-
1
-
-
84867954072
-
A multi-stage stochastic integer programming approach for capacity expansion under uncertainty
-
Ahmed S, King A, Parija G (2003) A multi-stage stochastic integer programming approach for capacity expansion under uncertainty. J Global Optimiz 26:3-24
-
(2003)
J Global Optimiz
, vol.26
, pp. 3-24
-
-
Ahmed, S.1
King, A.2
Parija, G.3
-
2
-
-
0348128294
-
Object-orientedmodeling and simulation of flexible manufacturing systems: A rule-based procedure
-
Anglani A, Grieco A, Pacella M, Tolio T (2002) Object-orientedmodeling and simulation of flexible manufacturing systems: a rule-based procedure. SimulModel Prac Theory 10(3):209-234
-
(2002)
SimulModel Prac Theory
, vol.10
, Issue.3
, pp. 209-234
-
-
Anglani, A.1
Grieco, A.2
Pacella, M.3
Tolio, T.4
-
4
-
-
62449166141
-
Methodologies and tools to design production systems with focused flexibility
-
Bath, UK, 19-21 September
-
Cantamessa M, Fichera S, Grieco A, Perrone G, Tolio T (2007) Methodologies and tools to design production systems with focused flexibility. Proceedings of the 4th International Conference on Digital Enterprise Technology, Bath, UK, 19-21 September, pp 627-636
-
(2007)
Proceedings of the 4th International Conference on Digital Enterprise Technology
, pp. 627-636
-
-
Cantamessa, M.1
Fichera, S.2
Grieco, A.3
Perrone, G.4
Tolio, T.5
-
5
-
-
21944456471
-
A decomposition method to support the configuration /reconfiguration of production systems
-
Colledani M, Tolio T (2005) A decomposition method to support the configuration /reconfiguration of production systems. Ann CIRP 54(1):441-444
-
(2005)
Ann CIRP
, vol.54
, Issue.1
, pp. 441-444
-
-
Colledani, M.1
Tolio, T.2
-
6
-
-
4344718627
-
Computer aided setup planning for machining centers configuration
-
Contini P, Tolio T (2004) Computer aided setup planning for machining centers configuration. Int J Prod Res, 42(17):3473-3491
-
(2004)
Int J Prod Res
, vol.42
, Issue.17
, pp. 3473-3491
-
-
Contini, P.1
Tolio, T.2
-
7
-
-
0037295930
-
Performance evaluation of continuous production lines with deterministic processing times, multiple failure modes and finite buffer capacity
-
Levantesi R, Matta A, Tolio T (2003) Performance evaluation of continuous production lines with deterministic processing times, multiple failure modes and finite buffer capacity. Performance Evaluation J 51:247-268
-
(2003)
Performance Evaluation J
, vol.51
, pp. 247-268
-
-
Levantesi, R.1
Matta, A.2
Tolio, T.3
-
8
-
-
60349087142
-
A Stochastic approach to the FMS loading problem
-
Terkaj W, Tolio T (2006) A Stochastic approach to the FMS loading problem. CIRP J Manuf Syst 35:481-490
-
(2006)
CIRP J Manuf Syst
, vol.35
, pp. 481-490
-
-
Terkaj, W.1
Tolio, T.2
-
9
-
-
34250179507
-
A rolling horizon approach to plan outsourcing in manufacturing-toorder environments affected by uncertainty
-
Tolio T, Urgo M (2007) A rolling horizon approach to plan outsourcing in manufacturing-toorder environments affected by uncertainty. Ann CIRP 56(1):487-490
-
(2007)
Ann CIRP
, vol.56
, Issue.1
, pp. 487-490
-
-
Tolio, T.1
Urgo, M.2
|