메뉴 건너뛰기




Volumn , Issue , 2013, Pages 862-867

Petri net modeling and one-wafer scheduling of single-arm multi-cluster tools

Author keywords

[No Author keywords available]

Indexed keywords

CLUSTER TOOL; CYCLE TIME; CYCLIC SCHEDULES; CYCLIC SCHEDULING; MULTI-CLUSTER TOOLS; MULTIPLE ROBOT; PETRI NET MODELS;

EID: 84891520091     PISSN: 21618070     EISSN: 21618089     Source Type: Conference Proceeding    
DOI: 10.1109/CoASE.2013.6653915     Document Type: Conference Paper
Times cited : (11)

References (10)
  • 1
    • 41949134365 scopus 로고    scopus 로고
    • Steady-State throughput and scheduling analysis of multi-cluster tools for semiconductor manufacturing: A decomposition approach
    • J. G. Yi, S. W. Ding, D. Z. Song, and M. T. Zhang, "Steady-State Throughput and Scheduling Analysis of Multi-Cluster Tools for Semiconductor Manufacturing: A Decomposition Approach," IEEE Trans. Automat. Sci. Eng., vol. 5, no. 2, pp. 321-336, 2008.
    • (2008) IEEE Trans. Automat. Sci. Eng , vol.5 , Issue.2 , pp. 321-336
    • Yi, J.G.1    Ding, S.W.2    Song, D.Z.3    Zhang, M.T.4
  • 2
    • 0036769403 scopus 로고    scopus 로고
    • On throughtput max-imization in constant travel-time robotic cells
    • M. Dawande, C. Sriskandarajah, and S. Sethi, "On throughtput max-imization in constant travel-time robotic cells," Manuf. Serv. Oper.Manage., vol. 4, no. 4, pp. 296-312, 2002.
    • (2002) Manuf. Serv. Oper.Manage , vol.4 , Issue.4 , pp. 296-312
    • Dawande, M.1    Sriskandarajah, C.2    Sethi, S.3
  • 4
    • 33747443542 scopus 로고    scopus 로고
    • Multicluster tools scheduling: An integrated event graph and network model approach
    • S. W. Ding, J. G. Yi, and M. T. Zhang, "Multicluster Tools Scheduling: an Integrated Event Graph and Network Model Approach," IEEE Trans. Semiconduct. Manufact., vol. 19, no. 3, pp. 339-351, 2006.
    • (2006) IEEE Trans. Semiconduct. Manufact , vol.19 , Issue.3 , pp. 339-351
    • Ding, S.W.1    Yi, J.G.2    Zhang, M.T.3
  • 5
    • 78651098378 scopus 로고    scopus 로고
    • Optimal scheduling of multicluster tools with constant robot moving times, part i: Two-cluster analysis
    • W. K. Chan, J. G. Yi, and S. W. Ding, "Optimal Scheduling of Multicluster Tools with Constant Robot Moving Times, Part I: Two-Cluster Analysis," IEEE Trans. Automat. Sci. Eng., vol. 8, pp. 5-16, 2011.
    • (2011) IEEE Trans. Automat. Sci. Eng , vol.8 , pp. 5-16
    • Chan, W.K.1    Yi, J.G.2    Ding, S.W.3
  • 6
    • 78651094962 scopus 로고    scopus 로고
    • Optimal scheduling of multicluster tools with constant robot moving times, part ii: Tree-like topology configurations
    • W. K. Chan, J. G. Yi, S. W. Ding, and D. Z. Song, "Optimal Scheduling of Multicluster Tools with Constant Robot Moving Times, Part II: Tree-Like Topology Configurations," IEEE Trans. Automat. Sci. Eng., vol. 8, pp. 17-28, 2011.
    • (2011) IEEE Trans. Automat. Sci. Eng , vol.8 , pp. 17-28
    • Chan, W.K.1    Yi, J.G.2    Ding, S.W.3    Song, D.Z.4
  • 7
    • 0038291984 scopus 로고    scopus 로고
    • Systems of multiple cluster tools: Configuration, reliability, and performance
    • Marcel J. Lopez and Samuel C. Wood, "Systems of Multiple Cluster Tools: Configuration, Reliability, and Performance" IEEE Trans. Semiconduct. Manufact., vol. 16, no. 2, pp. 170-178, 2003.
    • (2003) IEEE Trans. Semiconduct. Manufact , vol.16 , Issue.2 , pp. 170-178
    • Lopez, M.J.1    Wood, S.C.2
  • 8
    • 0032141060 scopus 로고    scopus 로고
    • Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems: A petri net approach
    • M. C. Zhou and M. D. Jeng, "Modeling, Analysis, Simulation, Scheduling, and Control of Semiconductor Manufacturing Systems: A Petri Net Approach," IEEE Trans. Semiconduct. Manufact., vol. 11, no. 3, pp. 333-357, 1998.
    • (1998) IEEE Trans. Semiconduct. Manufact , vol.11 , Issue.3 , pp. 333-357
    • Zhou, M.C.1    Jeng, M.D.2
  • 9
    • 0032630279 scopus 로고    scopus 로고
    • Necessary and sufficient conditions for deadlock-free operation in flexible manufacturing systems using a colored petri net model
    • N. Q. Wu, "Necessary and Sufficient Conditions for Deadlock-free Operation in Flexible Manufacturing Systems Using a Colored Petri Net Model," IEEE Trans. Sys., Man, and Cyber., Part C, vol. 29, no. 2, pp. 192-204, 1999.
    • (1999) IEEE Trans. Sys., Man, and Cyber., Part C , vol.29 , Issue.2 , pp. 192-204
    • Wu, N.Q.1
  • 10
    • 43849109024 scopus 로고    scopus 로고
    • A petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
    • N. Q. Wu, C. B. Chu, F. Chu, and M. C. Zhou, "A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints," IEEE Trans. Semiconduct. Manufact., vol. 21, no. 2, pp. 224-237, 2008.
    • (2008) IEEE Trans. Semiconduct. Manufact , vol.21 , Issue.2 , pp. 224-237
    • Wu, N.Q.1    Chu, C.B.2    Chu, F.3    Zhou, M.C.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.