Volumn 36, Issue , 2014, Pages 350-361

A study of recent changes in southwest power pool and electric reliability council of Texas and its impact on the U.S. wind industry

Author keywords

ERCOT; FERC; NERC; SPP; Wind farm developers; Wind turbine manufacturers

Indexed keywords

ELECTRIC UTILITIES; FREQUENCY RESPONSE; MANUFACTURE; TELLURIUM COMPOUNDS; WIND POWER;

EID: 84901259186     PISSN: 13640321     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.rser.2014.04.074     Document Type: Review
Times cited : (8)

References (28)
  • 1
    • 84901272165 scopus 로고    scopus 로고
    • FERC. [accessed 23.07.13]
    • FERC. What FERC does. http://www.ferc.gov/about/ferc-does.asp [accessed 23.07.13].
    • What FERC does
  • 2
    • 84901289863 scopus 로고    scopus 로고
    • NERC. [accessed 23.07.13]
    • NERC. About NERC. http://www.nerc.com/AboutNERC/Pages/default.aspx [accessed 23.07.13].
    • About NERC
  • 3
    • 84901259312 scopus 로고    scopus 로고
    • [accessed 23.07.13]
    • Intro to SPP. http://www.spp.org/publications/Intro-to-SPP.pdf [accessed 23.07.13].
    • Intro to SPP
  • 4
    • 84901277086 scopus 로고    scopus 로고
    • March 2014
    • ERCOT quick facts: at a glance. http://www.ercot.com/content/news/ presentations/2014/ERCOT-Quick-Facts-032814.pdf; March 2014.
    • ERCOT Quick Facts: At A Glance
  • 8
    • 84901258302 scopus 로고    scopus 로고
    • NERC standards Committee. [accessed 23.07.13]
    • NERC standards Committee. PRC-025-1 - Generator relay loadability. http://www.nerc.com/docs/standards/sar/PRC-025-1-clean-100512.pdf [accessed 23.07.13].
    • PRC-025-1 - Generator relay loadability
  • 12
    • 84901253920 scopus 로고    scopus 로고
    • AGCTF-draft- principles-02-08-12. [accessed 23.07.13]
    • AGCTF 2/24/12 Draft Meeting Minutes & Principles. AGCTF-draft- principles-02-08-12. http://www.spp.org/section.asp?group=1864&pageID=27 [accessed 23.07.13].
    • AGCTF 2/24/12 Draft Meeting Minutes & Principles
  • 13
    • 84901268815 scopus 로고    scopus 로고
    • AGCTF-whitepaper-draft-208 16a-dlreed. [accessed 23.07.13]
    • AGCTF 8/17/11 Meeting Materials. AGCTF-whitepaper-draft-208 16a-dlreed. http://www.spp.org/section.asp?group=1864&pageID=27 [accessed 23.07.13].
    • AGCTF 8/17/11 Meeting Materials
  • 14
    • 84901255503 scopus 로고    scopus 로고
    • [accessed 23.07.13]
    • Southwest Power Pool Criteria. http://www.spp.org/publications/ SPP%20Criteria%20and%20Appendices%20January%202012.pdf [accessed 23.07.13].
    • Southwest Power Pool Criteria
  • 15
    • 84870621899 scopus 로고    scopus 로고
    • [accessed 31.03.14]
    • ERCOT quick facts. http://www.ercot.com/content/news/presentations/2014/ ERCOT-Quick-Facts-February%205%202014.pdf [accessed 31.03.14].
    • ERCOT Quick Facts
  • 16
    • 84901281965 scopus 로고    scopus 로고
    • Monthly Status Report November 2013. [accessed 31.03.14]
    • System Planning ERCOT. Monthly Status Report November 2013. http://www.ercot.com/content/news/presentations/2013/System-Planning-Report- Nov%202013.pdf [accessed 31.03.14].
    • System Planning ERCOT
  • 17
    • 84867946520 scopus 로고    scopus 로고
    • Sub-synchronous grid conditions: New event, new problem, and new solution
    • Spokane, Washington, USA; October 2012
    • Lawrence C Gross. Sub-synchronous grid conditions: new event, new problem, and new solution. Presented at the 37th annual western protective relay conference. Spokane, Washington, USA; October 2012.
    • 37th Annual Western Protective Relay Conference
    • Gross, L.C.1
  • 18
    • 84901253704 scopus 로고    scopus 로고
    • ABB/ERCOT, Austin, TX, USA, Tech. Rep. E3800-PR-02. ERCOT CREZ reactive power compensation study; December 03, 2010
    • ABB/ERCOT, Austin, TX, USA, Tech. Rep. E3800-PR-02. ERCOT CREZ reactive power compensation study; December 03, 2010
  • 19
    • 84901815364 scopus 로고    scopus 로고
    • Sub-synchronous problems & prevention in ERCOT
    • Austin, TX; September 16, 2012
    • Adams John. Sub-synchronous problems & prevention in ERCOT. Presented at ERCOT reliability & protection group meeting. Austin, TX; September 16, 2012.
    • ERCOT Reliability & Protection Group Meeting
    • John, A.1
  • 20
    • 84877806465 scopus 로고    scopus 로고
    • Frequency instability problems in North American interconnections
    • Pittsburgh, PA: National Energy Technology Lab; May 1
    • Maria A Hanley. Frequency instability problems in North American interconnections. Tech. Rep. DOE/NETL-2011/1473. Pittsburgh, PA: National Energy Technology Lab; May 1, 2011.
    • (2011) Tech. Rep. DOE/NETL-2011/1473
    • Hanley, M.A.1
  • 21
    • 84901285676 scopus 로고    scopus 로고
    • Dynamic simulation studies of the frequency response of the three U.S. Interconnections with increased wind generation
    • Berkeley (CA, USA): Ernest Orlando Lawrence Berkeley National Lab; December 2010
    • Mackin Peter, et al. Dynamic simulation studies of the frequency response of the three U.S. interconnections with increased wind generation. Tech. Rep. LBNL-4146E. Berkeley (CA, USA): Ernest Orlando Lawrence Berkeley National Lab; December 2010.
    • Tech. Rep. LBNL-4146E
    • Peter, M.1
  • 23
    • 84901247920 scopus 로고    scopus 로고
    • [accessed 23.07.13]
    • Clarification of reactive power requirement. http://www.ercot.com/ content/mktrules/issues/nprr/451-475/452/keydocs/452NPRR-08-Board-Report-071712. doc [accessed 23.07.13].
    • Clarification of Reactive Power Requirement
  • 24
    • 84901270561 scopus 로고    scopus 로고
    • [accessed 23.07.13]
    • Dynamics working group procedure manual. http://www.ercot.com/content/ committees/board/tac/ros/dwg/keydocs/2012/DWG-Procedure-Manual-Revision6.doc [accessed 23.07.13].
    • Dynamics Working Group Procedure Manual
  • 25
    • 84901273480 scopus 로고    scopus 로고
    • ERCOT ROS System Protection Working Group (SPWG) procedure. [accessed 23.07.13]
    • ERCOT ROS System Protection Working Group (SPWG) procedure. http://www.ercot.com/content/committees/board/tac/ros/spwg/keydocs/2013/ SPWG-Procedures-ROS-Approved-041212.doc [accessed 23.07.13].
  • 26
    • 84901267095 scopus 로고    scopus 로고
    • [accessed 23.07.13]
    • Wind Forecasting changed to P50, synchronization with PRR841. http://www.ercot.com/content/mktrules/issues/nprr/201-225/210/keydocs/ 210NPRR-01-Wind-Forecasting-Change-to-P50,-Synchronization-w.doc [accessed 23.07.13].
    • Wind Forecasting Changed to P50, Synchronization with PRR841
  • 27
    • 84901260762 scopus 로고    scopus 로고
    • Electric Reliability Council of Texas, Office of Public Utility Counsel (OPUC). [accessed 23.07.13]
    • Electric Reliability Council of Texas, Office of Public Utility Counsel (OPUC). http://www.opuc.texas.gov/ERCOT.html#ISO [accessed 23.07.13].
  • 28
    • 84890854508 scopus 로고    scopus 로고
    • Review on engineering and regulatory aspects associated with frequency control capabilities of wind power plants
    • 21-23 May 2013
    • Singarao VY, Rao V, Harral MA. Review on engineering and regulatory aspects associated with frequency control capabilities of wind power plants. In: Proceedings of the IEEE Energytech conference; 21-23 May 2013. p. 1-6.
    • Proceedings of the IEEE Energytech Conference , pp. 1-6
    • Singarao, V.Y.1    Rao, V.2    Harral, M.A.3