-
2
-
-
84555196693
-
Enhancing grid measurements: Wide area measurement systems, NASPINET, and security
-
Jan.-Feb.
-
R. B. Bobbo, J. Dagle, E. Heine, H. Khurana, W. H. Sanders, P. Sauer, and T. Yardley, "Enhancing grid measurements: Wide area measurement systems, NASPINET, and security," IEEE Power Energy Mag., vol. 10, no. 1, pp. 67-73, Jan.-Feb. 2012.
-
(2012)
IEEE Power Energy Mag.
, vol.10
, Issue.1
, pp. 67-73
-
-
Bobbo, R.B.1
Dagle, J.2
Heine, E.3
Khurana, H.4
Sanders, W.H.5
Sauer, P.6
Yardley, T.7
-
3
-
-
84881433811
-
-
Tempe AZ USA Jan. Power Systems Engineering Research Center, Tech. Rep
-
M. Rice and G. T. Heydt, Phasor Measurement Unit Data in Power System State Estimation, Arizona State Univ., Tempe, AZ, USA, Jan. 2005, Power Systems Engineering Research Center, Tech. Rep.
-
(2005)
Phasor Measurement Unit Data in Power System State Estimation Arizona State Univ.
-
-
Rice, M.1
Heydt, G.T.2
-
4
-
-
84880080574
-
-
IEEE Std. Revision of IEEE Std. 1344-1995, Piscataway, NJ, USA
-
IEEE Standard for Synchrophasors for Power Systems, IEEE Std. C37. 118-2005, 2005, Revision of IEEE Std. 1344-1995, Piscataway, NJ, USA.
-
(2005)
IEEE Standard for Synchrophasors for Power Systems
, vol.C37
, pp. 118-2005
-
-
-
5
-
-
34248549055
-
A distributed state estimator utilizing synchronized phasor measurements
-
DOI 10.1109/TPWRS.2007.894859
-
W. Jiang, V. Vittal, and G. T. Heydt, "A distributed state estimator utilizing synchronized phasor measurements," IEEE Trans. Power Syst., vol. 22, no. 2, pp. 563-571, May 2007. (Pubitemid 46746217)
-
(2007)
IEEE Transactions on Power Systems
, vol.22
, Issue.2
, pp. 563-571
-
-
Jiang, W.1
Vittal, V.2
Heydt, G.T.3
-
6
-
-
33847645050
-
Placement of PMUs to enable bad data detection in state estimation
-
DOI 10.1109/TPWRS.2006.881149
-
J. Chen and A. Abur, "Placement of PMUs to enable bad data detection in state estimation," IEEE Trans. Power Syst., vol. 21, no. 4, pp. 1608-1615, Nov. 2006. (Pubitemid 46357759)
-
(2006)
IEEE Transactions on Power Systems
, vol.21
, Issue.4
, pp. 1608-1615
-
-
Chen, J.1
Abur, A.2
-
7
-
-
76649111048
-
Improvements in network parameter error identification via synchronized phasors
-
Feb.
-
J. Zhu and A. Abur, "Improvements in network parameter error identification via synchronized phasors," IEEE Trans. Power Syst., vol. 25, no. 1, pp. 44-50, Feb. 2010.
-
(2010)
IEEE Trans. Power Syst.
, vol.25
, Issue.1
, pp. 44-50
-
-
Zhu, J.1
Abur, A.2
-
8
-
-
67349274994
-
PMU measurement uncertainty considerations in WLS state estimation
-
May
-
S. Chakrabarti and E. Kyriakides, "PMU measurement uncertainty considerations in WLS state estimation," IEEE Trans. Power Syst., vol. 24, no. 2, pp. 1062-1071, May 2009.
-
(2009)
IEEE Trans. Power Syst.
, vol.24
, Issue.2
, pp. 1062-1071
-
-
Chakrabarti, S.1
Kyriakides, E.2
-
10
-
-
84860892132
-
Dynamic state prediction based on auto-regressive (AR) model using PMU data
-
Feb.
-
F. Gao, J. S. Thorp,A. Pal, and S.Gao, "Dynamic state prediction based on auto-regressive (AR) model using PMU data," in Proc. Power and Energy Conf. Illinois (PECI), Feb. 2012, pp. 1-5.
-
(2012)
Proc. Power and Energy Conf. Illinois (PECI)
, pp. 1-5
-
-
Gao, F.1
Thorp, J.S.2
Pal, A.3
Gao, S.4
-
11
-
-
51449092731
-
Synchronized phasormeasurements and their applications
-
New York, NY, USA: Springer
-
A.G.Phadke and J.S. Thorp, "Synchronized phasormeasurements and their applications," in Power Electronics and Power Systems. New York, NY, USA: Springer, 2008.
-
(2008)
Power Electronics and Power Systems
-
-
Phadke, A.G.1
Thorp, J.S.2
-
12
-
-
84886418724
-
Impact of PMU measurement buffer length on state estimation and its optimization
-
May
-
Q. Zhang, Y. Chakhchoukh, V. Vittal, G. T. Heydt, N. Logic, and S. Sturgill, "Impact of PMU measurement buffer length on state estimation and its optimization," IEEE Trans. Power Syst., vol. 28, no. 2, pp. 1657-1665, May 2013.
-
(2013)
IEEE Trans. Power Syst.
, vol.28
, Issue.2
, pp. 1657-1665
-
-
Zhang, Q.1
Chakhchoukh, Y.2
Vittal, V.3
Heydt, G.T.4
Logic, N.5
Sturgill, S.6
-
13
-
-
0023400425
-
Autoregressive filters for the identification and replacement of bad data in power system state estimation
-
Aug.
-
A. Abur, A. Keyhani, and H. Bakhtiari, "Autoregressive filters for the identification and replacement of bad data in power system state estimation," IEEE Trans. Power Syst., vol. 2, no. 3, pp. 552-558, Aug. 1987.
-
(1987)
IEEE Trans. Power Syst.
, vol.2
, Issue.3
, pp. 552-558
-
-
Abur, A.1
Keyhani, A.2
Bakhtiari, H.3
-
14
-
-
77957000700
-
Calculation of measurement correlations using point estimate
-
Oct.
-
E. Caro, J.-M. Morales, A. J. Conejo, and R. Minguez, "Calculation of measurement correlations using point estimate," IEEE Trans. Power Del., vol. 25, no. 4, pp. 2095-2103, Oct. 2010.
-
(2010)
IEEE Trans. Power Del.
, vol.25
, Issue.4
, pp. 2095-2103
-
-
Caro, E.1
Morales, J.-M.2
Conejo, A.J.3
Minguez, R.4
-
15
-
-
0003485656
-
Introduction to time series and forecasting
-
New York, NY, USA: Springer-Verlag
-
P. J. Brockwell and R. A. Davis, "Introduction To Time Series and Forecasting," in Springer Texts in Statistics, 2nd ed. New York, NY, USA: Springer-Verlag, 2002.
-
(2002)
Springer Texts in Statistics, 2nd Ed.
-
-
Brockwell, P.J.1
Davis, R.A.2
-
16
-
-
84870625244
-
The time skew problem in PMU measurements
-
Jul.
-
Q. Zhang, V. Vittal, G. Heydt, Y. Chackhchoukh, N. Logic, and S. Sturgill, "The time skew problem in PMU measurements," in Proc. IEEE Power Energy Society General Meeting, Jul. 2012, pp. 1-4.
-
(2012)
Proc. IEEE Power Energy Society General Meeting
, pp. 1-4
-
-
Zhang, Q.1
Vittal, V.2
Heydt, G.3
Chackhchoukh, Y.4
Logic, N.5
Sturgill, S.6
-
17
-
-
0003649673
-
Analysis of financial time series
-
Hoboken, NJ, USA: Wiley
-
R. S. Tsay, "Analysis of Financial Time Series," in Wiley Series in Probability and Statistics, 2nd ed. Hoboken, NJ, USA: Wiley, 2005.
-
(2005)
Wiley Series in Probability and Statistics, 2nd Ed.
-
-
Tsay, R.S.1
-
18
-
-
79960894079
-
Electric load forecasting based on statistical robust methods
-
Aug.
-
Y. Chakhchoukh, P. Panciatici, and L. Mili, "Electric load forecasting based on statistical robust methods," IEEE Trans. Power Syst., vol. 26, no. 3, pp. 982-991, Aug. 2011.
-
(2011)
IEEE Trans. Power Syst.
, vol.26
, Issue.3
, pp. 982-991
-
-
Chakhchoukh, Y.1
Panciatici, P.2
Mili, L.3
-
21
-
-
84859070373
-
Application of auto-regressive models to U.K. Wind speed data for power system impact studies
-
Jan.
-
D. C. Hill, D.McMillan, K. R.W. Bell, and D. Infield, "Application of auto-regressive models to U.K. wind speed data for power system impact studies," IEEE Trans. Sustain. Energy, vol. 3, no. 1, pp. 134-141, Jan. 2012.
-
(2012)
IEEE Trans. Sustain. Energy
, vol.3
, Issue.1
, pp. 134-141
-
-
Hill, D.C.1
McMillan, D.2
Bell, K.R.W.3
Infield, D.4
-
22
-
-
0027589817
-
Power system observability with minimal phaser measurement placement
-
DOI 10.1109/59.260810
-
T. L. Baldwin, L. Mili, M. B. Boisen, and R. Adap, "Power system observability withminimal phasormeasurement placement," IEEE Trans. Power Syst., vol. 8, no. 2, pp. 707-715, May 1993. (Pubitemid 23699295)
-
(1993)
IEEE Transactions on Power Systems
, vol.8
, Issue.2
, pp. 707-715
-
-
Balwin, T.L.1
Mili, L.2
Adapa, R.3
Boisen Jr., M.B.4
-
23
-
-
84866264694
-
Metrics for success: Performance metrics for power system state estimators and measurement designs
-
Sep.
-
M. Gol, A. Abur, and F. Galvan, "Metrics for success: Performance metrics for power system state estimators and measurement designs," IEEE Power Energy Mag., vol. 10, no. 5, pp. 50-57, Sep. 2012.
-
(2012)
IEEE Power Energy Mag.
, vol.10
, Issue.5
, pp. 50-57
-
-
Gol, M.1
Abur, A.2
Galvan, F.3
|