메뉴 건너뛰기




Volumn 34, Issue , 2014, Pages 1-7

Development route of the wind power industry in China

Author keywords

China; Development route; Renewable energy; Wind power

Indexed keywords

INDUSTRIAL RESEARCH; LAWS AND LEGISLATION; TURBINES;

EID: 84896456232     PISSN: 13640321     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.rser.2014.01.071     Document Type: Review
Times cited : (24)

References (30)
  • 3
    • 84872311202 scopus 로고    scopus 로고
    • Potential challenges of integrating large-scale wind energy into the power grid - A review
    • G.M. Shafiullah, Amanullah M.T. Oo, A.B.M. Shawkat Ali, and Peter Wolfs Potential challenges of integrating large-scale wind energy into the power grid - a review Renew Sustain Energy Rev 20 2013 306 321
    • (2013) Renew Sustain Energy Rev , vol.20 , pp. 306-321
    • Shafiullah, G.M.1    Oo, A.M.T.2    Shawkat Ali, A.B.M.3    Wolfs, P.4
  • 4
    • 84871821622 scopus 로고    scopus 로고
    • A critical review of factors affecting the wind power generation industry in China
    • Z.Y. Zhao, Yan Hong, J. Zuo, Y.X. Tian, and G. Zillante A critical review of factors affecting the wind power generation industry in China Renew Sustain Energy Rev 19 2013 499 508
    • (2013) Renew Sustain Energy Rev , vol.19 , pp. 499-508
    • Zhao, Z.Y.1    Hong, Y.2    Zuo, J.3    Tian, Y.X.4    Zillante, G.5
  • 7
    • 36349019321 scopus 로고    scopus 로고
    • Present status and prospect of wind power in China
    • X.R. Wang, W.S. Wang, and H.Z. Dai Present status and prospect of wind power in China Electr Power 37 1 2004 81 84
    • (2004) Electr Power , vol.37 , Issue.1 , pp. 81-84
    • Wang, X.R.1    Wang, W.S.2    Dai, H.Z.3
  • 8
    • 84896466960 scopus 로고    scopus 로고
    • Sxcoal Net. Chinas installed capacity of wind power becomes first in the world in 2012 [available from: ]
    • Sxcoal Net. Add 35% of the installed capacity, Chinas installed capacity of wind power becomes first in the world in 2012; 2013 [available from: 〈http://www.sxcoal.com/dl/3042105/articlenew.html ].
    • (2013) Add 35% of the Installed Capacity
  • 9
    • 84866277459 scopus 로고    scopus 로고
    • How to implement a wind power project in China? Management procedure and model study
    • Z.Y. Zhao, and R.D. Chang How to implement a wind power project in China? Management procedure and model study Renew Energy 50 2013 950 958
    • (2013) Renew Energy , vol.50 , pp. 950-958
    • Zhao, Z.Y.1    Chang, R.D.2
  • 12
    • 84896469538 scopus 로고    scopus 로고
    • Wind energy resources and wind power development
    • Z.M. Li, and D.B. Zhao Wind energy resources and wind power development Min Process Equip 35 10 2007 19 21
    • (2007) Min Process Equip , vol.35 , Issue.10 , pp. 19-21
    • Li, Z.M.1    Zhao, D.B.2
  • 14
    • 84893346855 scopus 로고    scopus 로고
    • Principle and development of wind power generation
    • H.H. Wang Principle and development of wind power generation Machine Build Autom 39 1 2010 175 178
    • (2010) Machine Build Autom , vol.39 , Issue.1 , pp. 175-178
    • Wang, H.H.1
  • 15
  • 16
    • 84896444646 scopus 로고    scopus 로고
    • Elementary discussion of cost control in wind power generation projects
    • Y.J. Chu, S.F. Qu, and J.H. Xu Elementary discussion of cost control in wind power generation projects Shangdong Electr Power Technol 180 2 2011 14 16
    • (2011) Shangdong Electr Power Technol , vol.180 , Issue.2 , pp. 14-16
    • Chu, Y.J.1    Qu, S.F.2    Xu, J.H.3
  • 17
    • 82355171755 scopus 로고    scopus 로고
    • An evaluation of Chinese wind turbine manufacturers using the enterprise niche theory
    • Z.Y. Zhao, W.J. Ling, and G. Zillante An evaluation of Chinese wind turbine manufacturers using the enterprise niche theory Renew Sustain Energy Rev 16 1 2012 725 734
    • (2012) Renew Sustain Energy Rev , vol.16 , Issue.1 , pp. 725-734
    • Zhao, Z.Y.1    Ling, W.J.2    Zillante, G.3
  • 21
    • 84897424242 scopus 로고    scopus 로고
    • National Development and Reform Commission [in Chinese]
    • National Development and Reform Commission. Renewable energy long-term development plan; 2007 [in Chinese].
    • (2007) Renewable Energy Long-term Development Plan
  • 22
    • 84896485791 scopus 로고    scopus 로고
    • National Development and Reform Commission [in Chinese]
    • National Development and Reform Commission. Renewable energy eleventh five-year plan; 2008 [in Chinese].
    • (2008) Renewable Energy Eleventh Five-year Plan
  • 25
    • 84899643526 scopus 로고    scopus 로고
    • Energy price of water for the China Price Association Professional Committee research group [in Chinese]
    • Energy price of water for the China Price Association Professional Committee research group. Chinas wind power industry development and its feed-in tariff; 2010 [in Chinese].
    • (2010) Chinas Wind Power Industry Development and Its Feed-in Tariff
  • 29
    • 84896455306 scopus 로고    scopus 로고
    • The National Peoples Congress of China
    • The National Peoples Congress of China. Energy Conservation Law; 1997.
    • (1997) Energy Conservation Law
  • 30
    • 84896447751 scopus 로고    scopus 로고
    • In the legal framework under the influence factor analysis of renewable energy
    • Z.X. Wang In the legal framework under the influence factor analysis of renewable energy Electr Power 38 9 2005 74 78
    • (2005) Electr Power , vol.38 , Issue.9 , pp. 74-78
    • Wang, Z.X.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.