메뉴 건너뛰기




Volumn 62, Issue 6, 2014, Pages 1908-1920

Computationally efficient robust beamforming for SINR balancing in multicell downlink with applications to large antenna array systems

Author keywords

Interference channel; Massive MIMO; Multicell beamforming; Reduced complexity; SINR balancing; Very largescale antenna arrays

Indexed keywords

ANTENNA ARRAYS; BASE STATIONS; BEAMFORMING; CONVEX OPTIMIZATION; INTERFERENCE SUPPRESSION; OPTIMIZATION; SPURIOUS SIGNAL NOISE;

EID: 84903168794     PISSN: 00906778     EISSN: None     Source Type: Journal    
DOI: 10.1109/TCOMM.2014.2320913     Document Type: Article
Times cited : (36)

References (37)
  • 1
    • 84860389999 scopus 로고    scopus 로고
    • Pilot contamination and precoding in multi-cell TDD systems
    • Aug.
    • J. Jose, A. Ashikhmin, T. L. Marzetta, and S. Vishwanath, "Pilot contamination and precoding in multi-cell TDD systems," IEEE Trans. Wireless Commun., vol. 10, no. 8, pp. 2640-2651, Aug. 2011.
    • (2011) IEEE Trans. Wireless Commun. , vol.10 , Issue.8 , pp. 2640-2651
    • Jose, J.1    Ashikhmin, A.2    Marzetta, T.L.3    Vishwanath, S.4
  • 2
    • 77952276226 scopus 로고    scopus 로고
    • Capacity limits and performance analysis of cognitive radio with imperfect channel knowledge
    • May
    • H. A. Suraweera, P. J. Smith, and M. Shafi, "Capacity limits and performance analysis of cognitive radio with imperfect channel knowledge," IEEE Trans. Veh. Technol., vol. 59, no. 4, pp. 1811-1822, May 2010.
    • (2010) IEEE Trans. Veh. Technol. , vol.59 , Issue.4 , pp. 1811-1822
    • Suraweera, H.A.1    Smith, P.J.2    Shafi, M.3
  • 3
    • 0037304809 scopus 로고    scopus 로고
    • Robust adaptive beamforming using worst-case performance optimization: A solution to the signal mismatch problem
    • Feb.
    • S. A. Vorobyov, A. B. Gershman, and Z.-Q. Luo, "Robust adaptive beamforming using worst-case performance optimization: A solution to the signal mismatch problem," IEEE Trans. Signal Process., vol. 51, no. 2, pp. 313-324, Feb. 2003.
    • (2003) IEEE Trans. Signal Process. , vol.51 , Issue.2 , pp. 313-324
    • Vorobyov, S.A.1    Gershman, A.B.2    Luo, Z.-Q.3
  • 4
    • 60549116535 scopus 로고    scopus 로고
    • Robust QoS-constrained optimization of downlink multiuser MISO systems
    • Feb.
    • N. Vucic and H. Boche, "Robust QoS-constrained optimization of downlink multiuser MISO systems," IEEE Trans. Signal Process., vol. 57, no. 2, pp. 714-725, Feb. 2009.
    • (2009) IEEE Trans. Signal Process. , vol.57 , Issue.2 , pp. 714-725
    • Vucic, N.1    Boche, H.2
  • 5
    • 70450284436 scopus 로고    scopus 로고
    • Robust cognitive beamforming with bounded channel uncertainties
    • Dec.
    • G. Zheng, K. K. Wong, and B. Ottersten, "Robust cognitive beamforming with bounded channel uncertainties," IEEE Trans. Signal Process., vol. 57, no. 12, pp. 4871-4881, Dec. 2009.
    • (2009) IEEE Trans. Signal Process. , vol.57 , Issue.12 , pp. 4871-4881
    • Zheng, G.1    Wong, K.K.2    Ottersten, B.3
  • 6
    • 80455139463 scopus 로고    scopus 로고
    • Robust linear precoder design for multi-cell downlink transmission
    • Jan.
    • A. Tajer, N. Prasad, and X. Wang, "Robust linear precoder design for multi-cell downlink transmission," IEEE Trans. Signal Process., vol. 59, no. 1, pp. 235-251, Jan. 2011.
    • (2011) IEEE Trans. Signal Process. , vol.59 , Issue.1 , pp. 235-251
    • Tajer, A.1    Prasad, N.2    Wang, X.3
  • 7
    • 84863393058 scopus 로고    scopus 로고
    • Theory and applications of robust optimization
    • D. Bertsimas, D. B. Brown, and C. Caramanis, "Theory and applications of robust optimization," SIAM Rev., vol. 53, no. 3, pp. 464-501, 2011.
    • (2011) SIAM Rev. , vol.53 , Issue.3 , pp. 464-501
    • Bertsimas, D.1    Brown, D.B.2    Caramanis, C.3
  • 9
    • 85032752174 scopus 로고    scopus 로고
    • Scaling up MIMO: Opportunities and challenges with very large arrays
    • Jan.
    • F. Rusek et al., "Scaling up MIMO: Opportunities and challenges with very large arrays," IEEE Signal Process. Mag., vol. 30, no. 1, pp. 40-60, Jan. 2013.
    • (2013) IEEE Signal Process. Mag. , vol.30 , Issue.1 , pp. 40-60
    • Rusek, F.1
  • 10
    • 84869151965 scopus 로고    scopus 로고
    • Fast converging algorithm for weighted sum rate maximization in multicell MISO downlink
    • Dec.
    • L.-N. Tran, M. F. Hanif, A. Tolli, and M. Juntti, "Fast converging algorithm for weighted sum rate maximization in multicell MISO downlink," IEEE Signal Process. Lett., vol. 19, no. 12, pp. 872-875, Dec. 2012.
    • (2012) IEEE Signal Process. Lett. , vol.19 , Issue.12 , pp. 872-875
    • Tran, L.-N.1    Hanif, M.F.2    Tolli, A.3    Juntti, M.4
  • 11
    • 46749087159 scopus 로고    scopus 로고
    • Linear multiuser MIMO transceiver design with quality of service and per-antenna power constraints
    • Jul.
    • A. Tolli, M. Codreanu, andM. Juntti, "Linear multiuserMIMO transceiver design with quality of service and per-antenna power constraints," IEEE Trans. Signal Process., vol. 56, no. 7, pp. 3049-3055, Jul. 2008.
    • (2008) IEEE Trans. Signal Process. , vol.56 , Issue.7 , pp. 3049-3055
    • Tolli, A.1    Codreanu, M.2    Juntti, M.3
  • 12
    • 30344463816 scopus 로고    scopus 로고
    • Linear precoding via conic optimization for fixed MIMO receivers
    • DOI 10.1109/TSP.2005.861073
    • A. Wiesel, Y. C. Eldar, and S. Shamai, "Linear precoding via conic optimization for fixed MIMO receivers," IEEE Trans. Signal Process., vol. 54, no. 1, pp. 161-176, Jan. 2006. (Pubitemid 43065790)
    • (2006) IEEE Transactions on Signal Processing , vol.54 , Issue.1 , pp. 161-176
    • Wiesel, A.1    Eldar, Y.C.2    Shamai, S.3
  • 14
    • 84872875302 scopus 로고    scopus 로고
    • Massive MIMO in the UL/DL of cellular networks: How many antennas do we need?
    • Feb.
    • J. Hoydis, S. ten Brink, andM. Debbah, "Massive MIMO in the UL/DL of cellular networks: How many antennas do we need?" IEEE J. Sel. Areas Commun., vol. 31, no. 2, pp. 160-171, Feb. 2013.
    • (2013) IEEE J. Sel. Areas Commun. , vol.31 , Issue.2 , pp. 160-171
    • Hoydis, J.1    Ten Brink, S.2    Debbah, M.3
  • 16
    • 33644689113 scopus 로고    scopus 로고
    • Tractable approximations to robust conic optimization problems
    • DOI 10.1007/s10107-005-0677-1
    • D. Bertsimas and M. Sim, "Tractable approximations to robust conic optimization problems," Math. Program., vol. 107, no. 1, pp. 5-36, Jun. 2006. (Pubitemid 43334012)
    • (2006) Mathematical Programming , vol.107 , Issue.1-2 , pp. 5-36
    • Bertsimas, D.1    Sim, M.2
  • 17
    • 78449301600 scopus 로고    scopus 로고
    • Noncooperative cellular wireless with unlimited numbers of base station antennas
    • Nov.
    • T. L. Marzetta, "Noncooperative cellular wireless with unlimited numbers of base station antennas," IEEE Trans. Wireless Commun., vol. 9, no. 11, pp. 3590-3600, Nov. 2010.
    • (2010) IEEE Trans. Wireless Commun. , vol.9 , Issue.11 , pp. 3590-3600
    • Marzetta, T.L.1
  • 18
    • 33646065945 scopus 로고    scopus 로고
    • Capacity and power allocation for fading MIMO channels with channel estimation error
    • May
    • T. Yoo and A. Goldsmith, "Capacity and power allocation for fading MIMO channels with channel estimation error," IEEE Trans. Inf. Theory, vol. 52, no. 5, pp. 2203-2214, May 2006.
    • (2006) IEEE Trans. Inf. Theory , vol.52 , Issue.5 , pp. 2203-2214
    • Yoo, T.1    Goldsmith, A.2
  • 19
    • 34147188953 scopus 로고    scopus 로고
    • Analysis of multiple-antenna systems with finite-rate feedback using high-resolution quantization theory
    • DOI 10.1109/TSP.2006.889407
    • J. Zheng, E. Duni, and B. Rao, "Analysis of multiple-antenna systems with finite-rate feedback using high-resolution quantization theory," IEEE Trans. Signal Process., vol. 55, no. 4, pp. 1461-1476, Apr. 2007. (Pubitemid 46563167)
    • (2007) IEEE Transactions on Signal Processing , vol.55 , Issue.4 , pp. 1461-1476
    • Zheng, J.1    Duni, E.R.2    Rao, B.D.3
  • 21
    • 80051612678 scopus 로고    scopus 로고
    • Robust SINR-constrained MISO downlink beamforming: When is semidefinite programming relaxation tight?
    • May
    • E. Song, Q. Shi, M. Sanjabi, R. Sun, and Z.-Q. Luo, "Robust SINR-constrained MISO downlink beamforming: When is semidefinite programming relaxation tight?" in Proc. IEEE ICASSP, May 2011, pp. 3096-3099.
    • (2011) Proc. IEEE ICASSP , pp. 3096-3099
    • Song, E.1    Shi, Q.2    Sanjabi, M.3    Sun, R.4    Luo, Z.-Q.5
  • 22
    • 85032752455 scopus 로고    scopus 로고
    • Semidefinite relaxation of quadratic optimization problems
    • May
    • Z.-Q. Luo, W. K. Ma, A. M. Cho, Y. Ye, and S. Zhang, "Semidefinite relaxation of quadratic optimization problems," IEEE Signal Process. Mag., vol. 27, no. 3, pp. 20-34, May 2010.
    • (2010) IEEE Signal Process. Mag. , vol.27 , Issue.3 , pp. 20-34
    • Luo, Z.-Q.1    Ma, W.K.2    Cho, A.M.3    Ye, Y.4    Zhang, S.5
  • 23
    • 36248932002 scopus 로고    scopus 로고
    • Constrained stochastic LQC: A tractable approach
    • DOI 10.1109/TAC.2007.906182
    • D. Bertsimas and D. B. Brown, "Constrained stochastic LQC: A tractable approach," IEEE Trans. Autom. Control, vol. 52, no. 10, pp. 1826-1841, Oct. 2007. (Pubitemid 350130524)
    • (2007) IEEE Transactions on Automatic Control , vol.52 , Issue.10 , pp. 1826-1841
    • Bertsimas, D.1    Brown, D.B.2
  • 24
    • 65649121907 scopus 로고    scopus 로고
    • Nonlinear and linear broadcasting with QoS requirements: Tractable approaches for bounded channel uncertainties
    • May
    • M. Shenouda and T. Davidson, "Nonlinear and linear broadcasting with QoS requirements: Tractable approaches for bounded channel uncertainties," IEEE Trans. Signal Process., vol. 57, no. 5, pp. 1936-1947, May 2009.
    • (2009) IEEE Trans. Signal Process. , vol.57 , Issue.5 , pp. 1936-1947
    • Shenouda, M.1    Davidson, T.2
  • 25
    • 0442266090 scopus 로고    scopus 로고
    • Robust solutions of linear programming problems contaminated with uncertain data
    • Sep.
    • A. B. Tal and A. Nemirovski, "Robust solutions of linear programming problems contaminated with uncertain data," Math. Program., vol. 88, no. 3, pp. 411-424, Sep. 2000.
    • (2000) Math. Program. , vol.88 , Issue.3 , pp. 411-424
    • Tal, A.B.1    Nemirovski, A.2
  • 26
    • 0030106462 scopus 로고    scopus 로고
    • Semidefinite programming
    • L. Vandenberghe and S. Boyd, "Semidefinite programming," SIAM Rev., vol. 38, no. 1, pp. 49-95, Mar. 1996. (Pubitemid 126610912)
    • (1996) SIAM Review , vol.38 , Issue.1 , pp. 49-95
    • Vandenberghe, L.1    Boyd, S.2
  • 28
    • 1842533452 scopus 로고    scopus 로고
    • Transceiver optimization for block-based multiple access through ISI channels
    • Apr.
    • Z.-Q. Luo, T. N. Davidson, G. B. Giannakis, and K. M. Wong, "Transceiver optimization for block-based multiple access through ISI channels," IEEE Trans. Signal Process., vol. 52, no. 4, pp. 1037-1052, Apr. 2004.
    • (2004) IEEE Trans. Signal Process. , vol.52 , Issue.4 , pp. 1037-1052
    • Luo, Z.-Q.1    Davidson, T.N.2    Giannakis, G.B.3    Wong, K.M.4
  • 29
    • 79961019332 scopus 로고    scopus 로고
    • RACT: Randomized algorithms control toolbox for MATLAB
    • Seoul, Korea
    • A. Tremba et al., "RACT: Randomized algorithms control toolbox for MATLAB," in Proc. 17th World Congr. IFAC, Seoul, Korea, 2008, pp. 390-395.
    • (2008) Proc. 17th World Congr. IFAC , pp. 390-395
    • Tremba, A.1
  • 31
    • 0033296299 scopus 로고    scopus 로고
    • Using SeDuMi 1.02, a MATLAB toolbox for optimization over symmetric cones
    • Jan.
    • J. F. Sturm, "Using SeDuMi 1.02, a MATLAB toolbox for optimization over symmetric cones," Optim. Methods Softw., vol. 11, no. 1-4, pp. 625- 653, Jan. 1999.
    • (1999) Optim. Methods Softw. , vol.11 , Issue.1-4 , pp. 625-653
    • Sturm, J.F.1
  • 32
    • 0033295027 scopus 로고    scopus 로고
    • SDPT3-AMatlab software package for semidefinite programming, version 1.3
    • Jan.
    • K. C. Toha,M. J. Todd, and R. H. Tutuncuc, "SDPT3-AMatlab software package for semidefinite programming, version 1.3," Optim. Methods Softw., vol. 11, no. 1-4, pp. 545-581, Jan. 1999.
    • (1999) Optim. Methods Softw. , vol.11 , Issue.1-4 , pp. 545-581
    • Toha, K.C.1    Todd, M.J.2    Tutuncuc, R.H.3
  • 34
    • 84877926659 scopus 로고    scopus 로고
    • Energy and spectral efficiency of very large multiuser MIMO systems
    • Apr.
    • H. Q. Ngo, E. G. Larsson, and T. L. Marzetta (2013, Apr.). Energy and spectral efficiency of very large multiuser MIMO systems. IEEE Trans. Commun. [Online]. 61(4), pp. 1436-1449. Available: http://arxiv.org/abs/1112.3810
    • (2013) IEEE Trans. Commun. [Online] , vol.61 , Issue.4 , pp. 1436-1449
    • Ngo, H.Q.1    Larsson, E.G.2    Marzetta, T.L.3
  • 35
    • 84862625997 scopus 로고    scopus 로고
    • Iterative precoder design and user scheduling for block-diagonalized systems
    • Jul.
    • L.-N. Tran, M. Bengtsson, and B. Ottersten, "Iterative precoder design and user scheduling for block-diagonalized systems," IEEE Trans. Signal Process., vol. 60, no. 7, pp. 3726-3739, Jul. 2012.
    • (2012) IEEE Trans. Signal Process. , vol.60 , Issue.7 , pp. 3726-3739
    • Tran, L.-N.1    Bengtsson, M.2    Ottersten, B.3
  • 36
    • 84875598495 scopus 로고    scopus 로고
    • Beamformer designs for MISO broadcast channels with zero-forcing dirty paper coding
    • Mar.
    • L.-N. Tran, M. Juntti, M. Bengtsson, and B. Ottersten, "Beamformer designs for MISO broadcast channels with zero-forcing dirty paper coding," IEEE Trans. Wireless Commun., vol. 12, no. 3, pp. 1173-1185, Mar. 2013.
    • (2013) IEEE Trans. Wireless Commun. , vol.12 , Issue.3 , pp. 1173-1185
    • Tran, L.-N.1    Juntti, M.2    Bengtsson, M.3    Ottersten, B.4
  • 37
    • 84872840920 scopus 로고    scopus 로고
    • A coordinated approach to channel estimation in large-scale multiple-antenna systems
    • Feb.
    • H. Yin, D. Gesbert, M. Filippou, and Y. Liu, "A coordinated approach to channel estimation in large-scale multiple-antenna systems," IEEE J. Sel. Areas Commun., vol. 31, no. 2, pp. 264-273, Feb. 2013.
    • (2013) IEEE J. Sel. Areas Commun. , vol.31 , Issue.2 , pp. 264-273
    • Yin, H.1    Gesbert, D.2    Filippou, M.3    Liu, Y.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.