메뉴 건너뛰기




Volumn 3, Issue 3, 2013, Pages 78-94

Railway line capacity consumption of different railway signalling systems under scheduled and disturbed conditions

Author keywords

Capacity consumption; Disturbance handling; ERTMS; ETCS; Infrastructure occupation; Schedule optimization

Indexed keywords

BRANCH AND BOUND METHOD; MONTE CARLO METHODS; RAILROADS; TRAFFIC CONTROL;

EID: 84894633929     PISSN: 22109706     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jrtpm.2013.12.001     Document Type: Article
Times cited : (114)

References (37)
  • 2
    • 36148955836 scopus 로고    scopus 로고
    • Reconstruction of train trajectories from track occupation data to determine the effects of a driver information system
    • WIT Press, Southampton
    • Albrecht T., Goverde R.M.P., Weeda V.A., Van Luipen J. Reconstruction of train trajectories from track occupation data to determine the effects of a driver information system. WIT Transactions on The Built Environment 2006, vol. 88:207-216. WIT Press, Southampton.
    • (2006) WIT Transactions on The Built Environment , vol.88 , pp. 207-216
    • Albrecht, T.1    Goverde, R.M.P.2    Weeda, V.A.3    Van Luipen, J.4
  • 4
    • 84894610401 scopus 로고    scopus 로고
    • Capacity effects of ERTMS Level 2 from a Dutch perspective
    • Bartholomeus M.G.P., van Touw B.L.J.C., Weits E.A.G. Capacity effects of ERTMS Level 2 from a Dutch perspective. Signal+Draht 2011, 103(10):34-40.
    • (2011) Signal+Draht , vol.103 , Issue.10 , pp. 34-40
    • Bartholomeus, M.G.P.1    van Touw, B.L.J.C.2    Weits, E.A.G.3
  • 5
    • 84859705420 scopus 로고    scopus 로고
    • A model predictive control approach for discrete-time rescheduling in complex central railway station areas
    • Caimi G., Fuchsberger M., Laumanns M., Lüthi M. A model predictive control approach for discrete-time rescheduling in complex central railway station areas. Comput. Oper. Res. 2012, 39(11):2578-2593.
    • (2012) Comput. Oper. Res. , vol.39 , Issue.11 , pp. 2578-2593
    • Caimi, G.1    Fuchsberger, M.2    Laumanns, M.3    Lüthi, M.4
  • 6
    • 69249202566 scopus 로고    scopus 로고
    • Evaluation of green wave policy in real-time railway traffic management
    • Corman F., D'Ariano A., Pacciarelli D., Pranzo M. Evaluation of green wave policy in real-time railway traffic management. Transp. Res. Part C 2009, 17(6):607-616.
    • (2009) Transp. Res. Part C , vol.17 , Issue.6 , pp. 607-616
    • Corman, F.1    D'Ariano, A.2    Pacciarelli, D.3    Pranzo, M.4
  • 7
    • 77956307098 scopus 로고    scopus 로고
    • Rescheduling dense train traffic over complex station interlocking areas
    • Springer, Berlin, R.K. Ahuja, R.H. Moehring, C.D. Zaroliagis (Eds.) Robust and Online Large-Scale Optimization: Models and Techniques for Transportation Systems
    • Corman F., Goverde R.M.P., D'Ariano A. Rescheduling dense train traffic over complex station interlocking areas. Lecture Notes in Computer Science 2009, vol. 5868:369-386. Springer, Berlin. R.K. Ahuja, R.H. Moehring, C.D. Zaroliagis (Eds.).
    • (2009) Lecture Notes in Computer Science , vol.5868 , pp. 369-386
    • Corman, F.1    Goverde, R.M.P.2    D'Ariano, A.3
  • 8
    • 79958004969 scopus 로고    scopus 로고
    • Effectiveness of dynamic reordering and rerouting of trains in a complicated and densely occupied station area
    • Corman F., D'Ariano A., Pranzo M., Hansen I.A. Effectiveness of dynamic reordering and rerouting of trains in a complicated and densely occupied station area. Transp. Plann. Technol. 2011, 34(4):341-362.
    • (2011) Transp. Plann. Technol. , vol.34 , Issue.4 , pp. 341-362
    • Corman, F.1    D'Ariano, A.2    Pranzo, M.3    Hansen, I.A.4
  • 9
    • 80054114657 scopus 로고    scopus 로고
    • Optimal inter-area coordination of train rescheduling decisions
    • Corman F., D'Ariano A., Pacciarelli D., Pranzo M. Optimal inter-area coordination of train rescheduling decisions. Transp. Res. Part E 2012, 48(1):71-88.
    • (2012) Transp. Res. Part E , vol.48 , Issue.1 , pp. 71-88
    • Corman, F.1    D'Ariano, A.2    Pacciarelli, D.3    Pranzo, M.4
  • 10
    • 59749089450 scopus 로고    scopus 로고
    • An advanced real-time train dispatching system for minimizing the propagation of delays in a dispatching area under severe disturbances
    • D'Ariano A., Pranzo M. An advanced real-time train dispatching system for minimizing the propagation of delays in a dispatching area under severe disturbances. Networks Spatial Econ. 2009, 9(1):63-84.
    • (2009) Networks Spatial Econ. , vol.9 , Issue.1 , pp. 63-84
    • D'Ariano, A.1    Pranzo, M.2
  • 11
    • 34249889301 scopus 로고    scopus 로고
    • Conflict resolution and train speed coordination for solving real-time timetable perturbations
    • D'Ariano A., Pranzo M., Hansen I.A. Conflict resolution and train speed coordination for solving real-time timetable perturbations. IEEE Trans. Intell. Transp. Syst. 2007, 8(2):208-222.
    • (2007) IEEE Trans. Intell. Transp. Syst. , vol.8 , Issue.2 , pp. 208-222
    • D'Ariano, A.1    Pranzo, M.2    Hansen, I.A.3
  • 12
    • 34249982545 scopus 로고    scopus 로고
    • A branch and bound algorithm for scheduling trains in a railway network
    • D'Ariano A., Pacciarelli D., Pranzo M. A branch and bound algorithm for scheduling trains in a railway network. Eur. J. Oper. Res. 2007, 183(2):643-657.
    • (2007) Eur. J. Oper. Res. , vol.183 , Issue.2 , pp. 643-657
    • D'Ariano, A.1    Pacciarelli, D.2    Pranzo, M.3
  • 13
    • 78651333580 scopus 로고    scopus 로고
    • Effects of communications-based train control and electronically controlled pneumatic brakes on railroad capacity. Transportation Research Record, 2159, Transportation Research Board, Washington, DC
    • Dingler, M.H., Lai, Y.C., Barkan, C.P.L., 2010. Effects of communications-based train control and electronically controlled pneumatic brakes on railroad capacity. Transportation Research Record, 2159, Transportation Research Board, Washington, DC, 77-84.
    • (2010) , pp. 77-84
    • Dingler, M.H.1    Lai, Y.C.2    Barkan, C.P.L.3
  • 14
    • 33748691351 scopus 로고    scopus 로고
    • Railway timetable stability analysis using max-plus system theory
    • Goverde R.M.P. Railway timetable stability analysis using max-plus system theory. Transp. Res. Part B 2007, 41(2):179-201.
    • (2007) Transp. Res. Part B , vol.41 , Issue.2 , pp. 179-201
    • Goverde, R.M.P.1
  • 15
    • 78650416889 scopus 로고    scopus 로고
    • A coupling approach to estimating the Lyapunov exponent of stochastic max-plus linear systems
    • Goverde R.M.P., Heidergott B., Merlet G. A coupling approach to estimating the Lyapunov exponent of stochastic max-plus linear systems. Eur. J. Oper. Res. 2011, 210(2):249-257.
    • (2011) Eur. J. Oper. Res. , vol.210 , Issue.2 , pp. 249-257
    • Goverde, R.M.P.1    Heidergott, B.2    Merlet, G.3
  • 16
    • 84894616440 scopus 로고    scopus 로고
    • Innovatie op het spoor en mogelijkheden van ERTMS in Nederland (Innovation on the railways and opportunities of ERTMS in the Netherlands, in Dutch). Kamerstuk kst-32707-11, Dutch Parliament, The Hague.
    • Goverde, R.M.P., Hansen, I.A., Corman, F., D'Ariano, A., Trinckauf, J., 2012. Innovatie op het spoor en mogelijkheden van ERTMS in Nederland (Innovation on the railways and opportunities of ERTMS in the Netherlands, in Dutch). Kamerstuk kst-32707-11, Dutch Parliament, The Hague.
    • (2012)
    • Goverde, R.M.P.1    Hansen, I.A.2    Corman, F.3    D'Ariano, A.4    Trinckauf, J.5
  • 18
    • 36148986847 scopus 로고    scopus 로고
    • An algorithm for train rescheduling using rescheduling pattern description language R
    • WIT Press, Southampton, Computers in Railways X
    • Hirai C., Tomii N., Tashiro Y., Kondou S., Fujimori A. An algorithm for train rescheduling using rescheduling pattern description language R. WIT Transactions on The Built Environment 2006, vol. 88:551-561. WIT Press, Southampton.
    • (2006) WIT Transactions on The Built Environment , vol.88 , pp. 551-561
    • Hirai, C.1    Tomii, N.2    Tashiro, Y.3    Kondou, S.4    Fujimori, A.5
  • 19
    • 84894625174 scopus 로고    scopus 로고
    • Invensys Rail Group (IRG), 2007. Transportation capacity research paper - a comparison of the costs of different methods of increasing capacity in road & rail environments, London, UK.
    • Invensys Rail Group (IRG), 2007. Transportation capacity research paper - a comparison of the costs of different methods of increasing capacity in road & rail environments, London, UK.
  • 20
    • 84870608720 scopus 로고    scopus 로고
    • Process mining of train describer event data and automatic conflict identification
    • WIT Press, Southampton, C.A. Brebbia, N. Tomii, P. Tzieropoulos, J.M. Mera (Eds.) Computers in Railways XIII
    • Kecman P., Goverde R.M.P. Process mining of train describer event data and automatic conflict identification. WIT Transactions on The Built Environment 2012, vol. 127:227-238. WIT Press, Southampton. C.A. Brebbia, N. Tomii, P. Tzieropoulos, J.M. Mera (Eds.).
    • (2012) WIT Transactions on The Built Environment , vol.127 , pp. 227-238
    • Kecman, P.1    Goverde, R.M.P.2
  • 21
    • 84876722564 scopus 로고    scopus 로고
    • Development of analytical capacity models for conventional railways with advanced signaling systems
    • Lai Y.C., Wang S.H. Development of analytical capacity models for conventional railways with advanced signaling systems. ASCE J. Transp. Eng. 2013, 138(7):961-974.
    • (2013) ASCE J. Transp. Eng. , vol.138 , Issue.7 , pp. 961-974
    • Lai, Y.C.1    Wang, S.H.2
  • 22
    • 59749094873 scopus 로고    scopus 로고
    • Evaluation of railway networks with single track operation using the UIC 406 capacity method
    • Landex A. Evaluation of railway networks with single track operation using the UIC 406 capacity method. Networks Spatial Econ. 2009, 9(1):7-23.
    • (2009) Networks Spatial Econ. , vol.9 , Issue.1 , pp. 7-23
    • Landex, A.1
  • 23
    • 84856899911 scopus 로고    scopus 로고
    • Applicability of the analytical UIC Code 406 compression method for evaluating line and station capacity
    • Lindner T. Applicability of the analytical UIC Code 406 compression method for evaluating line and station capacity. J. Rail Transp. Plann. Manage. 2011, 1(1):49-57.
    • (2011) J. Rail Transp. Plann. Manage. , vol.1 , Issue.1 , pp. 49-57
    • Lindner, T.1
  • 24
    • 84894638827 scopus 로고    scopus 로고
    • Recommendations for enhancing UIC code 406 method to evaluate railroad infrastructure capacity. In: TRB 89th Annual Meeting Compendium of Papers, Transportation Research Board, Washington.
    • Lindner, T., Pachl, J., 2010. Recommendations for enhancing UIC code 406 method to evaluate railroad infrastructure capacity. In: TRB 89th Annual Meeting Compendium of Papers, Transportation Research Board, Washington.
    • (2010)
    • Lindner, T.1    Pachl, J.2
  • 25
    • 84870241953 scopus 로고    scopus 로고
    • A set packing inspired method for real-time junction train routing
    • Lusby R., Larsen J., Ehrgott M., Ryan D.M. A set packing inspired method for real-time junction train routing. Comput. Oper. Res. 2013, 40(3):713-724.
    • (2013) Comput. Oper. Res. , vol.40 , Issue.3 , pp. 713-724
    • Lusby, R.1    Larsen, J.2    Ehrgott, M.3    Ryan, D.M.4
  • 26
    • 0037121475 scopus 로고    scopus 로고
    • Job shop scheduling with blocking and no-wait constraints
    • Mascis A., Pacciarelli D. Job shop scheduling with blocking and no-wait constraints. Eur. J. Oper. Res. 2002, 143(3):498-517.
    • (2002) Eur. J. Oper. Res. , vol.143 , Issue.3 , pp. 498-517
    • Mascis, A.1    Pacciarelli, D.2
  • 27
    • 84856905539 scopus 로고    scopus 로고
    • A method for using stochastic blocking times to improve timetable planning
    • Medeossi G., Longo G., de Fabris S. A method for using stochastic blocking times to improve timetable planning. J. Rail Transp. Plann. Manage. 2011, 1(1):1-13.
    • (2011) J. Rail Transp. Plann. Manage. , vol.1 , Issue.1 , pp. 1-13
    • Medeossi, G.1    Longo, G.2    de Fabris, S.3
  • 29
    • 84894639348 scopus 로고    scopus 로고
    • ProRail, 2010. Technische vergelijking tussen NS54 ATB-EG en ERTMS Level 2 (Technical comparison between NS'54 ATB-EG and ERTMS Level 2, in Dutch). Technical Report EDMS 2472676, ProRail, Utrecht, 26 januari
    • ProRail, 2010. Technische vergelijking tussen NS54 ATB-EG en ERTMS Level 2 (Technical comparison between NS'54 ATB-EG and ERTMS Level 2, in Dutch). Technical Report EDMS 2472676, ProRail, Utrecht, 26 januari 2010.
    • (2010)
  • 30
    • 33748695294 scopus 로고    scopus 로고
    • A constraint programming model for real-time train scheduling at junctions
    • Rodriguez J. A constraint programming model for real-time train scheduling at junctions. Transp. Res. Part B 2007, 41(2):231-245.
    • (2007) Transp. Res. Part B , vol.41 , Issue.2 , pp. 231-245
    • Rodriguez, J.1
  • 32
    • 36448977879 scopus 로고    scopus 로고
    • Railway traffic disturbance management: an experimental analysis of disturbance complexity, management objectives and limitations in planning horizon
    • Törnquist J. Railway traffic disturbance management: an experimental analysis of disturbance complexity, management objectives and limitations in planning horizon. Transp. Res. Part A 2007, 41(3):249-266.
    • (2007) Transp. Res. Part A , vol.41 , Issue.3 , pp. 249-266
    • Törnquist, J.1
  • 33
    • 84894631693 scopus 로고    scopus 로고
    • Transport Research Laboratory (TRL), 2010. ERTMS Level 3 Risks and Benefits to UK Railways. Wokingham, UK.
    • Transport Research Laboratory (TRL), 2010. ERTMS Level 3 Risks and Benefits to UK Railways. Wokingham, UK.
  • 34
    • 84894633345 scopus 로고    scopus 로고
    • UIC, 2004. UIC Code 406: Capacity. International Union of Railways, Paris.
    • UIC, 2004. UIC Code 406: Capacity. International Union of Railways, Paris.
  • 35
    • 84894610850 scopus 로고    scopus 로고
    • UIC, 2008. Influence of ETCS on the line capacity: Generic study. International Union of Railways, Paris.
    • UIC, 2008. Influence of ETCS on the line capacity: Generic study. International Union of Railways, Paris.
  • 36
    • 84894630463 scopus 로고    scopus 로고
    • UIC, 2010. Influence of the European Train Control System (ETCS) on the capacity of nodes. International Union of Railways, Paris.
    • UIC, 2010. Influence of the European Train Control System (ETCS) on the capacity of nodes. International Union of Railways, Paris.
  • 37
    • 84874482633 scopus 로고    scopus 로고
    • Eurailpress, Hamburg, P. Winter (Ed.)
    • Compendium on ERTMS 2009, Eurailpress, Hamburg. P. Winter (Ed.).
    • (2009) Compendium on ERTMS


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.