메뉴 건너뛰기




Volumn 43, Issue , 2014, Pages 244-255

Assessment of initial emission allowance allocation methods in the Korean electricity market

Author keywords

Auction; Benchmark; Electricity; Emission trading; Initial allocation of permits; Mixed complementarity problem; Social welfare

Indexed keywords

BENCHMARKING; COMMERCE; ELECTRIC INDUSTRY; ELECTRICITY; EMISSION CONTROL; FUELS; INVESTMENTS;

EID: 84897068848     PISSN: 01409883     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eneco.2014.03.005     Document Type: Article
Times cited : (30)

References (25)
  • 1
    • 34249334635 scopus 로고    scopus 로고
    • New entrant allocation in the Nordic energy sectors: incentives and option in the EU ETS
    • Åhman M., Holmgren K. New entrant allocation in the Nordic energy sectors: incentives and option in the EU ETS. Clim. Pol. 2006, 6:423-440.
    • (2006) Clim. Pol. , vol.6 , pp. 423-440
    • Åhman, M.1    Holmgren, K.2
  • 2
    • 33845241911 scopus 로고    scopus 로고
    • The ten-year rule: allocation of emission allowances in the EU Emissions Trading System
    • Åhman M., Burtraw D., Kruger J.A., Zetterberg L. The ten-year rule: allocation of emission allowances in the EU Emissions Trading System. Energy Policy 2007, 35:1718-1730.
    • (2007) Energy Policy , vol.35 , pp. 1718-1730
    • Åhman, M.1    Burtraw, D.2    Kruger, J.A.3    Zetterberg, L.4
  • 4
    • 0002071502 scopus 로고
    • The problem of social cost
    • Coase R.H. The problem of social cost. J. Law Econ. 1960, 3:1-44.
    • (1960) J. Law Econ. , vol.3 , pp. 1-44
    • Coase, R.H.1
  • 5
  • 6
    • 0036502655 scopus 로고    scopus 로고
    • Tradable carbon permit auctions: how and why to auction not grandfather
    • Cramton P., Kerr S. Tradable carbon permit auctions: how and why to auction not grandfather. Energy Policy 2002, 30:333-345.
    • (2002) Energy Policy , vol.30 , pp. 333-345
    • Cramton, P.1    Kerr, S.2
  • 9
    • 0000660146 scopus 로고    scopus 로고
    • Complementarity problems in GAMS and the PATH solver
    • Ferris M.C., Munson T.S. Complementarity problems in GAMS and the PATH solver. J. Econ. Dyn. Control. 2000, 24:165-188.
    • (2000) J. Econ. Dyn. Control. , vol.24 , pp. 165-188
    • Ferris, M.C.1    Munson, T.S.2
  • 11
    • 33747791399 scopus 로고    scopus 로고
    • Auctioning of EU ETS phase II allowances: how and why?
    • Hepburn C., Grubb M., Neuhoff K., Matthes F., Tse M. Auctioning of EU ETS phase II allowances: how and why?. Clim. Pol. 2006, 6:137-160.
    • (2006) Clim. Pol. , vol.6 , pp. 137-160
    • Hepburn, C.1    Grubb, M.2    Neuhoff, K.3    Matthes, F.4    Tse, M.5
  • 12
    • 84887401192 scopus 로고    scopus 로고
    • Probabilistic impact analysis of the power generation of wind farms on peak electricity demand
    • Kim S.D., Ha J.W., Park J.B. Probabilistic impact analysis of the power generation of wind farms on peak electricity demand. Korean Appl. Econ. 2007, 9:39-59.
    • (2007) Korean Appl. Econ. , vol.9 , pp. 39-59
    • Kim, S.D.1    Ha, J.W.2    Park, J.B.3
  • 15
    • 30744455795 scopus 로고    scopus 로고
    • Impacts of the European emission trading scheme directive and permits assignment methods on the Spanish electricity sector
    • Linares P., Santos F.J., Ventosa M. Impacts of the European emission trading scheme directive and permits assignment methods on the Spanish electricity sector. Energy J. 2006, 27:47-66.
    • (2006) Energy J. , vol.27 , pp. 47-66
    • Linares, P.1    Santos, F.J.2    Ventosa, M.3
  • 16
    • 44549085249 scopus 로고    scopus 로고
    • 2 emissions trading and green certificates into a power generation expansion model
    • 2 emissions trading and green certificates into a power generation expansion model. Automatica 2008, 44:1608-1620.
    • (2008) Automatica , vol.44 , pp. 1608-1620
    • Linares, P.1    Santos, F.J.2    Ventosa, M.3    Lapiedra, L.4
  • 17
    • 84897040515 scopus 로고    scopus 로고
    • The 5th basic plan of long term electricity supply and demand
    • Ministry of Knowledge Economy of Korea
    • Ministry of Knowledge Economy of Korea The 5th basic plan of long term electricity supply and demand. Public Release 2010/490 2010.
    • (2010) Public Release 2010/490
  • 18
    • 33747749122 scopus 로고    scopus 로고
    • Allocation, incentives and distortions: the impact of EU ETS emission allowance allocations to electricity sector
    • Neuhoff K., Martinez K.K., Sato M. Allocation, incentives and distortions: the impact of EU ETS emission allowance allocations to electricity sector. Clim. Pol. 2006, 6:73-91.
    • (2006) Clim. Pol. , vol.6 , pp. 73-91
    • Neuhoff, K.1    Martinez, K.K.2    Sato, M.3
  • 21
    • 0001085468 scopus 로고
    • Extensions of GAMS for complementarity problems arising in applied economic analysis
    • Rutherford T.F. Extensions of GAMS for complementarity problems arising in applied economic analysis. J. Econ. Dyn. Control. 1995, 19:1-8.
    • (1995) J. Econ. Dyn. Control. , vol.19 , pp. 1-8
    • Rutherford, T.F.1
  • 22
    • 33747793379 scopus 로고    scopus 로고
    • 2 cost pass through and windfall profits in the power sector
    • 2 cost pass through and windfall profits in the power sector. Clim. Pol. 2006, 6:49-72.
    • (2006) Clim. Pol. , vol.6 , pp. 49-72
    • Sijm, J.1    Neuhoff, K.2    Chen, Y.3
  • 25
    • 0001104022 scopus 로고    scopus 로고
    • Measuring duopoly power in the British electricity spot market
    • Wolfram C.D. Measuring duopoly power in the British electricity spot market. Am. Econ. Rev. 1999, 89:805-826.
    • (1999) Am. Econ. Rev. , vol.89 , pp. 805-826
    • Wolfram, C.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.