-
1
-
-
0012230528
-
Optimal lot sizing/vehicle dispatching policies under stochastic lead times and stepwise fixed costs
-
Alp, O., N. Erkip, R. Gullu,. 2003. Optimal lot sizing/vehicle dispatching policies under stochastic lead times and stepwise fixed costs. Oper. Res. 51 (1): 160-166.
-
(2003)
Oper. Res.
, vol.51
, Issue.1
, pp. 160-166
-
-
Alp, O.1
Erkip, N.2
Gullu, R.3
-
2
-
-
38049077958
-
Tactical capacity management under capacity flexibility in make-to-stock systems
-
Alp, O., T. Tan,. 2008. Tactical capacity management under capacity flexibility in make-to-stock systems. IIE Trans. 40 (3): 221-237.
-
(2008)
IIE Trans.
, vol.40
, Issue.3
, pp. 221-237
-
-
Alp, O.1
Tan, T.2
-
3
-
-
0022076035
-
On the phase-type approximations of general distributions
-
Altiok, T., 1985. On the phase-type approximations of general distributions. IIE Trans. 17 (2): 110-116.
-
(1985)
IIE Trans.
, vol.17
, Issue.2
, pp. 110-116
-
-
Altiok, T.1
-
4
-
-
0025261521
-
Simple solution procedures for a class of two-echelon inventory systems
-
Axsäter, S., 1990. Simple solution procedures for a class of two-echelon inventory systems. Oper. Res. 38 (1): 64-69.
-
(1990)
Oper. Res.
, vol.38
, Issue.1
, pp. 64-69
-
-
Axsäter, S.1
-
5
-
-
0027634893
-
Exact and approximate evaluation of batch-ordering policies for two-level inventory systems
-
Axsäter, S., 1993. Exact and approximate evaluation of batch-ordering policies for two-level inventory systems. Oper. Res. 41 (4): 777-785.
-
(1993)
Oper. Res.
, vol.41
, Issue.4
, pp. 777-785
-
-
Axsäter, S.1
-
6
-
-
0000951506
-
On a basic class on inventory problems
-
Balintfy, J. L., 1964. On a basic class on inventory problems. Manage. Sci. 10 (2): 287-297.
-
(1964)
Manage. Sci.
, vol.10
, Issue.2
, pp. 287-297
-
-
Balintfy, J.L.1
-
7
-
-
84989491972
-
Planning for truck fleet size in the presence of a common carrier option
-
Ball, M. O., B. L. Golden, A. A. Assad, L. D. Bodin,. 1983. Planning for truck fleet size in the presence of a common carrier option. Decis. Sci. 14 (1): 103-120.
-
(1983)
Decis. Sci.
, vol.14
, Issue.1
, pp. 103-120
-
-
Ball, M.O.1
Golden, B.L.2
Assad, A.A.3
Bodin, L.D.4
-
8
-
-
0023861277
-
Multiproduct queueing networks with deterministic routing: Decomposition approach and the notion of interference
-
Bitran, G. R., D. Tirupati,. 1988. Multiproduct queueing networks with deterministic routing: Decomposition approach and the notion of interference. Manage. Sci. 34 (1): 75-100.
-
(1988)
Manage. Sci.
, vol.34
, Issue.1
, pp. 75-100
-
-
Bitran, G.R.1
Tirupati, D.2
-
10
-
-
0345041302
-
Managing a retailer's shelf space, inventory and transportation
-
Cachon, G., 2001. Managing a retailer's shelf space, inventory and transportation. Manuf. Serv. Oper. Manag. 3 (3): 211-229.
-
(2001)
Manuf. Serv. Oper. Manag.
, vol.3
, Issue.3
, pp. 211-229
-
-
Cachon, G.1
-
11
-
-
31144471511
-
A comparison of outbound dispatch policies for integrated inventory and transportation decisions
-
Cetinkaya, S., F. Mutlu, C.-Y. Lee,. 2006. A comparison of outbound dispatch policies for integrated inventory and transportation decisions. Eur. J. Oper. Res. 171 (3): 1094-1112.
-
(2006)
Eur. J. Oper. Res.
, vol.171
, Issue.3
, pp. 1094-1112
-
-
Cetinkaya, S.1
Mutlu, F.2
Lee, C.-Y.3
-
12
-
-
0036475290
-
The inventory benefit of shipment coordination and stock rebalancing in a supply chain
-
Cheung, K. L., H. Lee,. 2002. The inventory benefit of shipment coordination and stock rebalancing in a supply chain. Manage. Sci. 48 (2): 300-306.
-
(2002)
Manage. Sci.
, vol.48
, Issue.2
, pp. 300-306
-
-
Cheung, K.L.1
Lee, H.2
-
14
-
-
0027844639
-
Optimal base stock policies and truck capacity in a two echelon system
-
Ernst, R., F. D. Pyke,. 1993. Optimal base stock policies and truck capacity in a two echelon system. Naval Res. Logist. 40 (7): 879-903.
-
(1993)
Naval Res. Logist.
, vol.40
, Issue.7
, pp. 879-903
-
-
Ernst, R.1
Pyke, F.D.2
-
15
-
-
0021489143
-
A combined vehicle routing and inventory allocation problem
-
Federgruen, A., P. Zipkin,. 1984. A combined vehicle routing and inventory allocation problem. Oper. Res. 32 (5): 1019-1037.
-
(1984)
Oper. Res.
, vol.32
, Issue.5
, pp. 1019-1037
-
-
Federgruen, A.1
Zipkin, P.2
-
16
-
-
57849116133
-
-
FHWA (accessed date December 10, 2012)
-
FHWA. 2005. Logistics Costs and U.S. Gross Domestic Product. Available at http://ops.fhwa.dot.gov/freight/freight-analysis/econ-methods/lcdp-rep/ (accessed date December 10, 2012).
-
(2005)
Logistics Costs and U.S. Gross Domestic Product
-
-
-
17
-
-
0035687291
-
A simple solution for the M/D/C waiting time distribution
-
Franx, G. J., 2001. A simple solution for the M/D/C waiting time distribution. Oper. Res. Lett. 29 (5): 221-229.
-
(2001)
Oper. Res. Lett.
, vol.29
, Issue.5
, pp. 221-229
-
-
Franx, G.J.1
-
18
-
-
0022146583
-
A multi-echelon inventory model for a repairable item with one-for-one replenishment
-
Graves, S. C., 1985. A multi-echelon inventory model for a repairable item with one-for-one replenishment. Manage. Sci. 31 (10): 1247-1256.
-
(1985)
Manage. Sci.
, vol.31
, Issue.10
, pp. 1247-1256
-
-
Graves, S.C.1
-
19
-
-
33847332080
-
Coordinated replenishment strategies in inventory/distribution systems
-
Gurbuz, M. C., K. Moinzadeh, Y. P. Zhou,. 2007. Coordinated replenishment strategies in inventory/distribution systems. Manage. Sci. 53 (2): 293-307.
-
(2007)
Manage. Sci.
, vol.53
, Issue.2
, pp. 293-307
-
-
Gurbuz, M.C.1
Moinzadeh, K.2
Zhou, Y.P.3
-
20
-
-
0001459252
-
Optimal continuous review policies for two product inventory systems with joint set-up costs
-
Ignall, E., 1969. Optimal continuous review policies for two product inventory systems with joint set-up costs. Manage. Sci. 15 (5): 278-283.
-
(1969)
Manage. Sci.
, vol.15
, Issue.5
, pp. 278-283
-
-
Ignall, E.1
-
21
-
-
77951141126
-
An analytical model for computing the optimal time-and-quantity-based policy for consolidated shipments
-
Mutlu, F., S. Cetinkaya, S., J. H. Bookbinder,. 2010. An analytical model for computing the optimal time-and-quantity-based policy for consolidated shipments. IIE Trans. 42 (5): 367-377.
-
(2010)
IIE Trans.
, vol.42
, Issue.5
, pp. 367-377
-
-
Mutlu, F.1
Cetinkaya, S.2
Bookbinder, S.J.H.3
-
22
-
-
10444274122
-
An analytical study of the q(s,s) policy applied to the joint replenishment problem
-
Nielsen, C., C. Larsen,. 2005. An analytical study of the q(s,s) policy applied to the joint replenishment problem. Eur. J. Oper. Res. 163 (3): 721-732.
-
(2005)
Eur. J. Oper. Res.
, vol.163
, Issue.3
, pp. 721-732
-
-
Nielsen, C.1
Larsen, C.2
-
23
-
-
84892916601
-
-
Working paper, Bilkent University, Ankara, Turkey.
-
Ozkaya, B. Y,., U. Gurler, E. Berk,. 2005. The stochastic joint replenishment problem: A new policy and analysis for single and two echelon inventory systems. Working paper, Bilkent University, Ankara, Turkey.
-
(2005)
The Stochastic Joint Replenishment Problem: A New Policy and Analysis for Single and Two Echelon Inventory Systems
-
-
Ozkaya, B.Y.1
Gurler, U.2
Berk, E.3
-
24
-
-
33748294505
-
The stochastic joint replenishment problem: A new policy, analysis, and insights
-
Ozkaya, B. Y., U. Gurler, E. Berk,. 2006. The stochastic joint replenishment problem: a new policy, analysis, and insights. Naval Res. Logist. 53 (6): 525-546.
-
(2006)
Naval Res. Logist.
, vol.53
, Issue.6
, pp. 525-546
-
-
Ozkaya, B.Y.1
Gurler, U.2
Berk, E.3
-
25
-
-
84985822215
-
A comparison of three joint ordering policies
-
Pantumsinchai, P., 1992. A comparison of three joint ordering policies. Decis. Sci. 23 (1): 111-127.
-
(1992)
Decis. Sci.
, vol.23
, Issue.1
, pp. 111-127
-
-
Pantumsinchai, P.1
-
28
-
-
34547229160
-
An analytical method for the calculation of the waiting time distribution of a discrete time G/G/1-queueing system with batch arrivals
-
Schleyer, M., K. Furmans,. 2007. An analytical method for the calculation of the waiting time distribution of a discrete time G/G/1-queueing system with batch arrivals. OR Spectrum. 29 (4): 745-763.
-
(2007)
OR Spectrum.
, vol.29
, Issue.4
, pp. 745-763
-
-
Schleyer, M.1
Furmans, K.2
-
29
-
-
77954576980
-
Improving supply chain performance: Real-time demand information and flexible deliveries
-
Shang, K., S. Zhou, G.-J. van Houtum,. 2010. Improving supply chain performance: Real-time demand information and flexible deliveries. Manuf. Serv. Oper. Manag. 12 (3): 430-448.
-
(2010)
Manuf. Serv. Oper. Manag.
, vol.12
, Issue.3
, pp. 430-448
-
-
Shang, K.1
Zhou, S.2
Van Houtum, G.-J.3
-
30
-
-
21844457118
-
An integrated inventory-routing system for multi-item joint replenishment with limited vehicle capacity
-
Sindhuchao, S., H. E. Romeijn, E. Akcali, R. Boondiskulchok,. 2005. An integrated inventory-routing system for multi-item joint replenishment with limited vehicle capacity. J. Global Optimization 32 (1): 93-118.
-
(2005)
J. Global Optimization
, vol.32
, Issue.1
, pp. 93-118
-
-
Sindhuchao, S.1
Romeijn, H.E.2
Akcali, E.3
Boondiskulchok, R.4
-
31
-
-
77952624796
-
A joint replenishment policy with individual control and constant size orders
-
Tanrikulu, M. M., A. Sen, O. Alp,. 2010. A joint replenishment policy with individual control and constant size orders. Int. J. Prod. Res. 48 (14): 4253-4271.
-
(2010)
Int. J. Prod. Res.
, vol.48
, Issue.14
, pp. 4253-4271
-
-
Tanrikulu, M.M.1
Sen, A.2
Alp, O.3
-
33
-
-
33746361489
-
Contractual agreements for coordination and vendor-managed delivery under explicit transportation considerations
-
Toptal, A., S. Cetinkaya,. 2006. Contractual agreements for coordination and vendor-managed delivery under explicit transportation considerations. Naval Res. Logist. 53 (5): 397-417.
-
(2006)
Naval Res. Logist.
, vol.53
, Issue.5
, pp. 397-417
-
-
Toptal, A.1
Cetinkaya, S.2
-
34
-
-
3042765510
-
The buyer-vendor coordination problem: Modeling inbound and outbound cargo capacity and costs
-
Toptal, A., S. Cetinkaya, C. Y. Lee,. 2003. The buyer-vendor coordination problem: Modeling inbound and outbound cargo capacity and costs. IIE. Trans. 35 (11): 987-1002.
-
(2003)
IIE. Trans.
, vol.35
, Issue.11
, pp. 987-1002
-
-
Toptal, A.1
Cetinkaya, S.2
Lee, C.Y.3
-
35
-
-
0019900567
-
Approximating a point process by a renewal process, I: Two basic methods
-
Whitt, W., 1982. Approximating a point process by a renewal process, I: Two basic methods. Oper. Res. 30 (1): 125-147.
-
(1982)
Oper. Res.
, vol.30
, Issue.1
, pp. 125-147
-
-
Whitt, W.1
-
36
-
-
84986958774
-
Approximations for the GI/G/M queue
-
Whitt, W., 1993. Approximations for the GI/G/M queue. Prod. Oper. Manag. 2 (2): 114-161.
-
(1993)
Prod. Oper. Manag.
, vol.2
, Issue.2
, pp. 114-161
-
-
Whitt, W.1
-
37
-
-
0001233677
-
Transportation contracts and safety stocks for just-in-time deliveries
-
Yano, C. A., Y. Gerchak,. 1989. Transportation contracts and safety stocks for just-in-time deliveries. J. Manuf. Oper. Manag. 2 (4): 314-330.
-
(1989)
J. Manuf. Oper. Manag.
, vol.2
, Issue.4
, pp. 314-330
-
-
Yano, C.A.1
Gerchak, Y.2
|