-
1
-
-
78649933344
-
The next generation of power distribution systems
-
Dec.
-
G. T. Heydt, "The next generation of power distribution systems," IEEE Trans. Smart Grid, vol. 1, no. 3, pp. 225-235, Dec. 2010.
-
(2010)
IEEE Trans. Smart Grid
, vol.1
, Issue.3
, pp. 225-235
-
-
Heydt, G.T.1
-
2
-
-
33747610968
-
Power-electronic systems for the grid integration of renewable energy sources: A survey
-
DOI 10.1109/TIE.2006.878356
-
J. Carrasco, L. Franquelo, J. Bialasiewicz, E. Galvan, R. Guisado, M. Prats, J. Leon, and N. Moreno-Alfonso, "Power electronic systems for the grid integration of renewable energy sources: A survey," IEEE Trans. Power Electron., vol. 53, no. 4, pp. 1002-1016, Aug. 2006. (Pubitemid 44263711)
-
(2006)
IEEE Transactions on Industrial Electronics
, vol.53
, Issue.4
, pp. 1002-1016
-
-
Carrasco, J.M.1
Franquelo, L.G.2
Bialasiewicz, J.T.3
Galvan, E.4
Portillo Guisado, R.C.5
Prats, Ma.A.M.6
Leon, J.I.7
Moreno-Alfonso, N.8
-
3
-
-
61649085846
-
Microgrid dynamic performance improvement using a doubly fed induction wind generator
-
Mar.
-
M. Shahabi, M. R. Haghifam, M. Mohamadian, and S. A. Nabavi-Niaki, "Microgrid dynamic performance improvement using a doubly fed induction wind generator," IEEE Trans. Energy Convers., vol. 24, no. 1, pp. 137-145, Mar. 2009.
-
(2009)
IEEE Trans. Energy Convers.
, vol.24
, Issue.1
, pp. 137-145
-
-
Shahabi, M.1
Haghifam, M.R.2
Mohamadian, M.3
Nabavi-Niaki, S.A.4
-
4
-
-
80052372715
-
Energy management and operational planning of a microgrid with a PV-based active generator for smart grid applications
-
Oct.
-
H. Kanchev, D. Lu, F. Colas, V. Lazarov, and B. Francois, "Energy management and operational planning of a microgrid with a PV-based active generator for smart grid applications," IEEE Trans, Ind. Electron., vol. 58, no. 10, pp. 4583-4592, Oct. 2011.
-
(2011)
IEEE Trans, Ind. Electron.
, vol.58
, Issue.10
, pp. 4583-4592
-
-
Kanchev, H.1
Lu, D.2
Colas, F.3
Lazarov, V.4
Francois, B.5
-
5
-
-
65349142690
-
Load sharing and power quality enhanced operation of a distributed microgrid
-
Jun.
-
R. Majumder, A. Ghosh, G. Ledwich, and F. Zare, "Load sharing and power quality enhanced operation of a distributed microgrid," IET Renewable Power Generation, vol. 3, no. 2, pp. 109-119, Jun. 2009.
-
(2009)
IET Renewable Power Generation
, vol.3
, Issue.2
, pp. 109-119
-
-
Majumder, R.1
Ghosh, A.2
Ledwich, G.3
Zare, F.4
-
6
-
-
79956366049
-
Smart distribution: Coupled microgrids
-
Jun.
-
R. H. Lasseter, "Smart distribution: Coupled microgrids," Proc. IEEE, vol. 99, no. 6, pp. 1074-1082, Jun. 2011.
-
(2011)
Proc. IEEE
, vol.99
, Issue.6
, pp. 1074-1082
-
-
Lasseter, R.H.1
-
7
-
-
77955696530
-
A reliability perspective of the smart grid
-
Jun.
-
K. Moslehi and R. Kumar, "A reliability perspective of the smart grid," IEEE Trans. Smart Grid, vol. 1, no. 1, pp. 57-64, Jun. 2010.
-
(2010)
IEEE Trans. Smart Grid
, vol.1
, Issue.1
, pp. 57-64
-
-
Moslehi, K.1
Kumar, R.2
-
8
-
-
84655169726
-
Generalized systematic approach to assess distribution system reliability with renewable distributed generators and microgrids
-
Jan.
-
S. Conti, R. Nicolosi, and S. A. Rizzo, "Generalized systematic approach to assess distribution system reliability with renewable distributed generators and microgrids," IEEE Trans. Power Del., vol. 27, no. 1, pp. 261-270, Jan. 2012.
-
(2012)
IEEE Trans. Power Del.
, vol.27
, Issue.1
, pp. 261-270
-
-
Conti, S.1
Nicolosi, R.2
Rizzo, S.A.3
-
9
-
-
49249134136
-
Reliability evaluation of customers in a mi-crogrid
-
Aug.
-
I.-S. Bae and J.-O. Kim, "Reliability evaluation of customers in a mi-crogrid," IEEE Trans. Power Syst., vol. 23, no. 3, pp. 1416-1422, Aug. 2008.
-
(2008)
IEEE Trans. Power Syst.
, vol.23
, Issue.3
, pp. 1416-1422
-
-
Bae, I.-S.1
Kim, J.-O.2
-
10
-
-
78650897854
-
Probabilistic reliability indices evaluation of electrical distribution system, accounting outage due to overloading and repair time omission
-
L. D. Arya, S. C. Choube, and R. Arya, "Probabilistic reliability indices evaluation of electrical distribution system, accounting outage due to overloading and repair time omission," Elect. Power Energy Syst. J., vol. 32, pp. 296-302, 2011.
-
(2011)
Elect. Power Energy Syst. J.
, vol.32
, pp. 296-302
-
-
Arya, L.D.1
Choube, S.C.2
Arya, R.3
-
11
-
-
34248589615
-
Reliability evaluation of distributed generation based on operation mode
-
DOI 10.1109/TPWRS.2007.894842
-
I.-S. Bae and J.-O. Kim, "Reliability evaluation of distributed genera tion based on operation mode," IEEE Trans. Power Syst., vol. 22, no. 2, pp. 785-790, May 2007. (Pubitemid 46746242)
-
(2007)
IEEE Transactions on Power Systems
, vol.22
, Issue.2
, pp. 785-790
-
-
Bae, I.-S.1
Kim, J.-O.2
-
12
-
-
84865500813
-
Supply-adequacy-based optimal construction of microgrids in smart distribution systems
-
Sep.
-
S. A. Arefifar, Y. A.-R. I Mohamed, and T. H. M. El-Fouly, "Supply-adequacy-based optimal construction of microgrids in smart distribution systems," IEEE Trans. Smart Grid, vol. 3, no. 3, pp. 1491-1502, Sep. 2012.
-
(2012)
IEEE Trans. Smart Grid
, vol.3
, Issue.3
, pp. 1491-1502
-
-
Arefifar, S.A.1
Mohamed, Y.A.-R.I.2
El-Fouly, T.H.M.3
-
13
-
-
84883289621
-
Optimum microgrid design for enhancing reliability and supply-security
-
Sep.
-
S. A. Arefifar, Y. A.-R. I Mohamed, and T. H. M. El-Fouly, "Optimum microgrid design for enhancing reliability and supply-security," IEEE Trans. Smart Grid, vol. 4, no. 3, pp. 1567-1575, Sep. 2013.
-
(2013)
IEEE Trans. Smart Grid
, vol.4
, Issue.3
, pp. 1567-1575
-
-
Arefifar, S.A.1
Mohamed, Y.A.-R.I.2
El-Fouly, T.H.M.3
-
14
-
-
42549159422
-
Recloser allocation for improved reliability of DG-enhanced distribution networks
-
Jun. 24-28
-
A. Pregelj, M. Begovic, and A. Rohatgi, "Recloser allocation for improved reliability of DG-enhanced distribution networks," in Proc. IEEE Power Eng. Soc. General Meeting, Jun. 24-28, 2007, p. 1.
-
(2007)
Proc. IEEE Power Eng. Soc. General Meeting
, pp. 1
-
-
Pregelj, A.1
Begovic, M.2
Rohatgi, A.3
-
15
-
-
0003776432
-
-
New York, NY, USA: Premium
-
R. Billinton and R. N. Allan, Reliability Evaluation of Power Systems, 2nd ed. New York, NY, USA: Premium, 1996.
-
(1996)
Reliability Evaluation of Power Systems, 2nd Ed
-
-
Billinton, R.1
Allan, R.N.2
-
16
-
-
77951667150
-
Slow coherency based cutset determination algorithm for large power systems
-
May
-
G. Xu and V. Vittal, "Slow coherency based cutset determination algorithm for large power systems," IEEE Trans. Power Syst., vol. 25, no. 2, pp. 877-884, May 2010.
-
(2010)
IEEE Trans. Power Syst.
, vol.25
, Issue.2
, pp. 877-884
-
-
Xu, G.1
Vittal, V.2
-
17
-
-
78649349941
-
Controlled partitioning of a power network considering real and reactive power balance
-
Dec.
-
J. Li, C. Liu, and K. P. Schneider, "Controlled partitioning of a power network considering real and reactive power balance," IEEE Trans. Smart Grid, vol. 1, no. 3, pp. 261-269, Dec. 2010.
-
(2010)
IEEE Trans. Smart Grid
, vol.1
, Issue.3
, pp. 261-269
-
-
Li, J.1
Liu, C.2
Schneider, K.P.3
-
18
-
-
0031999376
-
Probing the new ieee reliability test system (rts-96): Hl-ii assessment
-
J. M. S. Pinheiro, C. R. R. Dornellas, M. T. Schilling, A. C. G. Melo, and G. C. O. Mello, "Probing the new IEEE reliability test system (RTS-96): HL-II assessment," IEEE Trans. Power Syst., vol. 13, no. 1, pp. 171-176, Feb. 1998. (Pubitemid 128748854)
-
(1998)
IEEE Transactions on Power Systems
, vol.13
, Issue.1
, pp. 171-176
-
-
Pinheiro, J.M.S.1
-
19
-
-
35148880064
-
Impact of network reconfiguration on loss allocation of radial distribution systems
-
DOI 10.1109/TPWRD.2007.905370
-
J. S. Savier and D. Das, "Impact of network reconfiguration on loss allocation of radial distribution systems," IEEE Trans. Power Del., vol. 22, no. 4, pp. 2473-2480, Oct. 2007. (Pubitemid 47542822)
-
(2007)
IEEE Transactions on Power Delivery
, vol.22
, Issue.4
, pp. 2473-2480
-
-
Savier, J.S.1
Das, D.2
-
20
-
-
77958502188
-
Optimal allocation of ESS in distribution systems with a high penetration of wind energy
-
Nov.
-
Y. M. Atwa and E. F. El-Saadany, "Optimal allocation of ESS in distribution systems with a high penetration of wind energy," IEEE Trans. Power Syst., vol. 25, no. 4, pp. 1815-1822, Nov. 2010.
-
(2010)
IEEE Trans. Power Syst.
, vol.25
, Issue.4
, pp. 1815-1822
-
-
Atwa, Y.M.1
El-Saadany, E.F.2
-
21
-
-
0000411214
-
Tabu search-Part i
-
F. Glover, "Tabu search-Part I," ORSA J. Comput., vol. 1, no. 3, pp. 190-206, 1989.
-
(1989)
ORSA J. Comput.
, vol.1
, Issue.3
, pp. 190-206
-
-
Glover, F.1
-
22
-
-
0001724713
-
Tabu search-Part II
-
F. Glover, "Tabu search-Part II," ORSA J. Comput., vol. 2, no. 1, pp. 4-32, 1990.
-
(1990)
ORSA J. Comput.
, vol.2
, Issue.1
, pp. 4-32
-
-
Glover, F.1
|