2
-
-
33749042087
-
A genetic algorithm approach for multiobjective optimization of supply chain networks
-
doi:10.1016/j.cie.2006.07.011 doi:10.1016/j.cie.2006.07.011
-
Altiparmak, F., Gen, M., Lin, L., & Paksoy, T. (2006). A genetic algorithm approach for multiobjective optimization of supply chain networks. Computers & Industrial Engineering, 51, 196-215. doi:10.1016/j.cie.2006.07.011 doi:10.1016/j.cie.2006.07.011
-
(2006)
Computers & Industrial Engineering
, vol.51
, pp. 196-215
-
-
Altiparmak, F.1
Gen, M.2
Lin, L.3
Paksoy, T.4
-
3
-
-
53549109980
-
A multi-objective stochastic programming approach for supply chain design considering risk
-
doi:10.1016/j.ijpe.2008.08.002 doi:10.1016/j.ijpe.2008.08.002
-
Azaron, A., Brown, K. N., Tarim, S. A., & Modarres, M. (2008). A multi-objective stochastic programming approach for supply chain design considering risk. International Journal of Production Economics, 116, 129-138. doi:10.1016/j.ijpe.2008.08.002 doi:10.1016/j.ijpe.2008.08.002
-
(2008)
International Journal of Production Economics
, vol.116
, pp. 129-138
-
-
Azaron, A.1
Brown, K.N.2
Tarim, S.A.3
Modarres, M.4
-
4
-
-
84985846646
-
A joint economic lot size model for purchaser and vendor
-
doi:10.1111/j.1540-5915.1986.tb00228.x doi:10.1111/j.1540-5915.1986.tb00228.x
-
Banerjee, A. (1986). A joint economic lot size model for purchaser and vendor. Decision Sciencesk, 17, 292-311. doi:10.1111/j.1540-5915.1986.tb00228.x doi:10.1111/j.1540-5915.1986.tb00228.x
-
(1986)
Decision Sciences
, vol.17
, pp. 292-311
-
-
Banerjee, A.1
-
5
-
-
34347264522
-
Optimizing inventory decisions in a multi-stage multi-customer supply chain: A note
-
doi:10.1016/j.tre.2005.09.011 doi:10.1016/j.tre.2005.09.011
-
Cárdenas-Barrón, L. E. (2007). Optimizing inventory decisions in a multi-stage multi-customer supply chain: A note. Transportation Research Part E, Logistics and Transportation Review, 43, 647-654. doi:10.1016/j.tre.2005.09.011 doi:10.1016/j.tre.2005.09.011
-
(2007)
Transportation Research Part E, Logistics and Transportation Review
, vol.43
, pp. 647-654
-
-
Cárdenas-Barrón, L.E.1
-
6
-
-
78751619592
-
The derivation of eoq/epq inventory models with two backorders costs using analytic geometry and algebra
-
doi:10.1016/j.apm.2010.11.053 doi:10.1016/j.apm.2010.11.053
-
Cárdenas-Barrón, L. E. (2011). The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra. Applied Mathematical Modelling, 35, 2394-2407. doi:10.1016/j.apm.2010.11.053 doi:10.1016/j.apm.2010.11.053
-
(2011)
Applied Mathematical Modelling
, vol.35
, pp. 2394-2407
-
-
Cárdenas-Barrón, L.E.1
-
7
-
-
1942436286
-
Multi-objective optimization of multi-echelon supply chain networks with uncertain product demands and prices
-
doi:10.1016/j.compchemeng.2003.0 9.014doi:10.1016/j.compchemeng.2003.09.014
-
Chen, C. L., & Lee, W. C. (2004). Multi-objective optimization of multi-echelon supply chain networks with uncertain product demands and prices. Computers & Chemical Engineering, 28, 1131-1144. doi:10.1016/j.compchemeng.2003.0 9.014doi:10.1016/j.compchemeng.2003.09.014
-
(2004)
Computers & Chemical Engineering
, vol.28
, pp. 1131-1144
-
-
Chen, C.L.1
Lee, W.C.2
-
8
-
-
34047225096
-
A heuristic algorithm for master planning that satisfies multiple objectives
-
doi:10.1016/j.cor.2006.02.022 doi:10.1016/j.cor.2006.02.022
-
Chern, C. C., & Hsieh, J. S. (2007). A heuristic algorithm for master planning that satisfies multiple objectives. Computers & Operations Research, 34, 3491-3513. doi:10.1016/j.cor.2006.02.022 doi:10.1016/j.cor.2006.02.022
-
(2007)
Computers & Operations Research
, vol.34
, pp. 3491-3513
-
-
Chern, C.C.1
Hsieh, J.S.2
-
10
-
-
33749121356
-
Heuristic approaches to determine base-stock levels in a serial supply chain with a single objective and with multiple objectives
-
doi:10.1016/j.ejor.2005.04.039 doi:10.1016/j.ejor.2005.04.039
-
Daniel, J. S. R., & Rajendran, C. (2005). Heuristic approaches to determine base-stock levels in a serial supply chain with a single objective and with multiple objectives. European Journal of Operational Research, 175, 566-592. doi:10.1016/j.ejor.2005.04.039 doi:10.1016/j.ejor.2005.04.039
-
(2005)
European Journal of Operational Research
, vol.175
, pp. 566-592
-
-
Daniel, J.S.R.1
Rajendran, C.2
-
11
-
-
70349533776
-
-
New Jersey, USA: Prentice-Hall
-
Fawcett, S. E., Ellram, L. M., & Ogden, J. A. (2007). Supply chain management from vision to implementation. New Jersey, USA: Prentice-Hall.
-
(2007)
Supply Chain Management from Vision to Implementation
-
-
Fawcett, S.E.1
Ellram, L.M.2
Ogden, J.A.3
-
12
-
-
0034974417
-
A new heuristic optimization algorithm: Harmony search
-
doi:10.1177/003754970107600201 doi:10.1177/003754970107600201
-
Geem, Z. W., Kim, J. H., & Loganathan, G. V. (2001). A new heuristic optimization algorithm: Harmony search. Simulation, 76, 60-68. doi:10.1177/003754970107600201 doi:10.1177/003754970107600201
-
(2001)
Simulation
, vol.76
, pp. 60-68
-
-
Geem, Z.W.1
Kim, J.H.2
Loganathan, G.V.3
-
13
-
-
0017416997
-
An integrated inventory model for a single supplier-single customer problem
-
doi:10.1080/00207547708943107 doi:10.1080/00207547708943107
-
Goyal, S. K. (1977). An integrated inventory model for a single supplier-single customer problem. International Journal of Production Research, 15, 107-111. doi:10.1080/00207547708943107 doi:10.1080/00207547708943107
-
(1977)
International Journal of Production Research
, vol.15
, pp. 107-111
-
-
Goyal, S.K.1
-
14
-
-
84985781712
-
Joint economic lot size model for purchaser and vendor: A comment
-
doi:10.1111/j.1540-5915.1988.tb00264.x doi:10.1111/j.1540-5915.1988.tb00264.x
-
Goyal, S. K. (1988). Joint economic lot size model for purchaser and vendor: A comment. Decision Sciences, 19, 236-241. doi:10.1111/j.1540-5915.1988.tb00264.x doi:10.1111/j.1540-5915.1988.tb00264.x
-
(1988)
Decision Sciences
, vol.19
, pp. 236-241
-
-
Goyal, S.K.1
-
15
-
-
0024715832
-
Integrated inventory models: The vendor-buyer coordination
-
doi:10.1016/0377-2217(89)90247-6 doi:10.1016/0377-2217(89)90247-6
-
Goyal, S. K., & Gupta, Y. P. (1989). Integrated inventory models: The vendor-buyer coordination. European Journal of Operational Research, 41, 261-269. doi:10.1016/0377-2217(89)90247-6 doi:10.1016/0377-2217(89)90247-6
-
(1989)
European Journal of Operational Research
, vol.41
, pp. 261-269
-
-
Goyal, S.K.1
Gupta, Y.P.2
-
16
-
-
0033079082
-
Some stochastic inventory models with deterministic variable lead time
-
doi:10.1016/ S0377-2217(97)00441-4 doi:10.1016/S0377-2217(97)00441-4
-
Hariga, M., & Ben-Daya, M. (1999). Some stochastic inventory models with deterministic variable lead time. European Journal of Operational Research, 113, 42-51. doi:10.1016/ S0377-2217(97)00441-4 doi:10.1016/S0377-2217(97)00441-4
-
(1999)
European Journal of Operational Research
, vol.113
, pp. 42-51
-
-
Hariga, M.1
Ben-Daya, M.2
-
17
-
-
60749125319
-
A study of lead time variation impact on supply chain performance
-
doi:10.1007/s00170-008-1428-2 doi:10.1007/s00170-008-1428-2
-
Heydari, J., Baradaran-Kazemzadeh, R., & Chaharsooghi, S. K. (2009). A study of lead time variation impact on supply chain performance. International Journal of Advanced Manufacturing Technology, 40, 1206-1215. doi:10.1007/s00170-008-1428-2 doi:10.1007/s00170-008-1428-2
-
(2009)
International Journal of Advanced Manufacturing Technology
, vol.40
, pp. 1206-1215
-
-
Heydari, J.1
Baradaran-Kazemzadeh, R.2
Chaharsooghi, S.K.3
-
18
-
-
0032632360
-
The optimal production and shipment policy for the single-vendor singlebuyer integrated production-inventory problem
-
doi:10.1080/002075499190617 doi:10.1080/002075499190617
-
Hill, R. (1999). The optimal production and shipment policy for the single-vendor singlebuyer integrated production-inventory problem. International Journal of Production Research, 37, 2463-2475. doi:10.1080/002075499190617 doi:10.1080/002075499190617
-
(1999)
International Journal of Production Research
, vol.37
, pp. 2463-2475
-
-
Hill, R.1
-
20
-
-
26644457919
-
A buyer-vendor eoq model with changeable lead time in supply chain
-
doi:10.1007/s00170-004-2063-1 doi:10.1007/s00170-004-2063-1
-
Hsiao, J. M., & Lin, C. (2005). A buyer-vendor EOQ model with changeable lead time in supply chain. International Journal of Advanced Manufacturing Technology, 26, 917-921. doi:10.1007/s00170-004-2063-1 doi:10.1007/s00170-004-2063-1
-
(2005)
International Journal of Advanced Manufacturing Technology
, vol.26
, pp. 917-921
-
-
Hsiao, J.M.1
Lin, C.2
-
21
-
-
0029535737
-
Particle swarm optimization
-
Perth, Australia
-
Kennedy, J., & Eberhart, R. (1995). Particle swarm optimization. Proceedings of the IEEE International Conference on Neural Networks, Perth, Australia, (pp. 1942-1945).
-
(1995)
Proceedings of the IEEE International Conference on Neural Networks
, pp. 1942-1945
-
-
Kennedy, J.1
Eberhart, R.2
-
23
-
-
27544435612
-
Adaptive inventory control models for supply chain management
-
doi:10.1007/s00170-004-2069-8 doi:10.1007/s00170-004-2069-8
-
Kim, C. O., Jun, J., Baek, J. K., Smith, R. L., & Kim, Y. D. (2005). Adaptive inventory control models for supply chain management. International Journal of Advanced Manufacturing Technology, 26, 1184-1192. doi:10.1007/s00170-004-2069-8 doi:10.1007/s00170-004-2069-8
-
(2005)
International Journal of Advanced Manufacturing Technology
, vol.26
, pp. 1184-1192
-
-
Kim, C.O.1
Jun, J.2
Baek, J.K.3
Smith, R.L.4
Kim, Y.D.5
-
24
-
-
26444479778
-
Optimization by simulated annealing
-
In H. Gutfreund & G. Tolouse (Eds.)
-
Kirkpatrick, S., Gelatti, C. D., & Vecchi, M. P. (1994). Optimization by simulated annealing. In H. Gutfreund & G. Tolouse (Eds.), Advanced Series in Neurosciences, Vol. 3, Biology and computation: A physicist's choice, (pp. 671-680).
-
(1994)
Advanced Series in Neurosciences, Vol. 3, Biology and Computation: A Physicist's Choice
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatti, C.D.2
Vecchi, M.P.3
-
25
-
-
0029632685
-
A one-vendor multi-buyer integrated inventory model
-
doi:10.1016/0377-2217(93)E0253-T doi:10.1016/0377-2217(93)E0253-T
-
Lu, L. (1995). A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research, 81, 312-323. doi:10.1016/0377-2217(93)E0253-T doi:10.1016/0377-2217(93)E0253-T
-
(1995)
European Journal of Operational Research
, vol.81
, pp. 312-323
-
-
Lu, L.1
-
26
-
-
34248155868
-
A probabilistic bi-level linear multi-objective programming problem to supply chain planning
-
doi:10.1016/j.amc.2006.10.032 doi:10.1016/j.amc.2006.10.032
-
Roghanian, E., Sadjadi, S. J., & Aryanezhad, M. B. (2007). A probabilistic bi-level linear multi-objective programming problem to supply chain planning. Applied Mathematics and Computation, 188, 786-800. doi:10.1016/j.amc.2006.10.032 doi:10.1016/j.amc.2006.10.032
-
(2007)
Applied Mathematics and Computation
, vol.188
, pp. 786-800
-
-
Roghanian, E.1
Sadjadi, S.J.2
Aryanezhad, M.B.3
-
27
-
-
0034288912
-
A multi-objective approach to simultaneous strategic and operational planning in supply chain design
-
doi:10.1016/S0305-0483(99)00080-8 doi:10.1016/S0305-0483(99)00080-8
-
Sabri, E. H., & Beamon, B. M. (2000). A multi-objective approach to simultaneous strategic and operational planning in supply chain design. Omega, 28, 581-598. doi:10.1016/S0305-0483(99)00080-8 doi:10.1016/S0305-0483(99)00080-8
-
(2000)
Omega
, vol.28
, pp. 581-598
-
-
Sabri, E.H.1
Beamon, B.M.2
-
28
-
-
78049401289
-
A note on fuzzy multiobjective production/distribution planning decisions with multi-product and multi-time period in a supply chain
-
doi:10.1016/j.cie.2010.07.008 doi:10.1016/j.cie.2010.07.008
-
Sakall, U. S. (2010). A note on fuzzy multiobjective production/distribution planning decisions with multi-product and multi-time period in a supply chain. Computers & Industrial Engineering, 59, 1010-1012. doi:10.1016/j.cie.2010.07.008 doi:10.1016/j.cie.2010.07.008
-
(2010)
Computers & Industrial Engineering
, vol.59
, pp. 1010-1012
-
-
Sakall, U.S.1
-
29
-
-
79960566619
-
A discrete firefly meta-heuristic with local search for makespan minimization in permutation flow shop scheduling problems
-
doi:10.5267/j.ijiec.2010.01.001 doi:10.5267/j.ijiec.2010.01.001
-
Sayadi, M. K., Ramezanian, R., & GhaffariNasab, N. (2010). A discrete firefly meta-heuristic with local search for makespan minimization in permutation flow shop scheduling problems. International Journal of Industrial Engineering Computation, 1, 1-10. doi:10.5267/j.ijiec.2010.01.001 doi:10.5267/j.ijiec.2010.01.001
-
(2010)
International Journal of Industrial Engineering Computation
, vol.1
, pp. 1-10
-
-
Sayadi, M.K.1
Ramezanian, R.2
Ghaffarinasab, N.3
-
30
-
-
31844449462
-
A single-vendor multiple-buyer inventory model with a multiple-shipment policy
-
doi:10.1007/s00170-004-2267-4 doi:10.1007/s00170-004-2267-4
-
Siajadi, H., Ibrahim, R. N., & Lochert, P. B. (2006). A single-vendor multiple-buyer inventory model with a multiple-shipment policy. International Journal of Advanced Manufacturing Technology, 27, 1030-1037. doi:10.1007/s00170-004-2267-4 doi:10.1007/s00170-004-2267-4
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.27
, pp. 1030-1037
-
-
Siajadi, H.1
Ibrahim, R.N.2
Lochert, P.B.3
-
31
-
-
0004165937
-
-
New York, NY. USA: McGraw-Hill
-
Simchi-Levi, D., Kaminsky, P., & Simchi-Levi, E. (2008). Designing and managing the supply chain concepts, strategies and case studies. New York, NY. USA: McGraw-Hill.
-
(2008)
Designing and Managing the Supply Chain Concepts, Strategies and Case Studies
-
-
Simchi-Levi, D.1
Kaminsky, P.2
Simchi-Levi, E.3
-
32
-
-
45749103167
-
An extended state task network formulation for integrated production-distribution planning in supply chain
-
doi:10.1007/s00170-007-1063-3 doi:10.1007/s00170-007-1063-3
-
Su, S., Zhan, D., & Xu, X. (2008). An extended state task network formulation for integrated production-distribution planning in supply chain. International Journal of Advanced Manufacturing Technology, 37, 1232-1249. doi:10.1007/s00170-007-1063-3 doi:10.1007/s00170-007-1063-3
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.37
, pp. 1232-1249
-
-
Su, S.1
Zhan, D.2
Xu, X.3
-
33
-
-
42149171370
-
Optimizing multiproduct multi-constraint inventory control systems with stochastic replenishment
-
doi:10.3923/jas.2008.1228.1234 doi:10.3923/jas.2008.1228.1234
-
Taleizadeh, A. A., Aryanezhad, M. B., & Niaki, S. T. A. (2008). Optimizing multiproduct multi-constraint inventory control systems with stochastic replenishment. Journal of Applied Sciences, 8, 1228-1234. doi:10.3923/jas.2008.1228.1234 doi:10.3923/jas.2008.1228.1234
-
(2008)
Journal of Applied Sciences
, vol.8
, pp. 1228-1234
-
-
Taleizadeh, A.A.1
Aryanezhad, M.B.2
Niaki, S.T.A.3
-
34
-
-
79957878491
-
Meta-heuristic algorithms to solve the fuzzy single period problem
-
doi:10.1016/j.mcm.2011.03.038 doi:10.1016/j.mcm.2011.03.038
-
Taleizadeh, A. A., Barzinpour, F., & Wee, H. M. (2011c). Meta-heuristic algorithms to solve the fuzzy single period problem. Mathematical and Computer Modelling, 54, 1273-1285. doi:10.1016/j.mcm.2011.03.038 doi:10.1016/j.mcm.2011.03.038
-
(2011)
Mathematical and Computer Modelling
, vol.54
, pp. 1273-1285
-
-
Taleizadeh, A.A.1
Barzinpour, F.2
Wee, H.M.3
-
36
-
-
59149085452
-
A hybrid method of pareto, topsis and genetic algorithm to optimize multi-product multi-constraint inventory control systems with random fuzzy replenishments
-
doi:10.1016/j.mcm.2008.10.013 doi:10.1016/j.mcm.2008.10.013
-
Taleizadeh, A. A., Niaki, S. T., & Aryanezhad, M. B. (2009a). A hybrid method of pareto, TOPSIS and genetic algorithm to optimize multi-product multi-constraint inventory control systems with random fuzzy replenishments. Mathematical and Computer Modelling, 49, 1044-1057. doi:10.1016/j.mcm.2008.10.013 doi:10.1016/j.mcm.2008.10.013
-
(2009)
Mathematical and Computer Modelling
, vol.49
, pp. 1044-1057
-
-
Taleizadeh, A.A.1
Niaki, S.T.2
Aryanezhad, M.B.3
-
37
-
-
77956509070
-
Replenish-up-to multi chanceconstraint inventory control system with stochastic period lengths and total discount under fuzzy purchasing price and holding costs
-
doi:10.1080/00207720903171761 doi:10.1080/00207720903171761
-
Taleizadeh, A. A., Niaki, S. T., & Aryanezhad, M. B. (2010b). Replenish-up-to multi chanceconstraint inventory control system with stochastic period lengths and total discount under fuzzy purchasing price and holding costs. International Journal of Systems Science, 41, 1187-1200. doi:10.1080/00207720903171761 doi:10.1080/00207720903171761
-
(2010)
International Journal of Systems Science
, vol.41
, pp. 1187-1200
-
-
Taleizadeh, A.A.1
Niaki, S.T.2
Aryanezhad, M.B.3
-
38
-
-
79957496143
-
Multi-buyer multi-vendor multi-product multi-constraint supply chain problem with stochastic demand and variable lead time
-
doi:10.1016/j.amc.2011.04.001 doi:10.1016/j.amc.2011.04.001
-
Taleizadeh, A. A., Niaki, S. T., & Barzinpour, F. (2011a). Multi-buyer multi-vendor multi-product multi-constraint supply chain problem with stochastic demand and variable lead time. Applied Mathematics and Computation, 217, 9234-9253. doi:10.1016/j.amc.2011.04.001 doi:10.1016/j.amc.2011.04.001
-
(2011)
Applied Mathematics and Computation
, vol.217
, pp. 9234-9253
-
-
Taleizadeh, A.A.1
Niaki, S.T.2
Barzinpour, F.3
-
39
-
-
70449521841
-
Optimizing multi product multi constraints bi-objective newsboy problem with discount by hybrid method of goal programming and genetic algorithm
-
doi:10.1080/03052150802582175 doi:10.1080/03052150802582175
-
Taleizadeh, A. A., Niaki, S. T., & Hosseini, V. (2009b). Optimizing multi product multi constraints bi-objective newsboy problem with discount by hybrid method of goal programming and genetic algorithm. Engineering Optimization, 41, 437-457. doi:10.1080/03052150802582175 doi:10.1080/03052150802582175
-
(2009)
Engineering Optimization
, vol.41
, pp. 437-457
-
-
Taleizadeh, A.A.1
Niaki, S.T.2
Hosseini, V.3
-
40
-
-
84855891097
-
Multiproduct multiple-buyer single-vendor supply chain problem with stochastic demand, variable lead-time, and multi-chance constraint
-
doi:10.1016/j.eswa.2011.11.001 doi:10.1016/j.eswa.2011.11.001
-
Taleizadeh, A. A., Niaki, S. T., & Makui, A. (2012). Multiproduct multiple-buyer single-vendor supply chain problem with stochastic demand, variable lead-time, and multi-chance constraint. Expert Systems with Applications, 39, 5338-5348. doi:10.1016/j.eswa.2011.11.001 doi:10.1016/j.eswa.2011.11.001
-
(2012)
Expert Systems with Applications
, vol.39
, pp. 5338-5348
-
-
Taleizadeh, A.A.1
Niaki, S.T.2
Makui, A.3
-
41
-
-
84858333685
-
Multi-product multi-chance-constraint stochastic inventory problem with dynamic demand and partial back-ordering: A harmony search algorithm
-
doi:10.1016/j.jmsy.2011.05.006
-
Taleizadeh, A. A., Niaki, S. T., & Seyed-Javadi, S. M. (2011). Multi-product multi-chance-constraint stochastic inventory problem with dynamic demand and partial back-ordering: A harmony search algorithm. Journal of Manufacturing Systems, 31(2). doi:10.1016/j.jmsy.2011.05.006
-
(2011)
Journal of Manufacturing Systems
, vol.31
, Issue.2
-
-
Taleizadeh, A.A.1
Niaki, S.T.2
Seyed-Javadi, S.M.3
-
42
-
-
78650179403
-
A particle swarm optimization approach for constraint joint single buyer single vendor inventory problem with changeable lead-time and (r,q) policy in supply chain
-
doi:10.1007/s00170-010-2689-0 doi:10.1007/s00170-010-2689-0
-
Taleizadeh, A. A., Niaki, S. T., Shafii, N., Ghavamizadeh Meibodi, R., & Jabbarzadeh, A. (2010a). A particle swarm optimization approach for constraint joint single buyer single vendor inventory problem with changeable lead-time and (r,Q) policy in supply chain. International Journal of Advanced Manufacturing Technology. International Journal of Advanced Manufacturing Technology, 51, 1209-1223. doi:10.1007/s00170-010-2689-0 doi:10.1007/s00170-010-2689-0
-
(2010)
International Journal of Advanced Manufacturing Technology. International Journal of Advanced Manufacturing Technology
, vol.51
, pp. 1209-1223
-
-
Taleizadeh, A.A.1
Niaki, S.T.2
Shafii, N.3
Ghavamizadeh Meibodi, R.4
Jabbarzadeh, A.5
-
43
-
-
34547144645
-
A mutual beneficial pricing strategy of an integrated vendor-buyers inventory system
-
doi:10.1007/s00170-006-0581-8 doi:10.1007/s00170-006-0581-8
-
Wee, H. M., & Yang, P. C. (2007). A mutual beneficial pricing strategy of an integrated vendor-buyers inventory system. International Journal of Advanced Manufacturing Technology, 34, 179-187. doi:10.1007/s00170-006-0581-8 doi:10.1007/s00170-006-0581-8
-
(2007)
International Journal of Advanced Manufacturing Technology
, vol.34
, pp. 179-187
-
-
Wee, H.M.1
Yang, P.C.2
-
44
-
-
51049113595
-
A class of fuzzy rough expected value multi-objective decision making model and its application to inventory problems
-
(Oxford, England), doi:10.1016/j.camwa.2008.03.040 doi:10.1016/j.camwa.2008.03.040
-
Xu, J., & Zhao, L. (2008). A class of fuzzy rough expected value multi-objective decision making model and its application to inventory problems. Computers & Mathematics with Applications (Oxford, England), 56, 2107-2119. doi:10.1016/j.camwa.2008.03.040 doi:10.1016/j.camwa.2008.03.040
-
(2008)
Computers & Mathematics with Applications
, vol.56
, pp. 2107-2119
-
-
Xu, J.1
Zhao, L.2
-
46
-
-
77957863557
-
Firefly algorithms for multimodal optimization
-
In O. Watanabe & T. Zeugmann (Eds.), Lecture Notes in Computer Science Berlin, Germany: Springer-Verlag. doi:10.1007/978-3-642-04944-6_14 doi:10.1007/978-3-642-04944-6_14
-
Yang, X. S. (2009). Firefly algorithms for multimodal optimization. In O. Watanabe & T. Zeugmann (Eds.), Stochastic algorithms: Foundations and applications SAGA (Vol. 5792, pp. 169-178). Lecture Notes in Computer Science Berlin, Germany: Springer-Verlag. doi:10.1007/978-3-642-04944-6_14 doi:10.1007/978-3-642-04944-6_14
-
(2009)
Stochastic Algorithms: Foundations and Applications SAGA
, vol.5792
, pp. 169-178
-
-
Yang, X.S.1
|