메뉴 건너뛰기




Volumn 29, Issue 3, 2014, Pages 1383-1392

Microgrid optimal scheduling with multi-period islanding constraints

Author keywords

Adjustable load; distributed energy resource; islanded operation; microgrid optimal scheduling

Indexed keywords

ENERGY RESOURCES; OPTIMIZATION; SCHEDULING;

EID: 84899651139     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2013.2290006     Document Type: Article
Times cited : (345)

References (30)
  • 2
    • 55549098571 scopus 로고    scopus 로고
    • Destination perfection
    • Nov./Dec.
    • A. Flueck and Z. Li, "Destination perfection," IEEE Power and EnergyMag., vol. 6, no. 6, pp. 36-47, Nov./Dec. 2008.
    • (2008) IEEE Power and EnergyMag. , vol.6 , Issue.6 , pp. 36-47
    • Flueck, A.1    Li, Z.2
  • 3
    • 84869863841 scopus 로고    scopus 로고
    • A functional microgrid for enhancingreliability, sustainability, and energy efficiency
    • Oct.
    • M. Shahidehpour and J. Clair, "A functional microgrid for enhancingreliability, sustainability, and energy efficiency," Electr. J., vol. 25, no.8, pp. 21-28, Oct. 2012.
    • (2012) Electr. J. , vol.25 , Issue.8 , pp. 21-28
    • Shahidehpour, M.1    Clair, J.2
  • 4
    • 84872085206 scopus 로고    scopus 로고
    • Reliability-constrainedoptimal sizing of energy storage system in a microgrid
    • Dec.
    • S. Bahramirad, W. Reder, and A. Khodaei, "Reliability- constrainedoptimal sizing of energy storage system in a microgrid," IEEE Trans.Smart Grid, vol. 3, no. 4, pp. 2056-2062, Dec. 2012.
    • (2012) IEEE Trans.Smart Grid , vol.3 , Issue.4 , pp. 2056-2062
    • Bahramirad, S.1    Reder, W.2    Khodaei, A.3
  • 5
    • 34547475943 scopus 로고    scopus 로고
    • Microgrids:An overview of ongoing research, development and demonstrationprojects
    • July/Aug.
    • N. Hatziargyriou, H. Asano, M. R. Iravani, and C. Marnay, "Microgrids:An overview of ongoing research, development and demonstrationprojects," IEEE Power and Energy Mag., vol. 5, no. 4, pp. 78-94,July/Aug. 2007.
    • (2007) IEEE Power and Energy Mag. , vol.5 , Issue.4 , pp. 78-94
    • Hatziargyriou, N.1    Asano, H.2    Iravani, M.R.3    Marnay, C.4
  • 7
    • 49249134136 scopus 로고    scopus 로고
    • Reliability evaluation of customers in a microgrid
    • Aug.
    • I. Bae and J. Kim, "Reliability evaluation of customers in a microgrid,"IEEE Trans. Power Syst., vol. 23, no. 3, pp. 1416-1422, Aug. 2008.
    • (2008) IEEE Trans. Power Syst. , vol.23 , Issue.3 , pp. 1416-1422
    • Bae, I.1    Kim, J.2
  • 8
    • 74949119765 scopus 로고    scopus 로고
    • Reliability of islanded microgrids withstochastic generation and prioritized load
    • Bucharest, Romania Jun.
    • S. Kennedy and M. Marden, "Reliability of islanded microgrids withstochastic generation and prioritized load," in Proc. IEEE Powertech,Bucharest, Romania, Jun. 2009.
    • (2009) Proc. IEEE Powertech
    • Kennedy, S.1    Marden, M.2
  • 9
    • 33847632958 scopus 로고    scopus 로고
    • Power management strategies for a microgrid with multiple distributed generation units
    • DOI 10.1109/TPWRS.2006.879260
    • F. Katiraei and M. R. Iravani, "Power management strategies for a microgridwith multiple distributed generation units," IEEE Trans. PowerSyst., vol. 21, no. 4, pp. 1821-1831, Nov. 2006. (Pubitemid 46357783)
    • (2006) IEEE Transactions on Power Systems , vol.21 , Issue.4 , pp. 1821-1831
    • Katiraei, F.1    Iravani, M.R.2
  • 11
    • 40849141192 scopus 로고    scopus 로고
    • Centralized control for optimizingmicrogrids
    • Mar.
    • A. G. Tsikalakis and N. D. Hatziargyriou, "Centralized control for optimizingmicrogrids," IEEE Trans. Energy Convers., vol. 23, no. 1, pp.241-248, Mar. 2008.
    • (2008) IEEE Trans. Energy Convers. , vol.23 , Issue.1 , pp. 241-248
    • Tsikalakis, A.G.1    Hatziargyriou, N.D.2
  • 13
    • 84886431403 scopus 로고    scopus 로고
    • Microgrid-based co-optimizationof generation and transmission planning in power systems
    • May
    • A. Khodaei and M. Shahidehpour, "Microgrid-based co-optimizationof generation and transmission planning in power systems," IEEETrans. Power Syst., vol. 28, no. 2, pp. 1582-1590, May 2013.
    • (2013) IEEETrans. Power Syst. , vol.28 , Issue.2 , pp. 1582-1590
    • Khodaei, A.1    Shahidehpour, M.2
  • 16
    • 40849141192 scopus 로고    scopus 로고
    • Centralized control for optimizingmicrogrids operation
    • Mar.
    • A. G. Tsikalakis and N. D. Hatziargyriou, "Centralized control for optimizingmicrogrids operation," IEEE Trans. Energy Convers., vol. 23,no. 1, pp. 241-248, Mar. 2008.
    • (2008) IEEE Trans. Energy Convers. , vol.23 , Issue.1 , pp. 241-248
    • Tsikalakis, A.G.1    Hatziargyriou, N.D.2
  • 18
    • 33947392092 scopus 로고    scopus 로고
    • Operation planning of hydrogen storage connected to wind power operating in a power market
    • DOI 10.1109/TEC.2006.878245
    • M. Korpas and A. T. Holen, "Operation planning of hydrogen storageconnected to wind power operating in a power market," IEEE Trans.Energy Convers., vol. 21, no. 3, pp. 742-749, Sep. 2006. (Pubitemid 46445163)
    • (2006) IEEE Transactions on Energy Conversion , vol.21 , Issue.3 , pp. 742-749
    • Korpas, M.1    Holen, A.T.2
  • 19
    • 57949103361 scopus 로고    scopus 로고
    • PV-microgrid operational costminimization by neural forecasting and heuristic optimization
    • Oct.
    • S. Chakraborty and M. G. Simoes, "PV-microgrid operational costminimization by neural forecasting and heuristic optimization," inProc. IEEE Ind. App. Soc. Annual Meeting, Oct. 2008.
    • (2008) Proc. IEEE Ind. App. Soc. Annual Meeting
    • Chakraborty, S.1    Simoes, M.G.2
  • 25
    • 84899650053 scopus 로고    scopus 로고
    • Economic scheduling of distributed generatorsin a microgrid considering various constraints
    • Jul.
    • A. Seon-Ju and M. Seung-Il, "Economic scheduling of distributed generatorsin a microgrid considering various constraints," in Proc. IEEEPower Energy Society General Meeting, Jul. 2009.
    • (2009) Proc. IEEEPower Energy Society General Meeting
    • Seon-Ju, A.1    Seung-Il, M.2
  • 26
  • 27
    • 84867994326 scopus 로고    scopus 로고
    • Determination of storage required to meetreliability guarantees on island-capable microgrids with intermittentsources
    • Nov.
    • J. Mitra and M. R. Vallem, "Determination of storage required to meetreliability guarantees on island-capable microgrids with intermittentsources," IEEE Trans. Power Syst., vol. 27, no. 4, pp. 2360-2367, Nov.2012.
    • (2012) IEEE Trans. Power Syst. , vol.27 , Issue.4 , pp. 2360-2367
    • Mitra, J.1    Vallem, M.R.2
  • 30
    • 84860863444 scopus 로고    scopus 로고
    • ILOG CPLEX [Online]. Available
    • ILOG CPLEX, ILOG CPLEX Homepage, 2009. [Online]. Available:http://www. ilog.com.
    • (2009) ILOG CPLEX Homepage


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.