-
1
-
-
84873103424
-
-
Electric Power Research Institute and U. S. Nuclear Regulatory Commission, NUREG-1921/EPRI 1023001, July
-
Electric Power Research Institute and U. S. Nuclear Regulatory Commission, EPRI/NRC-RES Fire Human Reliability Analysis Guidelines - Final Report, NUREG-1921/EPRI 1023001, July 2012.
-
(2012)
EPRI/NRC-RES Fire Human Reliability Analysis Guidelines - Final Report
-
-
-
2
-
-
84899128395
-
L3PRA: "Updating NRC's level 3 PRA insights and capabilities"
-
Vienna, Austria, July 2-6, NRC Agencywide Documents Access and Management System - ADAMS - Accession Number: ML12173A092.
-
A. Kuritzky, N. Siu, K. Coyne, D. Hudson, and M. Stutzke, L3PRA: "Updating NRC's Level 3 PRA Insights and Capabilities", Proceedings of IAEA Technical Meeting on Level 3 Probabilistic Safety Assessment, Vienna, Austria, July 2-6, 2012. (Available through the NRC Agencywide Documents Access and Management System - ADAMS - Accession Number: ML12173A092.)
-
(2012)
Proceedings of IAEA Technical Meeting on Level 3 Probabilistic Safety Assessment
-
-
Kuritzky, A.1
Siu, N.2
Coyne, K.3
Hudson, D.4
Stutzke, M.5
-
3
-
-
84861678806
-
-
U. S. Nuclear Regulatory Commission, SRM M061020, November 8, Washington, D. C
-
U. S. Nuclear Regulatory Commission, Staff Requirements Memorandum - Meeting with Advisory Committee on Reactor Safeguards, SRM M061020, November 8, 2006, Washington, D. C.
-
(2006)
Staff Requirements Memorandum - Meeting with Advisory Committee on Reactor Safeguards
-
-
-
7
-
-
77951574683
-
-
U. S. Nuclear Regulatory Commission, NUREG-1880, June
-
U. S. Nuclear Regulatory Commission, ATHEANA User's Guide, NUREG-1880, June 2007.
-
(2007)
ATHEANA User's Guide
-
-
-
9
-
-
33845534780
-
-
U. S. Nuclear Regulatory Commission and Electric Power Research Institute, NUREG/CR-6850/EPRI 1011989, September
-
U. S. Nuclear Regulatory Commission and Electric Power Research Institute, EPRI/NRC-RES Fire PRA Methodology for Nuclear Power Facilities, NUREG/CR-6850/EPRI 1011989, September 2005.
-
(2005)
EPRI/NRC-RES Fire PRA Methodology for Nuclear Power Facilities
-
-
-
11
-
-
84899074683
-
The narora fire and its continuing consequences: Backfitting the indian phwrs
-
February 24-26, London, UK
-
nd International Conference, February 24-26, 1997, London, UK.
-
(1997)
nd International Conference
-
-
Bohra, S.A.1
-
13
-
-
84899111873
-
-
NUREG/CR-7017, February
-
J. Brewer, P. Amico, S. Cooper, and S. Hendrickson, Preliminary, Qualitative Human Reliability Analysis for Spent Fuel Handling, NUREG/CR-7017, February 2012.
-
(2012)
Preliminary, Qualitative Human Reliability Analysis for Spent Fuel Handling
-
-
Brewer, J.1
Amico, P.2
Cooper, S.3
Hendrickson, S.4
-
14
-
-
84899049752
-
-
NUREG/CR-7016, February
-
J. Brewer, S. Hendrickson, S. Cooper, and R. Boring, Human Reliability Analysis-Informed Insights on Cask Drops, NUREG/CR-7016, February 2012.
-
(2012)
Human Reliability Analysis-informed Insights on Cask Drops
-
-
Brewer, J.1
Hendrickson, S.2
Cooper, S.3
Boring, R.4
-
15
-
-
70449914269
-
Modeling post-core damage operator actions in the PRA
-
Knoxville, TN, September 7-11
-
R. Lutz and M. Lucci, "Modeling Post-Core Damage Operator Actions in the PRA", Proceeding of ANS PSA 2008 Topical Meeting - Challenges to PSA During the Nuclear Renaissance, Knoxville, TN, September 7-11, 2008.
-
(2008)
Proceeding of ANS PSA 2008 Topical Meeting - Challenges to PSA During the Nuclear Renaissance
-
-
Lutz, R.1
Lucci, M.2
-
21
-
-
84929620064
-
PSA technology challenges revealed by the great East Japan earthquake
-
Tokyo, Japan, April 15-17
-
N. Siu, D. Marksberry, S. Cooper, K. Coyne, and M. Stutzke, "PSA Technology Challenges Revealed by the Great East Japan Earthquake", Proceedings for the PSAM Topical Conference in Light of the Fukushima Dai-Ichi Accident, Tokyo, Japan, April 15-17, 2013.
-
(2013)
Proceedings for the PSAM Topical Conference in Light of the Fukushima Dai-ichi Accident
-
-
Siu, N.1
Marksberry, D.2
Cooper, S.3
Coyne, K.4
Stutzke, M.5
-
24
-
-
80052003159
-
-
EPRI TR-101711, December
-
D. J. Wakefield, G. W. Parry, G. W. Hannaman, and A. J. Spurgin, SHARP1 - A Revised Systematic Human Action Reliability Procedure, EPRI TR-101711, December 1992.
-
(1992)
SHARP1 - A Revised Systematic Human Action Reliability Procedure
-
-
Wakefield, D.J.1
Parry, G.W.2
Hannaman, G.W.3
Spurgin, A.J.4
-
25
-
-
67649531004
-
-
ASME/ANS RA-Sa-2009, Addenda to ASME/ANS RA-S-2008, The American Society of Mechanical Engineers, New York, NY, February
-
ASME/ANS RA-Sa-2009, Addenda to ASME/ANS RA-S-2008, Standard for Level I/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications, The American Society of Mechanical Engineers, New York, NY, February 2009.
-
(2009)
Standard for Level I/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications
-
-
|