메뉴 건너뛰기




Volumn , Issue , 2013, Pages 562-567

Monitoring a grid connected PV power generation system with labview

Author keywords

data acquisition; grid connected PV system; real time monitoring

Indexed keywords

DATA ACQUISITION; PATIENT MONITORING; PHOTOVOLTAIC CELLS;

EID: 84899114042     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICRERA.2013.6749819     Document Type: Conference Paper
Times cited : (39)

References (15)
  • 1
    • 33747006710 scopus 로고    scopus 로고
    • Photovoltaic electricity production of a gridconnected urban house in serbia
    • M. Bojic, M. Blagojevic, "Photovoltaic electricity production of a gridconnected urban house in Serbia", Energy Policy, 34 (17): 2941-8, 2006.
    • (2006) Energy Policy , vol.34 , Issue.17 , pp. 2941-2948
    • Bojic, M.1    Blagojevic, M.2
  • 2
    • 33746481699 scopus 로고    scopus 로고
    • Design of grid connected pV systems considering electrical, economical and environmental aspects apractical case
    • A. Fernandez-Infantes, J. Contreras, JL. Bernal-Agustin, "Design of grid connected PV systems considering electrical, economical and environmental aspects: apractical case", Renewable Energy, 31(13):2042-62, 2006
    • (2006) Renewable Energy , vol.31 , Issue.13 , pp. 2042-2062
    • Fernandez-Infantes, A.1    Contreras, J.2    Bernal-Agustin, J.L.3
  • 3
    • 0033882468 scopus 로고    scopus 로고
    • Characterisation of photovoltaic generators
    • W. Durisch, D. Tille, A. Worz, W. Plapp, "Characterisation of photovoltaic generators", Applied Energy, 65(1-4):273-84, 2000.
    • (2000) Applied Energy , vol.65 , Issue.1-4 , pp. 273-284
    • Durisch, W.1    Tille, D.2    Worz, A.3    Plapp, W.4
  • 4
    • 10844246299 scopus 로고    scopus 로고
    • Analysis of the operational performance and efficiency characteristic for photovoltaic system in hong kong
    • D.H.W. Li, G.H.W. Cheung, JC. Lam, "Analysis of the operational performance and efficiency characteristic for photovoltaic system in Hong Kong", Energy Conversion Management,;46(7,8):1107-18, 2005.
    • (2005) Energy Conversion Management , vol.46 , Issue.7-8 , pp. 1107-1118
    • Li, D.H.W.1    Cheung, G.H.W.2    Lam, J.C.3
  • 5
    • 33749013284 scopus 로고    scopus 로고
    • Kubie j life cycle assessment of a mediumsized photovoltaic facility at a high latitude location
    • T. Muneer, S. Younes, N. Lambert, "Kubie J. Life cycle assessment of a mediumsized photovoltaic facility at a high latitude location", Proc Inst Mech Eng Part A: Journal of Power Energy, 220(A6):517-24, 2006.
    • (2006) Proc Inst Mech Eng Part A: Journal of Power Energy , vol.220 , Issue.6 , pp. 517-524
    • Muneer, T.1    Younes, S.2    Lambert, N.3
  • 6
    • 0032004136 scopus 로고    scopus 로고
    • Photovoltaic electricity prospects in oman
    • H.A. Al-Ismaily, D. Probert, "Photovoltaic electricity prospects in Oman", Applied Energy, 59 (2-3):97-124. 1998.
    • (1998) Applied Energy , vol.59 , Issue.2-3 , pp. 97-124
    • Al-Ismaily, H.A.1    Probert, D.2
  • 7
    • 0035070069 scopus 로고    scopus 로고
    • Use of tRNSYS for modeling and simulation of a hybrid pv thermal solar system for cyprus
    • S. A. Kalogirou, "Use of TRNSYS for modeling and simulation of a hybrid pv thermal solar system for Cyprus", Renewable Energy, 23(2):247-60, 2001.
    • (2001) Renewable Energy , vol.23 , Issue.2 , pp. 247-260
    • Kalogirou, S.A.1
  • 8
    • 0142043478 scopus 로고    scopus 로고
    • Long term ambient temperature analysis and energy use implications in hong kong
    • J. C. Lam, C. L. Tsang, D.H.W. Li, "Long term ambient temperature analysis and energy use implications in Hong Kong", Energy Conversion Management, 45(3):315-27, 2004.
    • (2004) Energy Conversion Management , vol.45 , Issue.3 , pp. 315-327
    • Lam, J.C.1    Tsang, C.L.2    Li, D.H.W.3
  • 9
    • 0036612352 scopus 로고    scopus 로고
    • Efficiency characteristic of building integrated photovoltaics as a shading device
    • S. H. Yoo, E. T. Lee, "Efficiency characteristic of building integrated photovoltaics as a shading device", Buildings and Environment, 37(6):615-23, 2002.
    • (2002) Buildings and Environment , vol.37 , Issue.6 , pp. 615-623
    • Yoo, S.H.1    Lee, E.T.2
  • 10
    • 58949090479 scopus 로고    scopus 로고
    • Analytical expression for electrical efficiency of pV/T hybrid air collector
    • S. Dubey, G.S. Sandhu, G. N. Tiwari, "Analytical expression for electrical efficiency of PV/T hybrid air collector", Applied Energy, 86(5):697-705, 2009.
    • (2009) Applied Energy , vol.86 , Issue.5 , pp. 697-705
    • Dubey, S.1    Sandhu, G.S.2    Tiwari, G.N.3
  • 12
    • 33749013284 scopus 로고    scopus 로고
    • Life cycle assessment of a medium sized photovoltaic facility at a high latitude location
    • T. Muneer, S. Younes, N. Lambert, J. Kubie, "Life cycle assessment of a medium sized photovoltaic facility at a high latitude location". Proc Inst Mech Eng Part A: J Power Energy, 220(A6):517-24, 2006.
    • (2006) Proc Inst Mech Eng Part A: J Power Energy , vol.220 , Issue.6 , pp. 517-524
    • Muneer, T.1    Younes, S.2    Lambert, N.3    Kubie, J.4
  • 13
    • 61749091059 scopus 로고    scopus 로고
    • Optimising the economic viability of grid connected photovoltaic systems
    • J. D. Mondol, Y. G. Yohanis, B. Norton, "Optimising the economic viability of grid connected photovoltaic systems", Applied Energy, 86(7-8):985-99, 2009.
    • (2009) Applied Energy , vol.86 , Issue.7-8 , pp. 985-999
    • Mondol, J.D.1    Yohanis, Y.G.2    Norton, B.3
  • 14
    • 33746947893 scopus 로고    scopus 로고
    • Embodied energy analysis of photovoltaic(PV) system based on macro-and micro-level
    • I. Nawaz, G. N. Tiwari, "Embodied energy analysis of photovoltaic (PV) system based on macro-and micro-level", Energy Policy, 34(17):3144-52, 2006.
    • (2006) Energy Policy , vol.34 , Issue.17 , pp. 3144-3152
    • Nawaz, I.1    Tiwari, G.N.2
  • 15
    • 77955657699 scopus 로고    scopus 로고
    • Environmental payback time analysis of a roofmounted building integrated photovoltaic system in hong kong
    • L. Lu, H. X.Yang, "Environmental payback time analysis of a roofmounted building integrated photovoltaic system in Hong Kong", Applied Energy, 87(12):3625-31, 2010.
    • (2010) Applied Energy , vol.87 , Issue.12 , pp. 3625-3631
    • Lu, L.1    Yang, H.X.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.