메뉴 건너뛰기




Volumn 2014, Issue , 2014, Pages

Risk evaluation on UHV power transmission construction project based on AHP and FCE method

Author keywords

[No Author keywords available]

Indexed keywords

ANALYTIC HIERARCHY PROCESS (AHP); CONSTRUCTION PROJECTS; ENVIRONMENTAL RISKS; EVALUATION RESULTS; FUZZY COMPREHENSIVE EVALUATION; OCCURRENCE PROBABILITY; RISKS AND UNCERTAINTIES; ULTRA HIGH VOLTAGE;

EID: 84893826909     PISSN: 1024123X     EISSN: 15635147     Source Type: Journal    
DOI: 10.1155/2014/687568     Document Type: Article
Times cited : (27)

References (16)
  • 1
    • 84878151552 scopus 로고    scopus 로고
    • The energy supply and demand pattern of China: A review of evolution and sustainable development
    • 10.1016/j.rser.2013.01.061
    • Liu J. P., Niu D. X., Song X. H., The energy supply and demand pattern of China: a review of evolution and sustainable development. Renewable and Sustainable Energy Reviews 2013 25 220 228 10.1016/j.rser.2013.01.061
    • (2013) Renewable and Sustainable Energy Reviews , vol.25 , pp. 220-228
    • Liu, J.P.1    Niu, D.X.2    Song, X.H.3
  • 2
    • 84876320540 scopus 로고    scopus 로고
    • A comparison of innovation policy in the smart grid industry across the pacific: China and the USA
    • 10.1016/j.enpol.2012.12.028
    • Lin C. C., Yang C. H., Shyua J. Z., A comparison of innovation policy in the smart grid industry across the pacific: china and the USA. Energy Policy 2013 57 119 132 10.1016/j.enpol.2012.12.028
    • (2013) Energy Policy , vol.57 , pp. 119-132
    • Lin, C.C.1    Yang, C.H.2    Shyua, J.Z.3
  • 3
    • 33646015040 scopus 로고    scopus 로고
    • A comparative analysis of business structures suitable for farmer-owned wind power projects in the United States
    • 2-s2.0-33646015040 10.1016/j.enpol.2005.01.003
    • Bolinger M., Wiser R., A comparative analysis of business structures suitable for farmer-owned wind power projects in the United States. Energy Policy 2006 34 14 1750 1761 2-s2.0-33646015040 10.1016/j.enpol.2005.01.003
    • (2006) Energy Policy , vol.34 , Issue.14 , pp. 1750-1761
    • Bolinger, M.1    Wiser, R.2
  • 4
    • 84859748273 scopus 로고    scopus 로고
    • Large scale technical and economical assessment of wind energy potential with a GIS tool: Case study Iowa
    • 2-s2.0-84859748273 10.1016/j.enpol.2012.01.061
    • Grassi S., Chokani N., Abhari R. S., Large scale technical and economical assessment of wind energy potential with a GIS tool: case study Iowa. Energy Policy 2012 45 73 85 2-s2.0-84859748273 10.1016/j.enpol.2012.01.061
    • (2012) Energy Policy , vol.45 , pp. 73-85
    • Grassi, S.1    Chokani, N.2    Abhari, R.S.3
  • 5
    • 84878140148 scopus 로고    scopus 로고
    • Project governance and path creation in the early stages of Finnish nuclear power projects
    • 10.1016/j.ijproman.2013.01.005
    • Hellström M., Ruuska I., Wikström K., Jåfs D., Project governance and path creation in the early stages of Finnish nuclear power projects. International Journal of Project Management 2013 31 5 712 723 10.1016/j.ijproman.2013.01.005
    • (2013) International Journal of Project Management , vol.31 , Issue.5 , pp. 712-723
    • Hellström, M.1    Ruuska, I.2    Wikström, K.3    Jåfs, D.4
  • 6
    • 84867331955 scopus 로고    scopus 로고
    • Fish passage principles to be considered for medium and large dams: The case study of a fish passage concept for a hydroelectric power project on the Mekong mainstem in Laos
    • 2-s2.0-79960862405 10.1016/j.ecoleng.2011.06.032
    • Baumann P., Stevanella G., Fish passage principles to be considered for medium and large dams: the case study of a fish passage concept for a hydroelectric power project on the Mekong mainstem in Laos. Ecological Engineering 2012 48 79 85 2-s2.0-79960862405 10.1016/j.ecoleng.2011.06.032
    • (2012) Ecological Engineering , vol.48 , pp. 79-85
    • Baumann, P.1    Stevanella, G.2
  • 7
    • 84862012563 scopus 로고    scopus 로고
    • Determining factor for the development of CDM biomass power projects
    • 2-s2.0-84857011827 10.1016/j.esd.2012.01.004
    • Amatayakul W., Berndes G., Determining factor for the development of CDM biomass power projects. Energy for Sustainable Development 2012 16 197 203 2-s2.0-84857011827 10.1016/j.esd.2012.01.004
    • (2012) Energy for Sustainable Development , vol.16 , pp. 197-203
    • Amatayakul, W.1    Berndes, G.2
  • 8
    • 84874290254 scopus 로고    scopus 로고
    • Risk analysis in ultra deep scientific drilling project-A fuzzy synthetic evaluation approach
    • 10.1016/j.ijproman.2012.09.015
    • Liu J. L., Li Q. X., Wang Y. H., Risk analysis in ultra deep scientific drilling project-A fuzzy synthetic evaluation approach. International Journal of Project Management 2013 31 3 449 458 10.1016/j.ijproman.2012.09.015
    • (2013) International Journal of Project Management , vol.31 , Issue.3 , pp. 449-458
    • Liu, J.L.1    Li, Q.X.2    Wang, Y.H.3
  • 9
    • 84901689780 scopus 로고    scopus 로고
    • A new practical approach to risk management for underground mining project in Quebec
    • 10.1016/j.jlp.2013.04.014
    • Badri A., Nadeau S., Gbodossou A., A new practical approach to risk management for underground mining project in Quebec. Journal of Loss Prevention in the Process Industries 2013 26 6 1145 1158 10.1016/j.jlp.2013.04.014
    • (2013) Journal of Loss Prevention in the Process Industries , vol.26 , Issue.6 , pp. 1145-1158
    • Badri, A.1    Nadeau, S.2    Gbodossou, A.3
  • 10
    • 84881659787 scopus 로고    scopus 로고
    • Risk identification for PPP waste-to-energy incineration projects in China
    • 10.1016/j.enpol.2013.06.041
    • Song J. B., Song D. R., Zhang X. Q., Sun Y., Risk identification for PPP waste-to-energy incineration projects in China. Energy Policy 2013 61 953 962 10.1016/j.enpol.2013.06.041
    • (2013) Energy Policy , vol.61 , pp. 953-962
    • Song, J.B.1    Song, D.R.2    Zhang, X.Q.3    Sun, Y.4
  • 11
    • 84884208630 scopus 로고    scopus 로고
    • An integrative framework for intelligent software project risk planning
    • 10.1016/j.dss.2012.12.029
    • Hu Y., Du J. F., Zhang X. Z., Hao X. L., Ngai E. W. T., Fan M., Liu M., An integrative framework for intelligent software project risk planning. Decision Support Systems 2013 55 4 927 937 10.1016/j.dss.2012.12.029
    • (2013) Decision Support Systems , vol.55 , Issue.4 , pp. 927-937
    • Hu, Y.1    Du, J.F.2    Zhang, X.Z.3    Hao, X.L.4    Ngai, E.W.T.5    Fan, M.6    Liu, M.7
  • 13
    • 77958573094 scopus 로고    scopus 로고
    • Project selection for oil-fields development by using the AHP and fuzzy TOPSIS methods
    • 2-s2.0-77958573094 10.1016/j.eswa.2010.02.103
    • Amiri M. P., Project selection for oil-fields development by using the AHP and fuzzy TOPSIS methods. Expert Systems with Applications 2010 37 9 6218 6224 2-s2.0-77958573094 10.1016/j.eswa.2010.02.103
    • (2010) Expert Systems with Applications , vol.37 , Issue.9 , pp. 6218-6224
    • Amiri, M.P.1
  • 14
    • 84893857990 scopus 로고    scopus 로고
    • External economies evaluation of wind power engineering project based on analytic hierarchy process and matter-element extension model
    • 848901 10.1155/2013/848901
    • Li H. Z., Guo S., External economies evaluation of wind power engineering project based on analytic hierarchy process and matter-element extension model. Mathematical Problems in Engineering 2013 2013 11 848901 10.1155/2013/848901
    • (2013) Mathematical Problems in Engineering , vol.2013 , pp. 11
    • Li, H.Z.1    Guo, S.2
  • 15
    • 80053094649 scopus 로고    scopus 로고
    • Application of fuzzy and synthetic judgment to risk assessment of dammed lake
    • 2-s2.0-80053094649
    • Chen F.-G., Yao H.-L., Shi W.-G., Application of fuzzy and synthetic judgment to risk assessment of dammed lake. Journal of Shanghai Jiaotong University 2011 45 1 67 75 2-s2.0-80053094649
    • (2011) Journal of Shanghai Jiaotong University , vol.45 , Issue.1 , pp. 67-75
    • Chen, F.-G.1    Yao, H.-L.2    Shi, W.-G.3
  • 16
    • 79959272982 scopus 로고    scopus 로고
    • Application of fuzzy comprehensive evaluation method to CENS
    • 2-s2.0-79959272982
    • Fang K., He B.-F., Yang M., Wang Z.-C., Application of fuzzy comprehensive evaluation method to CENS. Journal of Harbin Institute of Technology 2011 43 5 30 36 2-s2.0-79959272982
    • (2011) Journal of Harbin Institute of Technology , vol.43 , Issue.5 , pp. 30-36
    • Fang, K.1    He, B.-F.2    Yang, M.3    Wang, Z.-C.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.