-
1
-
-
84862789524
-
An integrated model for closed-loop supply chain configuration and supplier selection: Multi-objective approach
-
Amin, S. H., and G. Zhang. 2012. "An Integrated Model for Closed-loop Supply Chain Configuration and Supplier Selection: Multi-objective Approach." Expert Systems with Applications 39 (8): 6782-6791.
-
(2012)
Expert Systems with Applications
, vol.39
, Issue.8
, pp. 6782-6791
-
-
Amin, S.H.1
Zhang, G.2
-
2
-
-
84872621211
-
A multi-objective facility location model for closed-loop supply chain network under uncertain demand and return
-
Amin, S. H., and G. Zhang. 2013. "A Multi-objective Facility Location Model for Closed-loop Supply Chain Network Under Uncertain Demand and Return." Applied Mathematical Modelling 37 (6): 4165-4176.
-
(2013)
Applied Mathematical Modelling
, vol.37
, Issue.6
, pp. 4165-4176
-
-
Amin, S.H.1
Zhang, G.2
-
3
-
-
23644462646
-
Formalization of reverse logistics programs: A strategy for managing liberalized returns
-
Autry, C. W. 2005. "Formalization of Reverse Logistics Programs: A Strategy for Managing Liberalized Returns." Industrial Marketing Management 34 (7): 749-757.
-
(2005)
Industrial Marketing Management
, vol.34
, Issue.7
, pp. 749-757
-
-
Autry, C.W.1
-
4
-
-
0031256632
-
Eco-efficiency, asset recovery and remanufacturing
-
Ayres, R., G. Ferrer, and T. Van Leynseele. 1997. "Eco-efficiency, Asset Recovery and Remanufacturing." European Management Journal 15 (5): 557-574.
-
(1997)
European Management Journal
, vol.15
, Issue.5
, pp. 557-574
-
-
Ayres, R.1
Ferrer, G.2
Van Leynseele, T.3
-
5
-
-
3142647690
-
Supply-chain network configuration for product recovery
-
Beamon, B. M., and C. Fernandes. 2004. "Supply-chain Network Configuration for Product Recovery." Production Planning & Control 15 (3): 270-281.
-
(2004)
Production Planning & Control
, vol.15
, Issue.3
, pp. 270-281
-
-
Beamon, B.M.1
Fernandes, C.2
-
6
-
-
0010896025
-
Developing a theory of reverse logistics
-
Dowlatshahi, S. 2000. "Developing a Theory of Reverse Logistics." Interfaces 30 (3): 143-155.
-
(2000)
Interfaces
, vol.30
, Issue.3
, pp. 143-155
-
-
Dowlatshahi, S.1
-
7
-
-
0037410423
-
Fuzzy Scheduling: Modelling Flexible Constraints vs. Coping with Incomplete Knowledge
-
Dubois, D., H. Fargier, and P. Fortemps. 2003. "Fuzzy Scheduling: Modelling Flexible Constraints vs. Coping with Incomplete Knowledge." European Journal of Operational Research 147 (2): 231-252.
-
(2003)
European Journal of Operational Research
, vol.147
, Issue.2
, pp. 231-252
-
-
Dubois, D.1
Fargier, H.2
Fortemps, P.3
-
8
-
-
77949486920
-
A stochastic model for forward-reverse logistics network design under risk
-
El-Sayed, M., N. Afia, and A. El-Kharbotly. 2010. "A Stochastic Model for Forward-reverse Logistics Network Design Under Risk." Computers & Industrial Engineering 58 (3): 423-431.
-
(2010)
Computers & Industrial Engineering
, vol.58
, Issue.3
, pp. 423-431
-
-
El-Sayed, M.1
Afia, N.2
El-Kharbotly, A.3
-
9
-
-
0031259984
-
The economics of personal computer remanufacturing
-
Ferrer, G. 1997a. "The Economics of Personal Computer Remanufacturing." Resources, Conservation and Recycling 21 (2): 79-108.
-
(1997)
Resources, Conservation and Recycling
, vol.21
, Issue.2
, pp. 79-108
-
-
Ferrer, G.1
-
10
-
-
0031127674
-
The economics of tire remanufacturing
-
Ferrer, G. 1997b. "The Economics of tire Remanufacturing." Resources, Conservation and Recycling 19 (4): 221-255.
-
(1997)
Resources, Conservation and Recycling
, vol.19
, Issue.4
, pp. 221-255
-
-
Ferrer, G.1
-
11
-
-
0031277045
-
Quantitative models for reverse logistics: A review
-
Fleischmann, M., J. M. Bloemhof-Ruwaard, R. Dekker, E. van der Laan, J. A. E. E. van Nunen, and L. N. Van Wassenhove. 1997. "Quantitative Models for Reverse Logistics: A Review." European Journal of Operational Research 103 (1): 1-17.
-
(1997)
European Journal of Operational Research
, vol.103
, Issue.1
, pp. 1-17
-
-
Fleischmann, M.1
Bloemhof-Ruwaard, J.M.2
Dekker, R.3
Van Der Laan, E.4
Van Nunen, J.A.E.E.5
Van Wassenhove, L.N.6
-
13
-
-
0033738099
-
Production planning and control for remanufacturing: Industry practice and research needs
-
Guide Jr, V. D. R. 2000. "Production Planning and Control for Remanufacturing: Industry Practice and Research Needs." Journal of Operations Management 18 (4): 467-483.
-
(2000)
Journal of Operations Management
, vol.18
, Issue.4
, pp. 467-483
-
-
Guide Jr., V.D.R.1
-
14
-
-
0033358107
-
Issues in environmentally conscious manufacturing and product recovery: A survey
-
Gungor, A., and S. M. Gupta. 1999. "Issues in Environmentally Conscious Manufacturing and Product Recovery: A Survey." Computers and Industrial Engineering 36 (4): 811-853.
-
(1999)
Computers and Industrial Engineering
, vol.36
, Issue.4
, pp. 811-853
-
-
Gungor, A.1
Gupta, S.M.2
-
15
-
-
84655176638
-
Design of sustainable end-of-life vehicle recovery network in egypt
-
Harraz, N. A., and N. M. Galal. 2011. "Design of Sustainable End-of-life Vehicle Recovery Network in Egypt." Ain Shams Engineering Journal 2 (3-4): 211-219.
-
(2011)
Ain Shams Engineering Journal
, vol.2
, Issue.3-4
, pp. 211-219
-
-
Harraz, N.A.1
Galal, N.M.2
-
16
-
-
21244492844
-
Impact of uncertainties on recovery behavior in a remanufacturing environment: A numerical analysis
-
Inderfurth, K. 2005. "Impact of Uncertainties on Recovery Behavior in a Remanufacturing Environment: A Numerical Analysis." International Journal of Physical Distribution & Logistics Management 35 (5): 318-336.
-
(2005)
International Journal of Physical Distribution & Logistics Management
, vol.35
, Issue.5
, pp. 318-336
-
-
Inderfurth, K.1
-
17
-
-
32644458769
-
Production planning for closed-loop supply chains with product recovery and reuse: An analytical approach
-
Jayaraman, V. 2006. "Production Planning for Closed-loop Supply Chains with Product Recovery and Reuse: An Analytical Approach." International Journal of Production Research 44 (5): 981-998.
-
(2006)
International Journal of Production Research
, vol.44
, Issue.5
, pp. 981-998
-
-
Jayaraman, V.1
-
18
-
-
33750738038
-
Linear programming with fuzzy parameters: An interactive method resolution
-
Jiménez, M., M. Arenas, A. Bilbao, and M. V. Rodriguez. 2007. "Linear Programming with Fuzzy Parameters: An Interactive Method Resolution." European Journal of Operational Research 177 (3): 1599-1609.
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 1599-1609
-
-
Jiménez, M.1
Arenas, M.2
Bilbao, A.3
Rodriguez, M.V.4
-
19
-
-
80052108238
-
Development of an interpretive structural model of barriers to reverse logistics implementation in indian industry
-
edited by J. Hesselbach and C. Herrmann, Berlin: Springer
-
Jindal, A., and K. S. Sangwan. 2011. "Development of an Interpretive Structural Model of Barriers to Reverse Logistics Implementation in Indian Industry." In Glocalized Solutions for Sustainability in Manufacturing, edited by J. Hesselbach and C. Herrmann, 448-453. Berlin: Springer.
-
(2011)
Glocalized Solutions for Sustainability in Manufacturing
, pp. 448-453
-
-
Jindal, A.1
Sangwan, K.S.2
-
22
-
-
33749987986
-
Supply planning model for remanufacturing system in reverse logistics environment
-
Kim, K., I. Song, J. Kim, and B. Jeong. 2006. "Supply Planning Model for Remanufacturing System in Reverse Logistics Environment." Computers and Industrial Engineering 51 (2): 279-287.
-
(2006)
Computers and Industrial Engineering
, vol.51
, Issue.2
, pp. 279-287
-
-
Kim, K.1
Song, I.2
Kim, J.3
Jeong, B.4
-
23
-
-
77951270636
-
Economic and environmental assessment of automotive remanufacturing: Alternator case study
-
48517
-
Kim, H.-J., V. Raichur, and S. J. Skerlos. 2008. "Economic and Environmental Assessment of Automotive Remanufacturing: Alternator Case Study." ASME Conference Proceedings 2008 (48517): 33-40.
-
(2008)
ASME Conference Proceedings
, vol.2008
, pp. 33-40
-
-
Kim, H.-J.1
Raichur, V.2
Skerlos, S.J.3
-
24
-
-
0026898945
-
A new approach to some possibilistic linear programming problems
-
Lai, Y. J., and C. L. Hwang. 1992. "A New Approach to Some Possibilistic Linear Programming Problems." Fuzzy Sets and Systems 49 (2): 121-133.
-
(1992)
Fuzzy Sets and Systems
, vol.49
, Issue.2
, pp. 121-133
-
-
Lai, Y.J.1
Hwang, C.L.2
-
25
-
-
60549093200
-
Network model and optimization of reverse logistics by hybrid genetic algorithm
-
Lee, J.-E., M. Gen, and K.-G. Rhee. 2009. "Network Model and Optimization of Reverse Logistics by Hybrid Genetic Algorithm." Computers & Industrial Engineering 56 (3): 951-964.
-
(2009)
Computers & Industrial Engineering
, vol.56
, Issue.3
, pp. 951-964
-
-
Lee, J.-E.1
Gen, M.2
Rhee, K.-G.3
-
27
-
-
33645784856
-
Distribution planning decisions using interactive fuzzy multi-objective linear programming
-
Liang, T.-F. 2006. "Distribution Planning Decisions Using Interactive Fuzzy Multi-objective Linear Programming." Fuzzy Sets and Systems 157 (10): 1303-1316.
-
(2006)
Fuzzy Sets and Systems
, vol.157
, Issue.10
, pp. 1303-1316
-
-
Liang, T.-F.1
-
28
-
-
50249122486
-
Fuzzy multi-objective production/distribution planning decisions with multi-product and multi-time period in a supply chain
-
Liang, T.-F. 2008. "Fuzzy Multi-objective Production/Distribution Planning Decisions with Multi-product and Multi-time Period in a Supply Chain." Computers and Industrial Engineering 55 (3): 676-694.
-
(2008)
Computers and Industrial Engineering
, vol.55
, Issue.3
, pp. 676-694
-
-
Liang, T.-F.1
-
29
-
-
56349085911
-
Application of fuzzy sets to manufacturing/distribution planning decisions with multi-product and multi-time period in supply chains
-
Liang, T.-F., and H.-W. Cheng. 2009. "Application of Fuzzy Sets to Manufacturing/Distribution Planning Decisions with Multi-product and Multi-time Period in Supply Chains." Expert Systems with Applications 36 (2, Part 2): 3367-3377.
-
(2009)
Expert Systems with Applications
, vol.36
, Issue.2 PART 2
, pp. 3367-3377
-
-
Liang, T.-F.1
Cheng, H.-W.2
-
30
-
-
84858698509
-
Inventory management in a two-echelon closed-loop supply chain with correlated demands and returns
-
Mitra, S. 2012. "Inventory Management in a Two-echelon Closed-loop Supply Chain with Correlated Demands and Returns." Computers & Industrial Engineering 62 (4): 870-879.
-
(2012)
Computers & Industrial Engineering
, vol.62
, Issue.4
, pp. 870-879
-
-
Mitra, S.1
-
31
-
-
27344448554
-
MRP with flexible constraints: A fuzzy mathematical programming approach
-
Mula, J., R. Poler, and J. P. Garcia. 2006. "MRP with Flexible Constraints: A Fuzzy Mathematical Programming Approach." Fuzzy Sets and Systems 157 (1): 74-97.
-
(2006)
Fuzzy Sets and Systems
, vol.157
, Issue.1
, pp. 74-97
-
-
Mula, J.1
Poler, R.2
Garcia, J.P.3
-
32
-
-
77957773775
-
The effectiveness of a fuzzy mathematical programming approach for supply chain production planning with fuzzy demand
-
Mula, J., D. Peidro, and R. Poler. 2010. "The Effectiveness of a Fuzzy Mathematical Programming Approach for Supply Chain Production Planning with Fuzzy Demand." International Journal of Production Economics 128 (1): 136-143.
-
(2010)
International Journal of Production Economics
, vol.128
, Issue.1
, pp. 136-143
-
-
Mula, J.1
Peidro, D.2
Poler, R.3
-
33
-
-
59349116113
-
Strategic network design for reverse logistics and remanufacturing using new and old product modules
-
Mutha, A., and S. Pokharel. 2009. "Strategic Network Design for Reverse Logistics and Remanufacturing using New and Old Product Modules." Computers and Industrial Engineering 56 (1): 334-346.
-
(2009)
Computers and Industrial Engineering
, vol.56
, Issue.1
, pp. 334-346
-
-
Mutha, A.1
Pokharel, S.2
-
34
-
-
84874646953
-
Fuzzy multi-objective linear programming approach for optimising a closed-loop supply chain network
-
Özceylan, E., and T. Paksoy. 2012a. "Fuzzy Multi-objective Linear Programming Approach for Optimising a Closed-loop Supply Chain Network." International Journal of Production Research 51 (8): 2443-2461.
-
(2012)
International Journal of Production Research
, vol.51
, Issue.8
, pp. 2443-2461
-
-
Özceylan, E.1
Paksoy, T.2
-
35
-
-
84871191449
-
A mixed integer programming model for a closed-loop supply-chain network
-
Özceylan, E., and T. Paksoy. 2012b. "A Mixed Integer Programming Model for a Closed-loop Supply-chain Network." International Journal of Production Research 51 (3): 718-734.
-
(2012)
International Journal of Production Research
, vol.51
, Issue.3
, pp. 718-734
-
-
Özceylan, E.1
Paksoy, T.2
-
36
-
-
67651068254
-
Fuzzy optimization for supply chain planning under supply, demand and process uncertainties
-
Peidro, D., J. Mula, R. Poler, and J.-L.Verdegay. 2009. "Fuzzy Optimization for Supply Chain Planning Under Supply, Demand and Process Uncertainties." Fuzzy Sets and Systems 160 (18): 2640-2657.
-
(2009)
Fuzzy Sets and Systems
, vol.160
, Issue.18
, pp. 2640-2657
-
-
Peidro, D.1
Mula, J.2
Poler, R.3
Verdegay, J.-L.4
-
37
-
-
84859808210
-
Environmental supply chain network design using multi-objective fuzzy mathematical programming
-
Pishvaee, M. S., and J. Razmi. 2012. "Environmental Supply Chain Network Design Using Multi-objective Fuzzy Mathematical Programming." Applied Mathematical Modelling 36 (8): 3433-3446.
-
(2012)
Applied Mathematical Modelling
, vol.36
, Issue.8
, pp. 3433-3446
-
-
Pishvaee, M.S.1
Razmi, J.2
-
38
-
-
77955681026
-
A possibilistic programming approach for closed-loop supply chain network design under uncertainty
-
Pishvaee, M. S., and S. A. Torabi. 2010. "A Possibilistic Programming Approach for Closed-loop Supply Chain Network Design Under Uncertainty." Fuzzy Sets and Systems 161 (20): 2668-2683.
-
(2010)
Fuzzy Sets and Systems
, vol.161
, Issue.20
, pp. 2668-2683
-
-
Pishvaee, M.S.1
Torabi, S.A.2
-
41
-
-
1942500445
-
Optimization under uncertainty: State-of-The-art and opportunities
-
Sahinidis, N. V. 2004. "Optimization Under Uncertainty: State-of-the-art and Opportunities." Computers & Chemical Engineering 28 (6-7): 971-983.
-
(2004)
Computers & Chemical Engineering
, vol.28
, Issue.6-7
, pp. 971-983
-
-
Sahinidis, N.V.1
-
42
-
-
84887086320
-
An integrated fuzzy multi-criteria evaluation of lithium-ion battery recycling processes
-
Sangwan, K. S., and A. Jindal, 2012. "An Integrated Fuzzy Multi-criteria Evaluation of Lithium-ion Battery Recycling Processes." International Journal of Sustainable Engineering 6 (4): 359-371.
-
(2012)
International Journal of Sustainable Engineering
, vol.6
, Issue.4
, pp. 359-371
-
-
Sangwan, K.S.1
Jindal, A.2
-
43
-
-
72149087223
-
Issues in reverse supply chains, part i: End of life product recovery and inventory management - An overview
-
Sasikumar, P., and G. Kannan. 2008. "Issues in Reverse Supply Chains, Part I: End of Life Product Recovery and Inventory Management - An Overview." International Journal of Sustainable Engineering 1 (3): 154-172.
-
(2008)
International Journal of Sustainable Engineering
, vol.1
, Issue.3
, pp. 154-172
-
-
Sasikumar, P.1
Kannan, G.2
-
44
-
-
77957311584
-
Optimal production planning for a multi-product closed loop system with uncertain demand and return
-
Shi, J., G. Zhang, and J. Sha. 2011. "Optimal Production Planning for a Multi-product Closed Loop System with Uncertain Demand and Return." Computers & Operations Research 38 (3): 641-650.
-
(2011)
Computers & Operations Research
, vol.38
, Issue.3
, pp. 641-650
-
-
Shi, J.1
Zhang, G.2
Sha, J.3
-
45
-
-
84968082184
-
Strategic issues in product recovery management
-
Thierry, M. C., M. Salomon, J. A. E. E. v. Nunen, and L. N. v. Wassenhove. 1995. "Strategic Issues in Product Recovery Management." California Management Review 37 (2): 114-135.
-
(1995)
California Management Review
, vol.37
, Issue.2
, pp. 114-135
-
-
Thierry, M.C.1
Salomon, M.2
Nunen, J.A.E.E.V.3
Wassenhove, L.N.V.4
-
46
-
-
84874666771
-
A two-stage robust programming approach to demand-driven disassembly planning for a closed-loop supply chain system
-
Wang, H.-F., and Y.-S. Huang. 2012. "A Two-stage Robust Programming Approach to Demand-driven Disassembly Planning for a Closed-loop Supply Chain System." International Journal of Production Research 51 (8): 2414-2432.
-
(2012)
International Journal of Production Research
, vol.51
, Issue.8
, pp. 2414-2432
-
-
Wang, H.-F.1
Huang, Y.-S.2
-
48
-
-
0026417899
-
Fuzzy programming with nonlinear membership functions: Piecewise linear approximation
-
Yang, T., J. P. Ignizio, and H.-J. Kim. 1991. "Fuzzy Programming with Nonlinear Membership Functions: Piecewise Linear Approximation." Fuzzy Sets and Systems 41 (1): 39-53.
-
(1991)
Fuzzy Sets and Systems
, vol.41
, Issue.1
, pp. 39-53
-
-
Yang, T.1
Ignizio, J.P.2
Kim, H.-J.3
-
49
-
-
0016459349
-
The concept of a linguistic variable and its application to approximate reasoning - I
-
Zadeh, L. A. 1975. "The Concept of a Linguistic Variable and Its Application to Approximate Reasoning - I." Information Sciences 8 (3): 199-249.
-
(1975)
Information Sciences
, vol.8
, Issue.3
, pp. 199-249
-
-
Zadeh, L.A.1
|