Volumn 140, Issue 2, 2014, Pages

Optimization model for design-operation of pumped-storage and hydropower systems

Author keywords

Hydropower; Optimization; Pumped storage; Simultaneous design operation

Indexed keywords

DECISION MAKING; DESIGN; MATHEMATICAL MODELS; NONLINEAR PROGRAMMING; OPTIMIZATION; POWER PLANTS; RESERVOIRS (WATER);

EID: 84901014823     PISSN: 07339402     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)EY.1943-7897.0000169     Document Type: Article
Times cited : (74)

References (30)
  • 1
    • 78651343715 scopus 로고    scopus 로고
    • Optimizing multi-reservoir operation rules: An improved HBMO approach
    • 1464-7141
    • Afshar, A., Shafii, M., and, Bozorg Haddad, O. (2010). " Optimizing multi-reservoir operation rules: An improved HBMO approach." J. Hydroinformatics, 13 (1), 121-139. 1464-7141
    • (2010) J. Hydroinformatics , vol.13 , Issue.1 , pp. 121-139
    • Afshar, A.1    Shafii, M.2    Bozorg Haddad, O.3
  • 2
    • 34548238860 scopus 로고    scopus 로고
    • Optimal sizing of a run-of-river small hydropower plant
    • ECMADL 0196-8904
    • Anagnostopoulos, J. S., and, Papantonis, D. E. (2007 a). " Optimal sizing of a run-of-river small hydropower plant." Energy Convers. Manag., 48 (10), 2663-2670. ECMADL 0196-8904
    • (2007) Energy Convers. Manag. , vol.48 , Issue.10 , pp. 2663-2670
    • Anagnostopoulos, J.S.1    Papantonis, D.E.2
  • 3
    • 34848868103 scopus 로고    scopus 로고
    • Pumping station design for a pumped-storage wind-hydro power plant
    • ECMADL 0196-8904
    • Anagnostopoulos, J. S., and, Papantonis, D. E. (2007 b). " Pumping station design for a pumped-storage wind-hydro power plant." Energy Convers. Manag., 48 (11), 3009-3017. ECMADL 0196-8904
    • (2007) Energy Convers. Manag. , vol.48 , Issue.11 , pp. 3009-3017
    • Anagnostopoulos, J.S.1    Papantonis, D.E.2
  • 4
    • 48649084544 scopus 로고    scopus 로고
    • Optimum rehabilitation strategy of water distribution systems using the HBMO algorithm
    • Bozorg Haddad, O., Adams, B. J., and, Mariño, M. A. (2008 a). " Optimum rehabilitation strategy of water distribution systems using the HBMO algorithm." J. Water Supply: Res. Tech.-AQUA, 57 (5), 327-350.
    • (2008) J. Water Supply: Res. Tech.-AQUA , vol.57 , Issue.5 , pp. 327-350
    • Bozorg Haddad, O.1    Adams, B.J.2    Mariño, M.A.3
  • 5
    • 55549127591 scopus 로고    scopus 로고
    • Design-operation of multi-hydropower reservoirs: HBMO approach
    • WRMAEJ 0920-4741
    • Bozorg Haddad, O., Afshar, A., and, Mariño, M. A. (2008 b). " Design-operation of multi-hydropower reservoirs: HBMO approach." Water Resour. Manag., 22 (12), 1709-1722. WRMAEJ 0920-4741
    • (2008) Water Resour. Manag. , vol.22 , Issue.12 , pp. 1709-1722
    • Bozorg Haddad, O.1    Afshar, A.2    Mariño, M.A.3
  • 6
    • 47949084346 scopus 로고    scopus 로고
    • Honey-bee mating optimization (HBMO) algorithm in deriving optimal operation rules for reservoirs
    • 1464-7141
    • Bozorg Haddad, O., Afshar, A., and, Mariño, M. A. (2008 c). " Honey-bee mating optimization (HBMO) algorithm in deriving optimal operation rules for reservoirs." J. Hydroinformatics, 10 (3), 257-264. 1464-7141
    • (2008) J. Hydroinformatics , vol.10 , Issue.3 , pp. 257-264
    • Bozorg Haddad, O.1    Afshar, A.2    Mariño, M.A.3
  • 7
    • 74549151827 scopus 로고    scopus 로고
    • Optimization of non-convex water resource problems by honey-bee mating optimization (HBMO) algorithm
    • ENGCE7 0177-0667
    • Bozorg Haddad, O., Afshar, A., and, Mariño, M. A. (2009). " Optimization of non-convex water resource problems by honey-bee mating optimization (HBMO) algorithm." Eng. Comput., 26 (3), 267-280. ENGCE7 0177-0667
    • (2009) Eng. Comput. , vol.26 , Issue.3 , pp. 267-280
    • Bozorg Haddad, O.1    Afshar, A.2    Mariño, M.A.3
  • 9
    • 34447625560 scopus 로고    scopus 로고
    • Dynamic penalty function as a strategy in solving water resources combinatorial optimization problems with honey-bee optimization (HBMO) algorithm
    • 1464-7141
    • Bozorg Haddad, O., and, Mariño, M. A. (2007). " Dynamic penalty function as a strategy in solving water resources combinatorial optimization problems with honey-bee optimization (HBMO) algorithm." J. Hydroinformatics, 9 (3), 233-250. 1464-7141
    • (2007) J. Hydroinformatics , vol.9 , Issue.3 , pp. 233-250
    • Bozorg Haddad, O.1    Mariño, M.A.2
  • 11
    • 43849089097 scopus 로고    scopus 로고
    • Optimization of pumped storage capacity in an isolated power system with large renewable penetration
    • ITPSEG 0885-8950
    • Brown, P. D., Peas Lopes, J. A., and, Matos, M. A. (2008). " Optimization of pumped storage capacity in an isolated power system with large renewable penetration." IEEE Trans. Power Syst., 23 (2), 523-531. ITPSEG 0885-8950
    • (2008) IEEE Trans. Power Syst. , vol.23 , Issue.2 , pp. 523-531
    • Brown, P.D.1    Peas Lopes, J.A.2    Matos, M.A.3
  • 12
    • 40849134352 scopus 로고    scopus 로고
    • Pumped-storage scheduling using evolutionary particle swarm optimization
    • Chen, P. H. (2008). " Pumped-storage scheduling using evolutionary particle swarm optimization." IEEE Trans. Energy Convers., 23 (1), 294-301.
    • (2008) IEEE Trans. Energy Convers. , vol.23 , Issue.1 , pp. 294-301
    • Chen, P.H.1
  • 13
    • 79960107256 scopus 로고    scopus 로고
    • Effect of utility function curvature of Young's bargaining method on the design of WDNs
    • WRMAEJ 0920-4741
    • Fallah-Mehdipour, E., Bozorg Haddad, O., Beygi, S., and, Mariño, M. A. (2011). " Effect of utility function curvature of Young's bargaining method on the design of WDNs." Water Resour. Manag., 25 (9), 2197-2218. WRMAEJ 0920-4741
    • (2011) Water Resour. Manag. , vol.25 , Issue.9 , pp. 2197-2218
    • Fallah-Mehdipour, E.1    Bozorg Haddad, O.2    Beygi, S.3    Mariño, M.A.4
  • 14
    • 79952210968 scopus 로고    scopus 로고
    • Performance of a novel hybrid algorithm in the design of water networks
    • 1741-7589
    • Ghajarnia, N., Bozorg Haddad, O., and, Mariño, M. A. (2011). " Performance of a novel hybrid algorithm in the design of water networks." Proc., Inst. Civ. Eng. Water Manag., 164 (4), 173-191. 1741-7589
    • (2011) Proc., Inst. Civ. Eng. Water Manag. , vol.164 , Issue.4 , pp. 173-191
    • Ghajarnia, N.1    Bozorg Haddad, O.2    Mariño, M.A.3
  • 15
    • 0019912332 scopus 로고
    • Reliability, resiliency and vulnerability criteria for water resource system performance evaluation
    • WRERAQ 0043-1397
    • Hashimoto, T., Stedinger, J. R., and, Loucks, D. P. (1982). " Reliability, resiliency and vulnerability criteria for water resource system performance evaluation." Water Resour. Res., 18 (1), 14-20. WRERAQ 0043-1397
    • (1982) Water Resour. Res. , vol.18 , Issue.1 , pp. 14-20
    • Hashimoto, T.1    Stedinger, J.R.2    Loucks, D.P.3
  • 16
    • 0025397898 scopus 로고
    • Optimal sizing of projects in a hydro-based power system
    • Hreinsson, E. B. (1990). " Optimal sizing of projects in a hydro-based power system." IEEE Trans. Energy Convers., 5 (1), 32-38.
    • (1990) IEEE Trans. Energy Convers. , vol.5 , Issue.1 , pp. 32-38
    • Hreinsson, E.B.1
  • 17
    • 63049084185 scopus 로고    scopus 로고
    • An analysis for increasing the penetration of renewable energies by optimal sizing of pumped storage power plants
    • IEEE, Vancouver, BC
    • Khatibi, M., and, Jazaeri, M. (2008). " An analysis for increasing the penetration of renewable energies by optimal sizing of pumped storage power plants." Electric Power Conf., EPEC. IEEE Canada, IEEE, Vancouver, BC 1-5.
    • (2008) Electric Power Conf., EPEC. IEEE Canada , pp. 1-5
    • Khatibi, M.1    Jazaeri, M.2
  • 18
    • 1842686887 scopus 로고    scopus 로고
    • Optimal operation of multireservoir systems: State-of-the-art review
    • JWRMD5 0733-9496
    • Labadie, J. W. (2004). " Optimal operation of multireservoir systems: State-of-the-art review." J. Water Resour. Plann. Manag., 130 (2), 93-111. JWRMD5 0733-9496
    • (2004) J. Water Resour. Plann. Manag. , vol.130 , Issue.2 , pp. 93-111
    • Labadie, J.W.1
  • 20
    • 0021645147 scopus 로고
    • Multipurpose reservoir operation, 1, monthly model for a single reservoir
    • JHYDA7 0022-1694
    • Mariño, M. A., and, Mohammadi, B. (1984). " Multipurpose reservoir operation, 1, monthly model for a single reservoir." J. Hydrol., 69, 1-14. JHYDA7 0022-1694
    • (1984) J. Hydrol. , vol.69 , pp. 1-14
    • Mariño, M.A.1    Mohammadi, B.2
  • 21
    • 0021645152 scopus 로고
    • Multipurpose reservoir operation, 2, daily operation of a multiple reservoir system
    • JHYDA7 0022-1694
    • Mohammadi, B., and, Mariño, M. A. (1984). " Multipurpose reservoir operation, 2, daily operation of a multiple reservoir system." J. Hydrol., 69, 15-28. JHYDA7 0022-1694
    • (1984) J. Hydrol. , vol.69 , pp. 15-28
    • Mohammadi, B.1    Mariño, M.A.2
  • 22
    • 34247365083 scopus 로고    scopus 로고
    • Reservoir operation in assigning optimal multi-crop irrigation areas
    • AWMADF 0378-3774
    • Moradi-Jalal, M., Bozorg Haddad, O., Karney, B. W., and, Mariño, M. A. (2007). " Reservoir operation in assigning optimal multi-crop irrigation areas." Agr. Water Manag., 90 (1-2), 149-159. AWMADF 0378-3774
    • (2007) Agr. Water Manag. , vol.90 , Issue.12 , pp. 149-159
    • Moradi-Jalal, M.1    Bozorg Haddad, O.2    Karney, B.W.3    Mariño, M.A.4
  • 23
    • 84860897920 scopus 로고    scopus 로고
    • Optimizing irrigation water allocation and multicrop planning using discrete PSO algorithm
    • 10.1061/(ASCE)IR.1943-4774.0000426, JIDEDH 0733-9437
    • Noory, H., Liaghat, A. M., Parsinejad, M., and, Bozorg Haddad, O. (2012). " Optimizing irrigation water allocation and multicrop planning using discrete PSO algorithm." J. Irrig. Drain. Eng., 10.1061/(ASCE)IR.1943-4774. 0000426, 437-444. JIDEDH 0733-9437
    • (2012) J. Irrig. Drain. Eng. , pp. 437-444
    • Noory, H.1    Liaghat, A.M.2    Parsinejad, M.3    Bozorg Haddad, O.4
  • 25
    • 84859026598 scopus 로고    scopus 로고
    • Optimization of hydro power plant design by particle swarm optimization (PSO)
    • PERNBE 1877-7058
    • Rahi, O. P., Chandel, A. K., and, Sharma, M. G. (2012). " Optimization of hydro power plant design by particle swarm optimization (PSO)." Procedia Eng., 30, 418-425. PERNBE 1877-7058
    • (2012) Procedia Eng. , vol.30 , pp. 418-425
    • Rahi, O.P.1    Chandel, A.K.2    Sharma, M.G.3
  • 26
    • 0034099370 scopus 로고    scopus 로고
    • Optimal design of hydroelectric projects in Uttara Kannada, India
    • HSJODN 0262-6667
    • Ramachandra, T. V., Subramanian, D. K., and, Joshi, N. V. (2000). " Optimal design of hydroelectric projects in Uttara Kannada, India." Hydrol. Sci. J., 45 (2), 299-314. HSJODN 0262-6667
    • (2000) Hydrol. Sci. J. , vol.45 , Issue.2 , pp. 299-314
    • Ramachandra, T.V.1    Subramanian, D.K.2    Joshi, N.V.3
  • 28
    • 84860803648 scopus 로고    scopus 로고
    • HBMO algorithm for calibrating water distribution network of Langarud city
    • WSTED4 0273-1223
    • Sabbaghpour, S., Naghashzadehgan, M., Javaherdeh, K., and, Bozorg Haddad, O. (2012). " HBMO algorithm for calibrating water distribution network of Langarud city." Water Sci. Tech., 65 (9), 1564-1569. WSTED4 0273-1223
    • (2012) Water Sci. Tech. , vol.65 , Issue.9 , pp. 1564-1569
    • Sabbaghpour, S.1    Naghashzadehgan, M.2    Javaherdeh, K.3    Bozorg Haddad, O.4
  • 29
    • 79952777728 scopus 로고    scopus 로고
    • Techno-economical method for the capacity sizing of a small hydropower plant
    • ECMADL 0196-8904
    • Santolin, A., Cavazzini, G., Pavesi, G., Ardizzon, G., and, Rossetti, A. (2011). " Techno-economical method for the capacity sizing of a small hydropower plant." Energy Convers. Manag., 52 (7), 2533-2541. ECMADL 0196-8904
    • (2011) Energy Convers. Manag. , vol.52 , Issue.7 , pp. 2533-2541
    • Santolin, A.1    Cavazzini, G.2    Pavesi, G.3    Ardizzon, G.4    Rossetti, A.5
  • 30
    • 78650310372 scopus 로고    scopus 로고
    • Effect of breakage level one in design of water distribution networks
    • WRMAEJ 0920-4741
    • Soltanjalili, M., Bozorg Haddad, O., and, Mariño, M. A. (2010). " Effect of breakage level one in design of water distribution networks." Water Resour. Manag., 25 (1), 311-337. WRMAEJ 0920-4741
    • (2010) Water Resour. Manag. , vol.25 , Issue.1 , pp. 311-337
    • Soltanjalili, M.1    Bozorg Haddad, O.2    Mariño, M.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.