Volumn 66, Issue , 2014, Pages 450-461

The cost of nuclear electricity: France after Fukushima

Author keywords

Alternative fuels; Electricity; Levelized cost; Nuclear power

Indexed keywords

ALTERNATIVE FUELS; COSTS; ELECTRICITY; NUCLEAR ENERGY; NUCLEAR FUELS; WIND POWER;

EID: 84892481042     PISSN: 03014215     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.enpol.2013.11.037     Document Type: Article
Times cited : (62)

References (28)
  • 1
    • 65549151875 scopus 로고    scopus 로고
    • Capacity factor of wind power. realized values vs. estimates
    • Boccard N. Capacity factor of wind power. realized values vs. estimates. Energy Policy 2009, 37(7):2679-2688.
    • (2009) Energy Policy , vol.37 , Issue.7 , pp. 2679-2688
    • Boccard, N.1
  • 2
    • 84892475864 scopus 로고    scopus 로고
    • @techreport{nuko2012,Address = {Australian National University},Author = {Boccard, Nicolas},Institution = {CEPR Discussion Paper Series},Number = {DP687},Title = {The Cost of Nuclear Electricity: France after Fukushima},Url =
    • @techreport{nuko2012,Address = {Australian National University},Author = {Boccard, Nicolas},Institution = {CEPR Discussion Paper Series},Number = {DP687},Title = {The Cost of Nuclear Electricity: France after Fukushima},Url = {http://cbe.anu.edu.au/media/3095431/dp687.pdf},Year = {2013},.
    • (2013)
  • 3
    • 84892485526 scopus 로고    scopus 로고
    • Les français, le nucléaire et la campagne présidentielle 2012. Technical Report, TriÉlec.
    • Brouard, S., Guinaudeau, I., Gougou, F., Persico, S., 2012. Les français, le nucléaire et la campagne présidentielle 2012. Technical Report, TriÉlec.
    • (2012)
    • Brouard, S.1    Guinaudeau, I.2    Gougou, F.3    Persico, S.4
  • 4
    • 84892480838 scopus 로고    scopus 로고
    • Rapport de la commission sur le prix de l'accès régulé à l'électricité nucléaire historique. Technical Report, Ministry of Ecology, Sustainable Development and Energy.
    • Champsaur, P., Durieux, B., Percebois, J., 2011. Rapport de la commission sur le prix de l'accès régulé à l'électricité nucléaire historique. Technical Report, Ministry of Ecology, Sustainable Development and Energy.
    • (2011)
    • Champsaur, P.1    Durieux, B.2    Percebois, J.3
  • 5
    • 84892479987 scopus 로고    scopus 로고
    • Etude économique prospective de la filière nucléaire. Technical Report, La Documentation française, Paris.
    • Charpin, J.-M., Dessus, B., Pellat, R., 2000. Etude économique prospective de la filière nucléaire. Technical Report, La Documentation française, Paris.
    • (2000)
    • Charpin, J.-M.1    Dessus, B.2    Pellat, R.3
  • 6
    • 84882265684 scopus 로고    scopus 로고
    • Nuclear Safety and Nuclear Economics
    • Technical Report, Vermont Law School.
    • Cooper, M., 2011. Nuclear Safety and Nuclear Economics. Technical Report, Vermont Law School.
    • (2011)
    • Cooper, M.1
  • 7
    • 84892479323 scopus 로고    scopus 로고
    • Court of Audit, Le démantélement des installations nucléaires et la gestion des déchets radioactifs. Technical Report, French Court of Audit.
    • Court of Audit, 2005. Le démantélement des installations nucléaires et la gestion des déchets radioactifs. Technical Report, French Court of Audit.
    • (2005)
  • 8
    • 84892481607 scopus 로고    scopus 로고
    • Court of Audit, The Costs of the Nuclear Power Sector. Technical Report, French Court of Audit.
    • Court of Audit, 2012. The Costs of the Nuclear Power Sector. Technical Report, French Court of Audit.
    • (2012)
  • 9
    • 84892486037 scopus 로고    scopus 로고
    • EIA, Updated Capital Cost Estimates for Utility Scale Electricity Generating Plants. Technical Report, Energy Information Administration.
    • EIA, 2013. Updated Capital Cost Estimates for Utility Scale Electricity Generating Plants. Technical Report, Energy Information Administration.
    • (2013)
  • 10
    • 84892481828 scopus 로고    scopus 로고
    • External Costs, Research Results on Socio-Environmental Damages due to Electricity and Transport.
    • ExternE, 2002. External Costs, Research Results on Socio-Environmental Damages due to Electricity and Transport.
    • (2002)
    • Extern, E.1
  • 11
    • 77953386756 scopus 로고    scopus 로고
    • The costs of the french nuclear scale-up. a case of negative learning by doing
    • Grubler A. The costs of the french nuclear scale-up. a case of negative learning by doing. Energy Policy 2010, 38(9):5174-5188.
    • (2010) Energy Policy , vol.38 , Issue.9 , pp. 5174-5188
    • Grubler, A.1
  • 13
    • 84892477842 scopus 로고    scopus 로고
    • HMT, The Green Book: Appraisal and Evaluation in Central Government. Technical Report, HM Treasury.
    • HMT, 2003. The Green Book: Appraisal and Evaluation in Central Government. Technical Report, HM Treasury.
    • (2003)
  • 14
    • 84892487348 scopus 로고    scopus 로고
    • Nuclear accident liability coverage in the United states
    • International Nuclear Law Association Nuclear Inter Jura 2012.
    • Horin, W. A., 2012. Nuclear accident liability coverage in the United states. In: International Nuclear Law Association Nuclear Inter Jura 2012.
    • (2012)
    • Horin, W.A.1
  • 15
    • 84892481889 scopus 로고    scopus 로고
    • IEA, Projected Costs of Generating Electricity. Technical Report, International Energy Agency.
    • IEA, 2010. Projected Costs of Generating Electricity. Technical Report, International Energy Agency.
    • (2010)
  • 17
    • 34548827780 scopus 로고
    • Fiscal Fission: The Economic Failure of Nuclear Power
    • Technical Report, Greenpeace.
    • Komanoff, C., Roelofs, C., 1992. Fiscal Fission: The Economic Failure of Nuclear Power. Technical Report, Greenpeace.
    • (1992)
    • Komanoff, C.1    Roelofs, C.2
  • 18
    • 34548815274 scopus 로고    scopus 로고
    • A reactor-level analysis of busbar costs for {US} nuclear plants, {1977-2005}
    • Koomey J., Hultman N.E. A reactor-level analysis of busbar costs for {US} nuclear plants, {1977-2005}. Energy Policy 2007, 35(11):5630-5642.
    • (2007) Energy Policy , vol.35 , Issue.11 , pp. 5630-5642
    • Koomey, J.1    Hultman, N.E.2
  • 19
    • 84892485676 scopus 로고    scopus 로고
    • Révision du taux d'actualisation des investissements public. Technical Report, Commissariat général du Plan.
    • Lebegue, D., Hirtzman, P., Baumstark, L., 2005. Révision du taux d'actualisation des investissements public. Technical Report, Commissariat général du Plan.
    • (2005)
    • Lebegue, D.1    Hirtzman, P.2    Baumstark, L.3
  • 20
    • 79955917310 scopus 로고    scopus 로고
    • Historical costs of coal-fired electricity and implications for the future
    • McNerney J., Doyne Farmer J., Trancik J.E. Historical costs of coal-fired electricity and implications for the future. Energy Policy 2011, 39(6):3042-3054.
    • (2011) Energy Policy , vol.39 , Issue.6 , pp. 3042-3054
    • McNerney, J.1    Doyne Farmer, J.2    Trancik, J.E.3
  • 21
    • 84892480930 scopus 로고    scopus 로고
    • MIT, The Future of Nuclear Power. Technical Report, Massachusetts Institute of Technology.
    • MIT, 2009. The Future of Nuclear Power. Technical Report, Massachusetts Institute of Technology.
    • (2009)
  • 22
    • 84892482686 scopus 로고    scopus 로고
    • Munich Re, Costliest Natural Disasters. Technical Report, Munich Re.
    • Munich Re, 2013. Costliest Natural Disasters. Technical Report, Munich Re.
    • (2013)
  • 23
    • 84892481566 scopus 로고    scopus 로고
    • Nuclear Energy Agency, Decommissioning Nuclear Power Plants: Policies, Strategies and Costs. Technical Report, OECD.
    • Nuclear Energy Agency, 2004. Decommissioning Nuclear Power Plants: Policies, Strategies and Costs. Technical Report, OECD.
    • (2004)
  • 24
    • 84892484055 scopus 로고    scopus 로고
    • OMB, Regulatory Analysis. Technical Report, Circular A-4, Office of Management and Budget.
    • OMB, 2003. Regulatory Analysis. Technical Report, Circular A-4, Office of Management and Budget.
    • (2003)
  • 25
    • 84892476973 scopus 로고    scopus 로고
    • L'évaluation socioéconomique des investissements publics. Technical Report, Commissariat général à la stratégie et à la prospective.
    • Quinet, É., 2013. L'évaluation socioéconomique des investissements publics. Technical Report, Commissariat général à la stratégie et à la prospective.
    • (2013)
    • Quinet, E.1
  • 26
    • 84892482031 scopus 로고    scopus 로고
    • Revisiting the Cost Escalation Curse of Nuclear Power New Lessons from the French Experience. Technical Report WP 12-ME-08, MINES ParisTech.
    • Rangel, L.E., Lévêque, F., 2012. Revisiting the Cost Escalation Curse of Nuclear Power New Lessons from the French Experience. Technical Report WP 12-ME-08, MINES ParisTech.
    • (2012)
    • Rangel, L.E.1    Lévêque, F.2
  • 27
    • 84892479015 scopus 로고    scopus 로고
    • Inquiry Commission on the Actual Cost of Electricity
    • Technical Report, French Senate.
    • Senate, F., 2012. Inquiry Commission on the Actual Cost of Electricity. Technical Report, French Senate.
    • (2012)
    • Senate, F.1
  • 28
    • 84892476621 scopus 로고
    • Taux d'intérêt et taux d'actualisation
    • Stoleru L. Taux d'intérêt et taux d'actualisation. Econ. Stat. 1969, 5(1):3-11.
    • (1969) Econ. Stat. , vol.5 , Issue.1 , pp. 3-11
    • Stoleru, L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.