메뉴 건너뛰기




Volumn 59, Issue , 2014, Pages 108-120

Closed-loop supply chain network design under a fuzzy environment

Author keywords

Closed loop supply chain; Fuzzy mathematical programming; Ranking fuzzy numbers; Six Sigma quality; Transportation channel

Indexed keywords

DECISION MAKING; FUZZY SETS; PROCESS ENGINEERING; PRODUCT DESIGN; SUPPLY CHAIN MANAGEMENT;

EID: 84897663659     PISSN: 09507051     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.knosys.2014.01.016     Document Type: Article
Times cited : (110)

References (40)
  • 1
    • 44649141842 scopus 로고    scopus 로고
    • Locating collection centers for incentive-dependent returns under a pick-up policy with capacitated vehicles
    • N. Aras, D. Aksen, and A. Gönül Tanuǧur Locating collection centers for incentive-dependent returns under a pick-up policy with capacitated vehicles Eur. J. Oper. Res. 191 2008 1223 1240
    • (2008) Eur. J. Oper. Res. , vol.191 , pp. 1223-1240
    • Aras, N.1    Aksen, D.2    Gönül Tanuçur, A.3
  • 2
    • 50249113678 scopus 로고    scopus 로고
    • A review and classification of fuzzy mathematical programs
    • A. Baykasoǧlu, and T. Göçken A review and classification of fuzzy mathematical programs J. Intell. Fuzzy Syst. 19 2008 205 229
    • (2008) J. Intell. Fuzzy Syst. , vol.19 , pp. 205-229
    • Baykasoǧlu, A.1    Göçken, T.2
  • 4
    • 0346057254 scopus 로고    scopus 로고
    • Using ranking functions in multiobjective fuzzy linear programming
    • J.M. Cadenas, and J.L. Verdegay Using ranking functions in multiobjective fuzzy linear programming Fuzzy Sets Syst. 111 2000 47 53
    • (2000) Fuzzy Sets Syst. , vol.111 , pp. 47-53
    • Cadenas, J.M.1    Verdegay, J.L.2
  • 6
    • 0037410423 scopus 로고    scopus 로고
    • Fuzzy scheduling: Modelling flexible constraints vs. Coping with incomplete knowledge
    • D. Dubois, H. Fargier, and P. Fortemps Fuzzy scheduling: modelling flexible constraints vs. coping with incomplete knowledge Eur. J. Oper. Res. 147 2003 231 252
    • (2003) Eur. J. Oper. Res. , vol.147 , pp. 231-252
    • Dubois, D.1    Fargier, H.2    Fortemps, P.3
  • 8
    • 77949486920 scopus 로고    scopus 로고
    • A stochastic model for forward-reverse logistics network design under risk
    • M. El-Sayed, N. Afia, and A. El-Kharbotly A stochastic model for forward-reverse logistics network design under risk Comput. Ind. Eng. 58 2010 423 431
    • (2010) Comput. Ind. Eng. , vol.58 , pp. 423-431
    • El-Sayed, M.1    Afia, N.2    El-Kharbotly, A.3
  • 9
    • 84897662801 scopus 로고    scopus 로고
    • An interactive possibilistic programming approach for a multi-objective closed-loop supply chain network under uncertainty
    • A. Fallah-Tafti, R. Sahraeian, R. Tavakkoli-Moghaddam, and M. Moeinipour An interactive possibilistic programming approach for a multi-objective closed-loop supply chain network under uncertainty Int. J. Syst. Sci. 2012
    • (2012) Int. J. Syst. Sci.
    • Fallah-Tafti, A.1    Sahraeian, R.2    Tavakkoli-Moghaddam, R.3    Moeinipour, M.4
  • 11
    • 77956064611 scopus 로고    scopus 로고
    • Multi-objective stochastic supply chain modeling to evaluate tradeoffs between profit and quality
    • R.B. Franca, E.C. Jones, C.N. Richards, and J.P. Carlson Multi-objective stochastic supply chain modeling to evaluate tradeoffs between profit and quality Int. J. Prod. Econ. 127 2010 292 299
    • (2010) Int. J. Prod. Econ. , vol.127 , pp. 292-299
    • Franca, R.B.1    Jones, E.C.2    Richards, C.N.3    Carlson, J.P.4
  • 12
    • 0001862777 scopus 로고    scopus 로고
    • Possibilistic linear programming: A brief review of fuzzy mathematical programming and a comparison with stochastic programming in portfolio selection problem
    • M. Inuiguchi, and J. Ramík Possibilistic linear programming: a brief review of fuzzy mathematical programming and a comparison with stochastic programming in portfolio selection problem Fuzzy Sets Syst. 111 2000 3 28
    • (2000) Fuzzy Sets Syst. , vol.111 , pp. 3-28
    • Inuiguchi, M.1    Ramík, J.2
  • 13
    • 33746964924 scopus 로고    scopus 로고
    • A genetic algorithm-based heuristic for the dynamic integrated forward/reverse logistics network for 3PLs
    • H.J. Ko, and G.W. Evans A genetic algorithm-based heuristic for the dynamic integrated forward/reverse logistics network for 3PLs Comput. Oper. Res. 34 2007 346 366
    • (2007) Comput. Oper. Res. , vol.34 , pp. 346-366
    • Ko, H.J.1    Evans, G.W.2
  • 14
    • 0027559242 scopus 로고
    • Possibilistic linear programming for managing interest rate risk
    • Y.J. Lai, and C.L. Hwang Possibilistic linear programming for managing interest rate risk Fuzzy Sets Syst. 54 1993 135 146
    • (1993) Fuzzy Sets Syst. , vol.54 , pp. 135-146
    • Lai, Y.J.1    Hwang, C.L.2
  • 15
    • 57349084714 scopus 로고    scopus 로고
    • Dynamic network design for reverse logistics operations under uncertainty
    • D.H. Lee, and M. Dong Dynamic network design for reverse logistics operations under uncertainty Trans. Res. Part E: Logis. Trans. Rev. 45 2009 61 71
    • (2009) Trans. Res. Part E: Logis. Trans. Rev. , vol.45 , pp. 61-71
    • Lee, D.H.1    Dong, M.2
  • 16
    • 33645784856 scopus 로고    scopus 로고
    • Distribution planning decisions using interactive fuzzy multi-objective linear programming
    • T.-F. Liang Distribution planning decisions using interactive fuzzy multi-objective linear programming Fuzzy Sets Syst. 157 2006 1303 1316
    • (2006) Fuzzy Sets Syst. , vol.157 , pp. 1303-1316
    • Liang, T.-F.1
  • 17
    • 84861645971 scopus 로고    scopus 로고
    • Online shop location optimization using a fuzzy multi-criteria decision model - Case study on Taobao.com
    • Z. Lu, S. Wang, X. Li, L. Yang, D. Yang, and D. Wu Online shop location optimization using a fuzzy multi-criteria decision model - case study on Taobao.com Knowl.-Based Syst. 32 2012 76 83
    • (2012) Knowl.-Based Syst. , vol.32 , pp. 76-83
    • Lu, Z.1    Wang, S.2    Li, X.3    Yang, L.4    Yang, D.5    Wu, D.6
  • 18
    • 58149242603 scopus 로고    scopus 로고
    • Facility location and supply chain management - A review
    • M.T. Melo, S. Nickel, and F. Saldanha-da-Gama Facility location and supply chain management - a review Eur. J. Oper. Res. 196 2009 401 412
    • (2009) Eur. J. Oper. Res. , vol.196 , pp. 401-412
    • Melo, M.T.1    Nickel, S.2    Saldanha-Da-Gama, F.3
  • 19
    • 41549118958 scopus 로고    scopus 로고
    • The dynamic design of a reverse logistics network from the perspective of third-party logistics service providers
    • H. Min, and H.J. Ko The dynamic design of a reverse logistics network from the perspective of third-party logistics service providers Int. J. Prod. Econ. 113 2008 176 192
    • (2008) Int. J. Prod. Econ. , vol.113 , pp. 176-192
    • Min, H.1    Ko, H.J.2
  • 21
    • 71749118341 scopus 로고    scopus 로고
    • A memetic algorithm for bi-objective integrated forward/reverse logistics network design
    • M.S. Pishvaee, R.Z. Farahani, and W. Dullaert A memetic algorithm for bi-objective integrated forward/reverse logistics network design Comput. Oper. Res. 37 2010 1100 1112
    • (2010) Comput. Oper. Res. , vol.37 , pp. 1100-1112
    • Pishvaee, M.S.1    Farahani, R.Z.2    Dullaert, W.3
  • 22
    • 77955681026 scopus 로고    scopus 로고
    • A possibilistic programming approach for closed-loop supply chain network design under uncertainty
    • M.S. Pishvaee, and S.A. Torabi A possibilistic programming approach for closed-loop supply chain network design under uncertainty Fuzzy Sets Syst. 161 2010 2668 2683
    • (2010) Fuzzy Sets Syst. , vol.161 , pp. 2668-2683
    • Pishvaee, M.S.1    Torabi, S.A.2
  • 23
    • 59649125008 scopus 로고    scopus 로고
    • Perspectives in reverse logistics: A review
    • S. Pokharel, and A. Mutha Perspectives in reverse logistics: a review Resour. Conserv. Recycl. 53 2009 175 182
    • (2009) Resour. Conserv. Recycl. , vol.53 , pp. 175-182
    • Pokharel, S.1    Mutha, A.2
  • 24
    • 84886366320 scopus 로고    scopus 로고
    • A new multi-objective stochastic model for a forward/reverse logistic network design with responsiveness and quality level
    • M. Ramezani, M. Bashiri, and R. Tavakkoli-Moghaddam A new multi-objective stochastic model for a forward/reverse logistic network design with responsiveness and quality level Appl. Math. Model. 2012
    • (2012) Appl. Math. Model.
    • Ramezani, M.1    Bashiri, M.2    Tavakkoli-Moghaddam, R.3
  • 26
    • 33846028582 scopus 로고    scopus 로고
    • An optimization model for the design of a capacitated multi-product reverse logistics network with uncertainty
    • M.I.G. Salema, A.P. Barbosa-Povoa, and A.Q. Novais An optimization model for the design of a capacitated multi-product reverse logistics network with uncertainty Eur. J. Oper. Res. 179 2007 1063 1077
    • (2007) Eur. J. Oper. Res. , vol.179 , pp. 1063-1077
    • Salema, M.I.G.1    Barbosa-Povoa, A.P.2    Novais, A.Q.3
  • 27
    • 84897609315 scopus 로고    scopus 로고
    • Joint single vendor-single buyer supply chain problem with stochastic demand and fuzzy lead-time
    • A.A. Taleizadeh, S.T.A. Niaki, H.-M. Wee, Joint single vendor-single buyer supply chain problem with stochastic demand and fuzzy lead-time. Knowl.-Based Syst.
    • Knowl.-Based Syst.
    • Taleizadeh, A.A.1    Niaki, S.T.A.2    Wee, H.-M.3
  • 28
    • 35649000310 scopus 로고    scopus 로고
    • An interactive possibilistic programming approach for multiple objective supply chain master planning
    • S.A. Torabi, and E. Hassini An interactive possibilistic programming approach for multiple objective supply chain master planning Fuzzy Sets Syst. 159 2008 193 214
    • (2008) Fuzzy Sets Syst. , vol.159 , pp. 193-214
    • Torabi, S.A.1    Hassini, E.2
  • 29
    • 85043327943 scopus 로고    scopus 로고
    • Multicriteria analysis of green supply chain management using interval-valued fuzzy TODIM
    • M.L. Tseng, K. Tan, R.J. Lin, and Y. Geng Multicriteria analysis of green supply chain management using interval-valued fuzzy TODIM Knowl.-Based Syst. 2012
    • (2012) Knowl.-Based Syst.
    • Tseng, M.L.1    Tan, K.2    Lin, R.J.3    Geng, Y.4
  • 30
    • 36549014721 scopus 로고    scopus 로고
    • Benders decomposition with alternative multiple cuts for a multi-product closed-loop supply chain network design model
    • H. Üster, G. Easwaran, E. Akçali, and S. Çetinkaya Benders decomposition with alternative multiple cuts for a multi-product closed-loop supply chain network design model Naval Res. Logis. 54 2007 890 907
    • (2007) Naval Res. Logis. , vol.54 , pp. 890-907
    • Üster, H.1    Easwaran, G.2    Akçali, E.3    Çetinkaya, S.4
  • 31
    • 84879080579 scopus 로고    scopus 로고
    • Model and algorithm for fuzzy joint replenishment and delivery scheduling without explicit membership function
    • L. Wang, C.-X. Dun, C.-G. Lee, Q.-L. Fu, and Y.-R. Zeng Model and algorithm for fuzzy joint replenishment and delivery scheduling without explicit membership function Int. J. Adv. Manuf. Technol. 66 2013 1907 1920
    • (2013) Int. J. Adv. Manuf. Technol. , vol.66 , pp. 1907-1920
    • Wang, L.1    Dun, C.-X.2    Lee, C.-G.3    Fu, Q.-L.4    Zeng, Y.-R.5
  • 32
    • 84871922439 scopus 로고    scopus 로고
    • Model and algorithm of fuzzy joint replenishment problem under credibility measure on fuzzy goal
    • L. Wang, Q.-L. Fu, C.-G. Lee, and Y.-R. Zeng Model and algorithm of fuzzy joint replenishment problem under credibility measure on fuzzy goal Knowl.-Based Syst. 39 2013 57 66
    • (2013) Knowl.-Based Syst. , vol.39 , pp. 57-66
    • Wang, L.1    Fu, Q.-L.2    Lee, C.-G.3    Zeng, Y.-R.4
  • 33
    • 26444454462 scopus 로고    scopus 로고
    • Applying possibilistic linear programming to aggregate production planning
    • R.C. Wang, and T.F. Liang Applying possibilistic linear programming to aggregate production planning Int. J. Prod. Econ. 98 2005 328 341
    • (2005) Int. J. Prod. Econ. , vol.98 , pp. 328-341
    • Wang, R.C.1    Liang, T.F.2
  • 34
    • 33344454664 scopus 로고    scopus 로고
    • A new approximate algorithm for solving multiple objective linear programming problems with fuzzy parameters
    • F. Wu, J. Lu, and G. Zhang A new approximate algorithm for solving multiple objective linear programming problems with fuzzy parameters Appl. Math. Comput. 174 2006 524 544
    • (2006) Appl. Math. Comput. , vol.174 , pp. 524-544
    • Wu, F.1    Lu, J.2    Zhang, G.3
  • 36
    • 0000903516 scopus 로고    scopus 로고
    • Ranking fuzzy numbers based on decomposition principle and signed distance
    • J.S. Yao, and K. Wu Ranking fuzzy numbers based on decomposition principle and signed distance Fuzzy Sets Syst. 116 2000 275 288
    • (2000) Fuzzy Sets Syst. , vol.116 , pp. 275-288
    • Yao, J.S.1    Wu, K.2
  • 37
    • 34248666540 scopus 로고
    • Fuzzy sets
    • L.A. Zadeh Fuzzy sets Inf. Control 8 1965 338 353
    • (1965) Inf. Control , vol.8 , pp. 338-353
    • Zadeh, L.A.1
  • 38
    • 67349180195 scopus 로고    scopus 로고
    • A linguistic intelligent user guide for method selection in multi-objective decision support systems
    • G. Zhang, and J. Lu A linguistic intelligent user guide for method selection in multi-objective decision support systems Inf. Sci. 179 2009 2299 2308
    • (2009) Inf. Sci. , vol.179 , pp. 2299-2308
    • Zhang, G.1    Lu, J.2
  • 39
    • 34248145961 scopus 로고    scopus 로고
    • Decentralized multi-objective bilevel decision making with fuzzy demands
    • G. Zhang, J. Lu, and T. Dillon Decentralized multi-objective bilevel decision making with fuzzy demands Knowl.-Based Syst. 20 2007 495 507
    • (2007) Knowl.-Based Syst. , vol.20 , pp. 495-507
    • Zhang, G.1    Lu, J.2    Dillon, T.3
  • 40
    • 49349136235 scopus 로고
    • Fuzzy programming and linear programming with several objective functions
    • H.J. Zimmermann Fuzzy programming and linear programming with several objective functions Fuzzy Sets Syst. 1 1978 45 55
    • (1978) Fuzzy Sets Syst. , vol.1 , pp. 45-55
    • Zimmermann, H.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.