-
2
-
-
84876382434
-
OnEvaluation of alternative switching strategies forenergy-efficient operation of modular factoryautomation systems
-
Krakow, Poland, September
-
S. Mechs, S. Lamparter and J. P. Müller, "OnEvaluation of Alternative Switching Strategies forEnergy-Efficient Operation of Modular FactoryAutomation Systems, " in Proceedings of the 17th IEEEInternational Conference on Emerging Technologies &Factory Automation, Krakow, Poland, September2012.
-
(2012)
Proceedings of the 17th IEEEInternational Conference on Emerging Technologies &Factory Automation
-
-
Mechs, S.1
Lamparter, S.2
Müller, J.P.3
-
3
-
-
84869416560
-
Networked priced timed automata for energy-efficient factory automation
-
Montreal, Canada, June
-
S. Mechs, J. P. Müller, S. Lamparter and J. Peschke,"Networked Priced Timed Automata for Energy-Efficient Factory Automation", in 2012 AmericanControl Conference (ACC 2012), Montreal, Canada,June 2012.
-
(2012)
2012 AmericanControl Conference (ACC 2012)
-
-
Mechs, S.1
Müller, J.P.2
Lamparter, S.3
Peschke, J.4
-
4
-
-
84890768344
-
-
VDI, VDI guideline 4499 Part 1, Digital factoryfundamentals, February 2008
-
VDI, VDI guideline 4499 Part 1, Digital factoryfundamentals, February 2008.
-
-
-
-
5
-
-
77953986583
-
-
2. Auflage Springer
-
S. Vajna, C. Weber, H. Bley, K. Zeman, CAx fürIngenieure, 2. Auflage Springer, 2008.
-
(2008)
CAx FürIngenieure
-
-
Vajna, S.1
Weber, C.2
Bley, H.3
Zeman, K.4
-
8
-
-
71049177457
-
Towards the energy efficient future factory
-
S. Karnouskos, A. W. Colombo, J. L. M Lastra, C.Popescu, "Towards the energy efficient future factory",INDIN 2009, in the 7th IEEE International Conferenceon Industrial Informatics, pp. 367-371, 2009.
-
(2009)
INDin 2009, in the 7th IEEE International Conferenceon Industrial Informatics
, pp. 367-371
-
-
Karnouskos, S.1
Colombo, A.W.2
Lastra, J.L.M.3
Popescu, C.4
-
10
-
-
77954025404
-
Opportunities and challenges tosustainable manufacturing and CMP
-
D. A. Dornfeld. Opportunities and challenges tosustainable manufacturing and CMP MaterialsResearch Society Symposia Proceedings, 1157, pp. 49-55, 2010.
-
(2010)
MaterialsResearch Society Symposia Proceedings
, vol.1157
, pp. 49-55
-
-
Dornfeld, D.A.1
-
12
-
-
84868696619
-
Optimization of machiningprocesses from the perspective of energy consumption: A case study
-
Z. M. Bi, L. Wang, Optimization of machiningprocesses from the perspective of energy consumption:A case study, Journal of Manufacturing Systems, 31,pp. 420-428, 2012.
-
(2012)
Journal of Manufacturing Systems
, vol.31
, pp. 420-428
-
-
Bi, Z.M.1
Wang, L.2
-
13
-
-
84883866970
-
Energyconsumption reduction by machining processimprovement
-
Y. Oda, Y. Kawamura, Fujishima, M. Energyconsumption reduction by machining processimprovement. Procedia CIRP, vol. 4, pp. 120-124,2012.
-
(2012)
Procedia CIRP
, vol.4
, pp. 120-124
-
-
Oda, Y.1
Kawamura, Y.2
Fujishima, M.3
-
14
-
-
77951582514
-
Energyefficiency driven process analysis and optimization indiscrete manufacturing
-
Porto, Portugal, 3-5 November
-
A. Cannata, S. Karnouskos, and M. Taisch, "Energyefficiency driven process analysis and optimization indiscrete manufacturing", in the 35th AnnualConference of the IEEE Industrial Electronics Society(IECON 2009), Porto, Portugal, 3-5 November 2009.
-
(2009)
The 35th AnnualConference of the IEEE Industrial Electronics Society(IECON 2009)
-
-
Cannata, A.1
Karnouskos, S.2
Taisch, M.3
-
15
-
-
84868219986
-
A cross-layerapproach to energy management in manufacturing
-
July
-
A. Florea, J. A. Garcia Izaguirre Montemayor, C.Postelnicu, J. L. Martinez Lastra, "A cross-layerapproach to energy management in manufacturing", inthe 10th IEEE International Conference in IndustrialInformatics (INDIN 2012), pp. 304-308, July 2012.
-
(2012)
Inthe 10th IEEE International Conference in IndustrialInformatics (INDin 2012)
, pp. 304-308
-
-
Florea, A.1
Garcia Izaguirre Montemayor, J.A.2
Postelnicu, C.3
Martinez Lastra, J.L.4
-
16
-
-
84893536492
-
Gekoppelte simulation von material-undenergieflüssen in der automobilproduktion
-
October
-
M. Putz, A. Schlegel, S. Lorenz, E. Franz, S. Schulz,"Gekoppelte Simulation von Material-undEnergieflüssen in der Automobilproduktion", Tage desBetriebs-und Systemingenieurs, October 2011.
-
(2011)
Tage DesBetriebs-Und Systemingenieurs
-
-
Putz, M.1
Schlegel, A.2
Lorenz, S.3
Franz, E.4
Schulz, S.5
-
19
-
-
0028413052
-
A theory of timed automata
-
R. Alur, D. Dill, "A theory of timed automata",Theoritical Computer Science, 126, pp. 183-235, 1994.
-
(1994)
Theoritical Computer Science
, vol.126
, pp. 183-235
-
-
Alur, R.1
Dill, D.2
-
20
-
-
33646030637
-
Priced timed automata: Algorithms andapplications
-
G. Behrmann, K. G. Larsen, and J. I. Rasmussen,"Priced Timed Automata: Algorithms andApplications", International Symposium FormalMethods for Components and Objects (FMCO), pp.162-182, 2006.
-
(2006)
International Symposium FormalMethods for Components and Objects (FMCO)
, pp. 162-182
-
-
Behrmann, G.1
Larsen, K.G.2
Rasmussen, J.I.3
-
21
-
-
33746277588
-
Compatibilitybetween shared variable valuations in timed automatonnetwork model-checking
-
J. Zhao, X. Zhou, X. Li, G. Zheng, Compatibilitybetween shared variable valuations in timed automatonnetwork model-checking, in Proceedings of the 19thIEEE International Parallel and DistributedProcessing Symposium, pp. 1530-2075, 2005.
-
(2005)
Proceedings of the 19thIEEE International Parallel and DistributedProcessing Symposium
, pp. 1530-2075
-
-
Zhao, J.1
Zhou, X.2
Li, X.3
Zheng, G.4
|