메뉴 건너뛰기




Volumn 29, Issue 4, 2014, Pages 1583-1591

Chance-constrained day-ahead scheduling in stochastic power system operation

Author keywords

Chance constraints; day ahead scheduling; hourly load forecast errors; random outages of components; stochastic hourly unit commitment; variable renewable sources

Indexed keywords

FORECASTING; MONTE CARLO METHODS; STOCHASTIC MODELS; STOCHASTIC PROGRAMMING; STOCHASTIC SYSTEMS;

EID: 84903315462     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2013.2296438     Document Type: Article
Times cited : (262)

References (37)
  • 3
    • 68349141640 scopus 로고    scopus 로고
    • Contingency-constrained reserve requirements in joint energy and ancillary services auction
    • Aug.
    • J. Wang, M. Shahidehpour, and Z. Li, "Contingency-constrained reserve requirements in joint energy and ancillary services auction," IEEE Trans. Power Syst., vol. 24, no. 3, pp. 1457-1468, Aug. 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.3 , pp. 1457-1468
    • Wang, J.1    Shahidehpour, M.2    Li, Z.3
  • 4
    • 49249095955 scopus 로고    scopus 로고
    • Security-constrained unit commitment with volatile wind power generation
    • Aug.
    • J. Wang, M. Shahidehpour, and Z. Li, "Security-constrained unit commitment with volatile wind power generation.," IEEE Trans. Power Syst., vol. 23, no. 3, pp. 1319-1327, Aug. 2008.
    • (2008) IEEE Trans. Power Syst. , vol.23 , Issue.3 , pp. 1319-1327
    • Wang, J.1    Shahidehpour, M.2    Li, Z.3
  • 5
    • 77955696272 scopus 로고    scopus 로고
    • Multiobjective underfrequency load shedding in an autonomous system using hierarchical genetic algorithms
    • Jul.
    • Y. Hong and S. Wei, "Multiobjective underfrequency load shedding in an autonomous system using hierarchical genetic algorithms," IEEE Trans. Power Delivery, vol. 25, no. 3, pp. 1355-1362, Jul. 2010.
    • (2010) IEEE Trans. Power Delivery , vol.25 , Issue.3 , pp. 1355-1362
    • Hong, Y.1    Wei, S.2
  • 6
    • 80052053715 scopus 로고    scopus 로고
    • SCUC with hourly demand response considering intertemporal load characteristics
    • Sep.
    • A. Khodaei, M. Shahidehpour, and S. Bahramirad, "SCUC with hourly demand response considering intertemporal load characteristics," IEEE Trans. Smart Grid, vol. 2, no. 3, pp. 564-571, Sep. 2011.
    • (2011) IEEE Trans. Smart Grid , vol.2 , Issue.3 , pp. 564-571
    • Khodaei, A.1    Shahidehpour, M.2    Bahramirad, S.3
  • 7
    • 36348946426 scopus 로고    scopus 로고
    • Load shedding: A new proposal
    • DOI 10.1109/TPWRS.2007.907390
    • R. Faranda, A. Pievatolo, and E. Tironi, "Load shedding: A new proposal," IEEE Trans. Power Syst., vol. 22, no. 4, pp. 2086-2093, Nov. 2007. (Pubitemid 350142010)
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.4 , pp. 2086-2093
    • Faranda, R.1    Pievatolo, A.2    Tironi, E.3
  • 9
    • 33947655421 scopus 로고    scopus 로고
    • Impacts of wind power on thermal generation unit commitment and dispatch
    • DOI 10.1109/TEC.2006.889616, Special Issue on Wind Power
    • B. C. Ummels, M. Gibescu, E. Pelgrum, W. L. Kling, and A. J. Brand, "Impacts of wind power on thermal generation unit commitment and dispatch," IEEE Trans. Energy Convers., vol. 22, no. 1, pp. 44-51, Mar. 2007. (Pubitemid 46487475)
    • (2007) IEEE Transactions on Energy Conversion , vol.22 , Issue.1 , pp. 44-51
    • Ummels, B.C.1    Gibescu, M.2    Pelgrum, E.3    Kling, W.L.4    Brand, A.J.5
  • 11
    • 79952073578 scopus 로고    scopus 로고
    • Impact of wind power forecasting error bias on the economic operation of autonomous power systems
    • A. G. Tsikalakis, N. D. Hatziargyriou, Y. A. Katsigiannis, and P. S. Georgilakis, "Impact of wind power forecasting error bias on the economic operation of autonomous power systems,"Wind Energy, vol. 12, no. 4, pp. 315-331, 2009.
    • (2009) Wind Energy , vol.12 , Issue.4 , pp. 315-331
    • Tsikalakis, A.G.1    Hatziargyriou, N.D.2    Katsigiannis, Y.A.3    Georgilakis, P.S.4
  • 12
    • 49249086942 scopus 로고    scopus 로고
    • Cost of reliability analysis based on stochastic unit commitment
    • Aug.
    • L. Wu, M. Shahidehpour, and T. Li, "Cost of reliability analysis based on stochastic unit commitment," IEEE Trans. Power Syst., vol. 23, no. 3, pp. 1364-1374, Aug. 2008.
    • (2008) IEEE Trans. Power Syst. , vol.23 , Issue.3 , pp. 1364-1374
    • Wu, L.1    Shahidehpour, M.2    Li, T.3
  • 13
    • 34248512634 scopus 로고    scopus 로고
    • Stochastic security-constrained unit commitment
    • DOI 10.1109/TPWRS.2007.894843
    • L. Wu, M. Shahidehpour, and T. Li, "Stochastic security-constrained unit commitment," IEEE Trans. Power Syst., vol. 22, no. 2, pp. 800-811, May 2007. (Pubitemid 46746244)
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.2 , pp. 800-811
    • Wu, L.1    Shahidehpour, M.2    Li, T.3
  • 14
    • 67349225799 scopus 로고    scopus 로고
    • Unit commitment for systems with significant wind penetration
    • May.
    • A. Tuohy, P. Meibom, E. Denny, and M. O'Malley, "Unit commitment for systems with significant wind penetration," IEEE Trans. Power Syst., vol. 24, no. 2, pp. 592-601, May 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.2 , pp. 592-601
    • Tuohy, A.1    Meibom, P.2    Denny, E.3    O'Malley, M.4
  • 15
    • 79960893881 scopus 로고    scopus 로고
    • Stochastic optimization model to study the operational impacts of high wind penetrations in Ireland
    • Aug.
    • P. Meibom et al., "Stochastic optimization model to study the operational impacts of high wind penetrations in Ireland," IEEE Trans. Power Syst., vol. 26, no. 3, pp. 1367-1379, Aug. 2011.
    • (2011) IEEE Trans. Power Syst. , vol.26 , Issue.3 , pp. 1367-1379
    • Meibom, P.1
  • 16
    • 67349249985 scopus 로고    scopus 로고
    • Economic valuation of reserves in power systems with high penetration of wind power
    • May.
    • J. Morales, A. Conejo, and J. Pérez-Ruiz, "Economic valuation of reserves in power systems with high penetration of wind power," IEEE Trans. Power Syst., vol. 24, no. 2, pp. 900-910, May 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.2 , pp. 900-910
    • Morales, J.1    Conejo, A.2    Pérez-Ruiz, J.3
  • 17
    • 0001857581 scopus 로고
    • A computer code for solution of probabilistic-constrained stochastic programming problems
    • Y. Ermoliev and R. J.-B. Wets, Eds. Berlin, Germany: Springer-Verlag, ch. 10
    • T. Szantai, "A computer code for solution of probabilistic- constrained stochastic programming problems," in Numerical Techniques for Stochastic Optimization, Y. Ermoliev and R. J.-B. Wets, Eds. Berlin, Germany: Springer-Verlag, 1988, ch. 10, pp. 230-235.
    • (1988) Numerical Techniques for Stochastic Optimization , pp. 230-235
    • Szantai, T.1
  • 18
    • 4043072671 scopus 로고    scopus 로고
    • A solution to the stochastic unit commitment problem using chance constrained programming
    • Aug.
    • U. A. Ozturk, M. Mazumdar, and B. A. Norman, "A solution to the stochastic unit commitment problem using chance constrained programming," IEEE Trans. Power Syst., vol. 19, no. 3, pp. 1589-1598, Aug. 2004.
    • (2004) IEEE Trans. Power Syst. , vol.19 , Issue.3 , pp. 1589-1598
    • Ozturk, U.A.1    Mazumdar, M.2    Norman, B.A.3
  • 19
    • 84856290355 scopus 로고    scopus 로고
    • A chance-constrained two-stage stochastic program for unit commitment with uncertain wind power output
    • Feb.
    • Q. Wang, Y. Guan, and J. Wang, "A chance-constrained two-stage stochastic program for unit commitment with uncertain wind power output," IEEE Trans. Power Syst., vol. 27, no. 1, pp. 206-215, Feb. 2012.
    • (2012) IEEE Trans. Power Syst. , vol.27 , Issue.1 , pp. 206-215
    • Wang, Q.1    Guan, Y.2    Wang, J.3
  • 21
    • 33646379100 scopus 로고    scopus 로고
    • AC contingency dispatch based on security-constrained unit commitment
    • May.
    • Y. Fu, M. Shahidehpour, and Z. Li, "AC contingency dispatch based on security-constrained unit commitment," IEEE Trans. Power Syst., vol. 21, no. 2, pp. 897-908, May 2006.
    • (2006) IEEE Trans. Power Syst. , vol.21 , Issue.2 , pp. 897-908
    • Fu, Y.1    Shahidehpour, M.2    Li, Z.3
  • 22
    • 84903289772 scopus 로고    scopus 로고
    • A decomposition approach to the two-stage stochastic unit commitment problem
    • to be published
    • Q. Zheng, J. Wang, P. M. Pardalos, and Y. Guan, "A decomposition approach to the two-stage stochastic unit commitment problem," Ann. Oper. Res., to be published.
    • Ann. Oper. Res.
    • Zheng, Q.1    Wang, J.2    Pardalos, P.M.3    Guan, Y.4
  • 23
    • 79952361403 scopus 로고    scopus 로고
    • Accelerating the benders decomposition for network-constrained unit commitment problems
    • Aug.
    • L. Wu and M. Shahidehpour, "Accelerating the benders decomposition for network-constrained unit commitment problems," Energy Syst., vol. 1, no. 3, pp. 339-376, Aug. 2010.
    • (2010) Energy Syst. , vol.1 , Issue.3 , pp. 339-376
    • Wu, L.1    Shahidehpour, M.2
  • 25
    • 70349183734 scopus 로고    scopus 로고
    • Impact of load forecast uncertainty on LMP
    • Mar.
    • R. Bo and F. Li, "Impact of load forecast uncertainty on LMP," in Proc. Power System Conf. Expo., Mar. 2009, pp. 1-6.
    • (2009) Proc. Power System Conf. Expo. , pp. 1-6
    • Bo, R.1    Li, F.2
  • 27
    • 84903289773 scopus 로고    scopus 로고
    • Enhancing the dispatchability of variable wind generation by coordination with pumpedstorage hydro units in stochastic power systems
    • to be published
    • M. E. Khodayar, M. Shahidehpour, and L. Wu, "Enhancing the dispatchability of variable wind generation by coordination with pumpedstorage hydro units in stochastic power systems," IEEE Trans. Power Syst., to be published.
    • IEEE Trans. Power Syst.
    • Khodayar, M.E.1    Shahidehpour, M.2    Wu, L.3
  • 31
    • 0035506624 scopus 로고    scopus 로고
    • Monte Carlo computation of power generation production costs under operating constraints
    • DOI 10.1109/59.962412, PII S0885895001094263
    • J. Valenzuela and M. Mazumdar, "Monte Carlo computation of power generation production costs under operating constraints," IEEE Trans. Power Syst., vol. 16, no. 4, pp. 671-677, Nov. 2001. (Pubitemid 33106113)
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.4 , pp. 671-677
    • Valenzuela, J.1    Mazumdar, M.2
  • 32
    • 77958471988 scopus 로고    scopus 로고
    • Fast identification of inactive security constraints in SCUC problems
    • Nov.
    • Q. Zhai, X. Guan, J. Cheng, and H. Wu, "Fast identification of inactive security constraints in SCUC problems," IEEE Trans. Power Syst., vol. 25, no. 4, pp. 1946-1954, Nov. 2010.
    • (2010) IEEE Trans. Power Syst. , vol.25 , Issue.4 , pp. 1946-1954
    • Zhai, Q.1    Guan, X.2    Cheng, J.3    Wu, H.4
  • 33
    • 84856260970 scopus 로고    scopus 로고
    • A systematic method for constructing feasible solution to SCUC problem with analytical feasibility conditions
    • Feb.
    • H. Wu, X. Guan, Q. Zhai, and H. Ye, "A systematic method for constructing feasible solution to SCUC problem with analytical feasibility conditions," IEEE Trans. Power Syst., vol. 27, no. 1, pp. 526-534, Feb. 2012.
    • (2012) IEEE Trans. Power Syst. , vol.27 , Issue.1 , pp. 526-534
    • Wu, H.1    Guan, X.2    Zhai, Q.3    Ye, H.4
  • 34
    • 84903289774 scopus 로고    scopus 로고
    • ILOG CPLEX, ILOG CPLEX Homepage, Nov. 2010. [Online].
    • ILOG CPLEX, ILOG CPLEX Homepage 2009, Nov. 2010. [Online]. Available: http://www.ilog.com.
    • (2009)
  • 35
    • 0029356615 scopus 로고
    • A direct method for security-constrained unit commitment
    • Aug.
    • J. J. Shaw, "A direct method for security-constrained unit commitment," IEEE Trans. Power Syst., vol. 10, no. 3, pp. 1329-1342, Aug. 1995.
    • (1995) IEEE Trans. Power Syst. , vol.10 , Issue.3 , pp. 1329-1342
    • Shaw, J.J.1
  • 36
    • 33751071102 scopus 로고    scopus 로고
    • Scenario reduction in stochastic programming An approach using probability metrics
    • DOI 10.1007/s10107-002-0331-0
    • J. Dupač;ová, N. Gröwe-Kuska, and W. Römisch, "Scenario reduction in stochastic programming: An approach using probability metrics," Math. Program., vol. A, no. 95, pp. 493-511, 2003. (Pubitemid 44769765)
    • (2003) Mathematical Programming, Series B , vol.95 , Issue.3 , pp. 493-511
    • Dupacova, J.1    Growe-Kuska, N.2    Romisch, W.3
  • 37
    • 84860259834 scopus 로고    scopus 로고
    • Comparison of scenario-based and interval optimization approaches to stochastic SCUC
    • May.
    • L. Wu, M. Shahidehpour, and Z. Li, "Comparison of scenario-based and interval optimization approaches to stochastic SCUC," IEEE Trans. Power Syst., vol. 27, no. 2, pp. 913-921, May 2012.
    • (2012) IEEE Trans. Power Syst. , vol.27 , Issue.2 , pp. 913-921
    • Wu, L.1    Shahidehpour, M.2    Li, Z.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.