1
-
-
84899078851
-
Delivering on the promise: PRA, real decisions, and real events
-
Helsinki, Finland
-
A. Mosleh, "Delivering on the Promise: PRA, Real Decisions, and Real Events", in 11th International Probabilistic Safety Assessment and Management Conference (PSAM), Helsinki, Finland (2012).
-
(2012)
11th International Probabilistic Safety Assessment and Management Conference (PSAM)
-
-
Mosleh, A.1
-
2
-
-
62749099275
-
Risk analyses and protection strategies for the operation of nuclear power plants
-
Chapter 2 in Alkan Z. et al., Springer
-
W. Kroger, "Risk analyses and protection strategies for the operation of nuclear power plants", Chapter 2 in Alkan Z. et al., Landolt-Bornstein: numerical data and functional relationships in science and technology - new series, advanced materials and technologies, Nuclear Energy, pp. 186-235: Springer (2005).
-
(2005)
Landolt-bornstein: Numerical Data and Functional Relationships in Science and Technology - New Series, Advanced Materials and Technologies, Nuclear Energy
, pp. 186-235
-
-
Kroger, W.1
-
4
-
-
84867346473
-
Development and application of level 2 probabilistic safety assessment for nuclear power plants
-
IAEA
-
IAEA, "Development and application of level 2 probabilistic safety assessment for nuclear power plants", IAEA safety standards no. SSG-4, Specific Safety Guide (2010).
-
(2010)
IAEA Safety Standards No. SSG-4, Specific Safety Guide
-
-
-
5
-
-
84867346473
-
Development and application of level 1 probabilistic safety assessment for nuclear power plants
-
IAEA
-
IAEA, "Development and application of level 1 probabilistic safety assessment for nuclear power plants", IAEA safety standards no. SSG-3, Specific Safety Guide (2010).
-
(2010)
IAEA Safety Standards No. SSG-3, Specific Safety Guide
-
-
-
6
-
-
84899045522
-
Procedures for conducting probabilistic safety assessments of nuclear power plants (level 3), offsite consequences and estimation of risks to the public
-
IAEA
-
IAEA, "Procedures for conducting probabilistic safety assessments of nuclear power plants (level 3), offsite consequences and estimation of risks to the public", safety Series No 50-P-12 (1996).
-
(1996)
Safety Series
, Issue.50
, pp. 12
-
-
-
7
-
-
84899083470
-
Lessons learned from Fukushima PSAM community
-
Tokyo, Japan
-
S. Kondo, "Lessons learned from Fukushima PSAM Community", in 2012 PS AM Topical Conference, Tokyo, Japan (2012).
-
(2012)
2012 PS AM Topical Conference
-
-
Kondo, S.1
-
8
-
-
84899050754
-
Estimating the cost of nuclear accidents
-
Tokyo, Japan
-
P. Momal, "Estimating the cost of nuclear accidents", in 2012 PSAM Topical Conference, Tokyo, Japan (2012).
-
(2012)
2012 PSAM Topical Conference
-
-
Momal, P.1
-
9
-
-
54049127894
-
-
K. B. Misra, ed., Springer London
-
P. Hokstad, and M. Rausand, "Common Cause Failure Modeling: Status and Trends Handbook of Performability Engineering", K. B. Misra, ed., pp. 621-640: Springer London (2008).
-
(2008)
Common Cause Failure Modeling: Status and Trends Handbook of Performability Engineering
, pp. 621-640
-
-
Hokstad, P.1
Rausand, M.2
-
10
-
-
84899050028
-
Eine Untersuchung zu dem durch Störfälle in Kernkraftwerken verursachten Risiko
-
Gesellschaft für Reaktorsicherheit GRS, Deutsche Risikostudie Kernkraftwerke, Verlag TÜV, Rheinland
-
Gesellschaft für Reaktorsicherheit (GRS), Deutsche Risikostudie Kernkraftwerke, "Eine Untersuchung zu dem durch Störfälle in Kernkraftwerken verursachten Risiko", Eine Studie der Gesellschaft für Reaktorsicherheit, Verlag TÜV, Rheinland (1979).
-
(1979)
Eine Studie der Gesellschaft für Reaktorsicherheit
-
-
-
14
-
-
0003539707
-
Severe accident risks: An assessment for five US nuclear power plants, final summary report
-
U. S. Nuclear Regulatory Commission
-
U. S. Nuclear Regulatory Commission, "Severe Accident Risks: An Assessment for Five US Nuclear Power Plants, Final Summary Report", NUREG-1150, Vols, vol. 1 (1990).
-
(1990)
NUREG-1150, Vols
, vol.1
-
-
-
15
-
-
84899046030
-
Final report on technical data, costs and life cycle inventories of nuclear power plants
-
C. Lecointe, D. Lecarpentier, V. Maupu, D. Le Boulch, and R. Richard, "Final report on technical data, costs and life cycle inventories of nuclear power plants", NEEDS deliverable D (2007).
-
(2007)
NEEDS Deliverable D
-
-
Lecointe, C.1
Lecarpentier, D.2
Maupu, V.3
Le Boulch, D.4
Richard, R.5
-
18
-
-
84899067205
-
The accident analysis for unit 1-3 at Fukushima Dai-ichi nuclear power station
-
San Diego, USA
-
Y. Yamanaka, "The accident analysis for unit 1-3 at Fukushima Dai-ichi nuclear power station", in 2012 ANS Winrter Meeting, San Diego, USA (2012).
-
(2012)
2012 ANS Winrter Meeting
-
-
Yamanaka, Y.1
-
19
-
-
40949148536
-
The costs of failure: A preliminary assessment of major energy accidents, 1907-2007
-
B. K. Sovacool, "The costs of failure: A preliminary assessment of major energy accidents, 1907-2007", Energy Policy, vol. 36, no. 5, pp. 1802-1820 (2008).
-
(2008)
Energy Policy
, vol.36
, Issue.5
, pp. 1802-1820
-
-
Sovacool, B.K.1
-
20
-
-
37249053831
-
Light water reactor (LWR) safety
-
B. Sehgal, "Light water reactor (LWR) safety", Nuclear Engineering and Technology, vol. 38, no. 8, pp. 697-732 (2006).
-
(2006)
Nuclear Engineering and Technology
, vol.38
, Issue.8
, pp. 697-732
-
-
Sehgal, B.1
-
21
-
-
79953134226
-
Current designs address safety problems in Fukushima reactors
-
D. Clery, "Current designs address safety problems in Fukushima reactors", Science, vol. 331, no. 6024, pp. 1506-1506 (2011).
-
(2011)
Science
, vol.331
, Issue.6024
, pp. 1506-1506
-
-
Clery, D.1
|