konrad, (2011a), Anticipated sediment delivery to the lower Elwha River during and following dam removal, in Coastal Habitats of the Elwha River, Washington-Biological and Physical Patterns and Processes Prior to Dam Removal, U.S. Geol. Surv., edited by, J. J. Duda, J. A. Warrick, and, C. S. Magirl, pp. 27-46, Reston, Va.
-
(2011)
Coastal Habitats of the Elwha River, Washington - Biological and Physical Patterns and Processes Prior to Dam Removal
, pp. 27-46
-
-
Czuba, C.R.1
Randle, T.J.2
Bountry, J.A.3
Magirl, C.S.4
Czuba, J.A.5
Curran, C.A.6
Konrad, C.P.7
-
11
-
-
84904690833
-
-
U.S. Geol. Surv., Fact Sheet 2011-3083
-
Czuba, J. A., C. S. Magirl, C. R. Czuba, E. E. Grossman, C. A. Curran, A. S. Gendaszek, and, R. S. Dinacola, (2011b), Sediment load from major rivers into Puget Sound and its adjacent waters, 4 pp., U.S. Geol. Surv., Fact Sheet 2011-3083.
-
(2011)
Sediment Load from Major Rivers into Puget Sound and Its Adjacent Waters
, vol.4
-
-
Czuba, J.A.1
Magirl, C.S.2
Czuba, C.R.3
Grossman, E.E.4
Curran, C.A.5
Gendaszek, A.S.6
Dinacola, R.S.7
-
12
-
-
84904677770
-
-
DeGraff, J. V. and J. E. Evans (Eds.), GSA Reviews in Engineering Geology, 21, Geol. Soc. Am. Boulder, Colo.
-
DeGraff, J. V., and, J. E. Evans, (Eds.) (2013), The Challenges of Dam Removal and River Restoration, GSA Reviews in Engineering Geology, vol. 21, Geol. Soc. Am., Boulder, Colo.
-
(2013)
The Challenges of Dam Removal and River Restoration
-
-
-
13
-
-
77953896381
-
Managing reservoir sediment release in dam removal projects: An approach informed by physical and numerical modelling of non-cohesive sediment
-
doi: 10.1080/15715124.2009.9635401.
-
Downs, P. W., Y. Cui, J. K. Wooster, S. R. Dusterhoff, D. B. Booth, W. E. Dietrich, and, L. S. Sklar, (2009), Managing reservoir sediment release in dam removal projects: An approach informed by physical and numerical modelling of non-cohesive sediment, Int. J. River Basin Manage., 7 (4), 433-452, doi: 10.1080/15715124.2009.9635401.
-
(2009)
Int. J. River Basin Manage.
, vol.7
, Issue.4
, pp. 433-452
-
-
Downs, P.W.1
Cui, Y.2
Wooster, J.K.3
Dusterhoff, S.R.4
Booth, D.B.5
Dietrich, W.E.6
Sklar, L.S.7
-
14
-
-
17644437263
-
Channel adjustments following two dam removals in Wisconsin
-
doi: 10.1029/2002WR001714.
-
Doyle, M. W., E. H. Stanley, and, J. M. Harbor, (2003a), Channel adjustments following two dam removals in Wisconsin, Water Resour. Res., 39 (1), 1011, doi: 10.1029/2002WR001714.
-
(2003)
Water Resour. Res.
, vol.39
, Issue.1
, pp. 1011
-
-
Doyle, M.W.1
Stanley, E.H.2
Harbor, J.M.3
-
15
-
-
70449971057
-
Dam removal in the United States: Emerging needs for science and policy
-
doi: 10.1029/2003EO040001.
-
Doyle, M. W., E. H. Stanley, J. M. Harbor, and, G. G. Grant, (2003b), Dam removal in the United States: Emerging needs for science and policy, Eos Trans. AGU, 84 (4), 29-36, doi: 10.1029/2003EO040001.
-
(2003)
Eos Trans. AGU
, vol.84
, Issue.4
, pp. 29-36
-
-
Doyle, M.W.1
Stanley, E.H.2
Harbor, J.M.3
Grant, G.G.4
-
16
-
-
84921434340
-
Sedimentology of new fluvial deposits on the Elwha River, Washington, USA, formed during large-scale dam removal
-
doi: 10.1002/rra.
-
Draut, A. E., and, A. C. Ritchie, (2013), Sedimentology of new fluvial deposits on the Elwha River, Washington, USA, formed during large-scale dam removal, River Res. Appl., doi: 10.1002/rra.
-
(2013)
River Res. Appl.
-
-
Draut, A.E.1
Ritchie, A.C.2
-
17
-
-
84880235781
-
-
(Eds.) U.S. Geol. Surv. Sci. Invest. Rep., 2011-5120
-
Duda, J. J., J. A. Warrick, and, C. S. Magirl, (Eds.) (2011), Coastal habitats of the Elwha River, Washington-Biological and physical patterns and processes prior to dam removal, 264 pp., U.S. Geol. Surv. Sci. Invest. Rep., 2011-5120.
-
(2011)
Coastal Habitats of the Elwha River, Washington - Biological and Physical Patterns and Processes Prior to Dam Removal
, pp. 264
-
-
Duda, J.J.1
Warrick, J.A.2
Magirl, C.S.3
-
18
-
-
84896718113
-
Fine sediment infiltration dynamics in a gravel-bed river following a sediment pulse
-
doi: 10.1002/rra.2647.
-
Evans, E., and, A. C. Wilcox, (2013), Fine sediment infiltration dynamics in a gravel-bed river following a sediment pulse, River Res. Appl., doi: 10.1002/rra.2647.
-
(2013)
River Res. Appl.
-
-
Evans, E.1
Wilcox, A.C.2
-
21
-
-
0003536717
-
-
Hemphill Publishing Company, Austin, Tex.
-
Folk, R. L., (1980), Petrology of Sedimentary Rocks, 182 pp., Hemphill Publishing Company, Austin, Tex.
-
(1980)
Petrology of Sedimentary Rocks
, pp. 182
-
-
Folk, R.L.1
-
23
-
-
23844519631
-
-
(Ed.), H. John Heinz III Center for Science, Economics and the Environment, Washington, D. C.
-
Graf, W. L., (Ed.) (2002), Dam Removal Research: Status and Prospects, 151 pp., H. John Heinz III Center for Science, Economics and the Environment, Washington, D. C.
-
(2002)
Dam Removal Research: Status and Prospects
, pp. 151
-
-
Graf, W.L.1
-
24
-
-
79551709553
-
Estimating sediment discharge
-
in, edited by M. H. Garcia, American Society of Civil Engineering Manuals and Reports on Engineering Practice, Reston, Va.
-
Gray, J. R., and, F. J. M. Simoes, (2008), Estimating sediment discharge, in Sedimentation Engineering, edited by, M. H. Garcia, pp. 1067-1088, American Society of Civil Engineering Manuals and Reports on Engineering Practice, Reston, Va.
-
(2008)
Sedimentation Engineering
, pp. 1067-1088
-
-
Gray, J.R.1
Simoes, F.J.M.2
-
25
-
-
84860621162
-
The 6 August 2010 Mount Meager rock slide-debris flow, Coast Mountains, British Columbia: Characteristics, dynamics, and implications for hazard and risk assessment
-
Guthrie, R., P. Friele, K. Allstadt, N. Roberts, S. Evans, K. Delaney, D. Roche, J. Clague, and, M. Jakob, (2012), The 6 August 2010 Mount Meager rock slide-debris flow, Coast Mountains, British Columbia: Characteristics, dynamics, and implications for hazard and risk assessment, Nat. Hazards Earth Syst. Sci., 12 (5), 1277-1294.
-
(2012)
Nat. Hazards Earth Syst. Sci.
, vol.12
, Issue.5
, pp. 1277-1294
-
-
Guthrie, R.1
Friele, P.2
Allstadt, K.3
Roberts, N.4
Evans, S.5
Delaney, K.6
Roche, D.7
Clague, J.8
Jakob, M.9
-
26
-
-
84893019078
-
Debris flows: Behaviour and hazard assessment
-
Iverson, R. M., (2014), Debris flows: Behaviour and hazard assessment, Geol. Today, 30, 15-20.
-
(2014)
Geol. Today
, vol.30
, pp. 15-20
-
-
Iverson, R.M.1
-
27
-
-
79953060589
-
Evolving expectations of dam removal outcomes: Downstream geomorphic effects following removal of a small, gravel-filled dam
-
doi: 10.1111/j.1752-1688.2011.00523.x.
-
Kibler, K., D. Tullos, and, M. Kondolf, (2011), Evolving expectations of dam removal outcomes: Downstream geomorphic effects following removal of a small, gravel-filled dam, JAWRA J. Am. Water Resour. Assoc., 47 (2), 408-423, doi: 10.1111/j.1752-1688.2011.00523.x.
-
(2011)
JAWRA J. Am. Water Resour. Assoc.
, vol.47
, Issue.2
, pp. 408-423
-
-
Kibler, K.1
Tullos, D.2
Kondolf, M.3
-
28
-
-
84904607267
-
-
Kleinfelder, Sediment sampling and analysis report, Northwestern Lake, Condit Hydroelectric Project, Prepared for PacifiCorp Energy, Beaverton, Oreg.
-
Kleinfelder (2007), Sediment sampling and analysis report, Northwestern Lake, Condit Hydroelectric Project, Prepared for PacifiCorp Energy, Beaverton, Oreg.
-
(2007)
-
-
-
29
-
-
84904653496
-
Sediment management strategies associated with dam removal in the State of Washington
-
paper presented at
-
Magirl, C. S., P. J. Connolly, B. Coffin, J. J. Duda, C. A. Curran, and, A. E. Draut, (2010), Sediment management strategies associated with dam removal in the State of Washington, paper presented at Proceedings of the 2nd Joint Federal Interagency Conference, Las Vegas, Nev., 28 June-July 1.
-
(2010)
Proceedings of the 2nd Joint Federal Interagency Conference, Las Vegas, Nev., 28 June-July 1.
-
-
Magirl, C.S.1
Connolly, P.J.2
Coffin, B.3
Duda, J.J.4
Curran, C.A.5
Draut, A.E.6
-
30
-
-
84904622565
-
-
5, U.S. Geol. Surv. Data Ser.
-
Major, J. J., K. R. Spicer, and, R. A. Collins, (2010), Time-lapse imagery of the breaching of Marmot Dam, Oregon, and subsequent erosion of sediment by the Sandy River-October 2007 to May 2008, 5 pp., U.S. Geol. Surv. Data Ser., 521.
-
(2010)
Time-lapse Imagery of the Breaching of Marmot Dam, Oregon, and Subsequent Erosion of Sediment by the Sandy River - October 2007 to May 2008
, pp. 521
-
-
Major, J.J.1
Spicer, K.R.2
Collins, R.A.3
-
31
-
-
84864221203
-
Geomorphic response of the Sandy River, Oregon, to removal of Marmot Dam
-
Major, J. J., et al. (2012), Geomorphic response of the Sandy River, Oregon, to removal of Marmot Dam, USGS Prof. Pap., 1792, 64.
-
(2012)
USGS Prof. Pap.
, vol.1792
, pp. 64
-
-
Major, J.J.1
-
33
-
-
84959134269
-
Stability charts for earth slopes during rapid drawdown
-
Morgenstern, N. R., (1963), Stability charts for earth slopes during rapid drawdown, Geotechnique, 13, 121-131.
-
(1963)
Geotechnique
, vol.13
, pp. 121-131
-
-
Morgenstern, N.R.1
-
34
-
-
0035746248
-
-
U.S. Geol. Surv. Prof. Pap., 1606
-
O'Connor, J. E., J. H. I. Hardison, and, J. E. Costa, (2001), Debris flows from failures of Neoglacial-age moraine dams in the Three Sisters and Mt. Jefferson Wilderness areas, Oregon, U.S. Geol. Surv. Prof. Pap., 1606, 93.
-
(2001)
Debris Flows from Failures of Neoglacial-age Moraine Dams in the Three Sisters and Mt. Jefferson Wilderness Areas, Oregon
, pp. 93
-
-
O'Connor, J.E.1
Hardison, J.H.I.2
Costa, J.E.3
-
35
-
-
80051675352
-
Rates and processes of channel response to dam removal with a sand-filled impoundment
-
doi: 10.1029/2010WR009733.
-
Pearson, A. J., N. P. Snyder, and, M. J. Collins, (2011), Rates and processes of channel response to dam removal with a sand-filled impoundment, Water Resour. Res., 47, W08504, doi: 10.1029/2010WR009733.
-
(2011)
Water Resour. Res.
, vol.47
-
-
Pearson, A.J.1
Snyder, N.P.2
Collins, M.J.3
-
36
-
-
34147135824
-
Hyperconcentrated flow - Transitional process between water flow and debris flow
-
in, edited by M. Jakob and O. Hungr, Springer-Praxis, Berlin Heidelberg.
-
Pierson, T. C., (2005), Hyperconcentrated flow-Transitional process between water flow and debris flow, in Debris-Flow Hazards and Related Phenomena, edited by, M. Jakob, and, O. Hungr, pp. 159-202, Springer-Praxis, Berlin Heidelberg.
-
(2005)
Debris-Flow Hazards and Related Phenomena
, pp. 159-202
-
-
Pierson, T.C.1
-
37
-
-
0022264499
-
Downstream dilution of a lahar: Transition from debris flow to hyperconcentrated streamflow
-
doi: 10.1029/WR021i010p01511.
-
Pierson, T. C., and, K. M. Scott, (1985), Downstream dilution of a lahar: Transition from debris flow to hyperconcentrated streamflow, Water Resour. Res., 21, 1511-1524, doi: 10.1029/WR021i010p01511.
-
(1985)
Water Resour. Res.
, vol.21
, pp. 1511-1524
-
-
Pierson, T.C.1
Scott, K.M.2
-
38
-
-
0036331658
-
Effects of dam removal on river form and process
-
Pizzuto, J., (2002), Effects of dam removal on river form and process, BioScience, 52 (8), 683-691. (Pubitemid 34834287)
-
(2002)
BioScience
, vol.52
, Issue.8
, pp. 683-691
-
-
Pizzuto, J.1
-
39
-
-
73849119342
-
Quantifying the geomorphic impacts of a lake-breakout lahar, Mount Ruapehu, New Zealand
-
Procter, J., S. J. Cronin, I. C. Fuller, G. Lube, and, V. Manville, (2010), Quantifying the geomorphic impacts of a lake-breakout lahar, Mount Ruapehu, New Zealand, Geology, 38 (1), 67-70.
-
(2010)
Geology
, vol.38
, Issue.1
, pp. 67-70
-
-
Procter, J.1
Cronin, S.J.2
Fuller, I.C.3
Lube, G.4
Manville, V.5
-
40
-
-
84904693164
-
-
U.S. Bureau of Reclamation Technical Service Report, Denver, Colo.
-
Randle, T. J., and, B. Greimann, (2004), Sediment impact analysis for the proposed Hemlock Dam removal project: Gifford Pinchot National Forest, Skamania County, 63 pp., U.S. Bureau of Reclamation Technical Service Report, Denver, Colo.
-
(2004)
Sediment Impact Analysis for the Proposed Hemlock Dam Removal Project: Gifford Pinchot National Forest, Skamania County
, vol.63
-
-
Randle, T.J.1
Greimann, B.2
-
42
-
-
77957281437
-
Evidence for biotic controls on topography and soil production
-
Roering, J. J., J. Marshall, A. M. Booth, M. Mort, and, Q. Jin, (2010), Evidence for biotic controls on topography and soil production, Earth Planet. Sci. Lett., 298 (1), 183-190.
-
(2010)
Earth Planet. Sci. Lett.
, vol.298
, Issue.1
, pp. 183-190
-
-
Roering, J.J.1
Marshall, J.2
Booth, A.M.3
Mort, M.4
Jin, Q.5
-
43
-
-
84858341886
-
A comparison of past small dam removals in highly sediment-impacted systems in the U.S
-
(0).
-
Sawaske, S. R., and, D. L. Freyberg, (2012), A comparison of past small dam removals in highly sediment-impacted systems in the U.S, Geomorphology, 151-152 (0), 50-58.
-
(2012)
Geomorphology
, vol.151-152
, pp. 50-58
-
-
Sawaske, S.R.1
Freyberg, D.L.2
-
44
-
-
81555205657
-
Will busting dams boost salmon?
-
Service, R. F., (2011), Will busting dams boost salmon?, Science, 334 (6058), 888-892.
-
(2011)
Science
, vol.334
, Issue.6058
, pp. 888-892
-
-
Service, R.F.1
-
45
-
-
0002295251
-
Sedimentary structures generated by flow in alluvial channels
-
in, Society of Economic Paleontologists and Mineralogists Special Publication, 12, edited by G. V. Middleton, SEPM, Fort Collins, Colo.
-
Simons, D. B., E. V. Richardson, and, C. F. J. Nordin, (1965), Sedimentary structures generated by flow in alluvial channels, in Primary Sedimentary Structures and Their Hydrodynamic Interpretation, Society of Economic Paleontologists and Mineralogists Special Publication, vol. 12, edited by, G. V. Middleton, pp. 34-52, SEPM, Fort Collins, Colo.
-
(1965)
Primary Sedimentary Structures and Their Hydrodynamic Interpretation
, pp. 34-52
-
-
Simons, D.B.1
Richardson, E.V.2
Nordin, C.F.J.3
-
46
-
-
84892677057
-
Morphological responses and sediment processes following a typhoon-induced dam failure Dahan River, Taiwan
-
doi: 10.1002/esp.3446.
-
Tullos, D., and, H.-W. Wang, (2014), Morphological responses and sediment processes following a typhoon-induced dam failure Dahan River, Taiwan, Earth Surf. Processes Landforms, 39, 245-258, doi: 10.1002/esp.3446.
-
(2014)
Earth Surf. Processes Landforms
, vol.39
, pp. 245-258
-
-
Tullos, D.1
Wang, H.-W.2
-
48
-
-
78649459431
-
Downstream channel changes after a small dam removal: Using aerial photos and measurement error for context; Calapooia River, Oregon
-
doi: 10.1002/rra.1323.
-
Walter, C., and, D. D. Tullos, (2010), Downstream channel changes after a small dam removal: Using aerial photos and measurement error for context; Calapooia River, Oregon, River Res. Appl., 26 (10), 1220-1245, doi: 10.1002/rra.1323.
-
(2010)
River Res. Appl.
, vol.26
, Issue.10
, pp. 1220-1245
-
-
Walter, C.1
Tullos, D.D.2
-
49
-
-
84868309116
-
River turbidity and sediment loads during dam removal
-
doi: 10.1029/2012EO430002.
-
Warrick, J. A., J. J. Duda, C. S. Magirl, and, C. A. Curran, (2012), River turbidity and sediment loads during dam removal, Eos Trans. AGU, 93 (43), 425-426, doi: 10.1029/2012EO430002.
-
(2012)
Eos Trans. AGU
, vol.93
, Issue.43
, pp. 425-426
-
-
Warrick, J.A.1
Duda, J.J.2
Magirl, C.S.3
Curran, C.A.4
-
51
-
-
84904606465
-
-
Watershed Sciences Inc., Condit Dam, Washington LiDAR data, Corvallis, Oreg.
-
Watershed Sciences Inc. (2012), Condit Dam, Washington LiDAR data, Corvallis, Oreg.
-
(2012)
-
-
-
52
-
-
0037330441
-
Surface-based transport model for mixed-size sediment
-
DOI 10.1061/(ASCE)0733-9429(2003)129:2(120)
-
Wilcock, P. R., and, J. C. Crowe, (2003), Surface-based transport model for mixed-size sediment, J. Hydraul. Eng.-ASCE, 129 (2), 120-128, doi: 10.1061/(asce)0733-9429(2003)129:2(120). (Pubitemid 36261232)
-
(2003)
Journal of Hydraulic Engineering
, vol.129
, Issue.2
, pp. 120-128
-
-
Wilcock, P.R.1
Crowe, J.C.2
-
53
-
-
0035703090
-
Experimental study of the transport of mixed sand and gravel
-
DOI 10.1029/2001WR000683
-
Wilcock, P. R., S. T. Kenworthy, and, J. C. Crowe, (2001), Experimental study of the transport of mixed sand and gravel, Water Resour. Res., 37, 3349-3358, doi: 10.1029/2001WR000683. (Pubitemid 34108285)
-
(2001)
Water Resources Research
, vol.37
, Issue.12
, pp. 3349-3358
-
-
Wilcock, P.R.1
Kenworthy, S.T.2
Crowe, J.C.3
-
54
-
-
84904640783
-
Sediment transport and deposition resulting from a dam-removal sediment pulse: Milltown Dam, Clark Fork River, MT
-
Wilcox, A. C., (2010), Sediment transport and deposition resulting from a dam-removal sediment pulse: Milltown Dam, Clark Fork River, MT, EOS Trans. AGU, Fall Meet. Suppl., Abstract H31E-1045.
-
(2010)
EOS Trans. AGU, Fall Meet. Suppl., Abstract H31E-1045
-
-
Wilcox, A.C.1
-
55
-
-
27144473417
-
The evolution of gravel bed channels after dam removal: Case study of the Anaconda and Union City Dam removals
-
DOI 10.1016/j.geomorph.2004.08.018, PII S0169555X0500108X, Dams in Geomorphology
-
Wildman, L. A. S., and, J. G. MacBroom, (2005), The evolution of gravel bed channels after dam removal: Case study of the Anaconda and Union City Dam removals, Geomorphology, 71 (1-2), 245-262, doi: 10.1016/j.geomorph.2004.08.018. (Pubitemid 41510186)
-
(2005)
Geomorphology
, vol.71
, Issue.1-2
, pp. 245-262
-
-
Wildman, L.A.S.1
MacBroom, J.G.2
|