![]() |
Volumn 2001-October, Issue , 2001, Pages
|
Isolation of a horizontal hole section in an openhole well using a nondamaging temporary gel plug to facilitate hydrocarbon production from the remaining lateral section - A case history from Kuwait
a b b c d |
Author keywords
[No Author keywords available]
|
Indexed keywords
BOREHOLES;
COILED TUBING;
COST EFFECTIVENESS;
HORIZONTAL WELLS;
HYDROCARBONS;
INFILL DRILLING;
JOB ANALYSIS;
OIL WELL DRILLING;
OIL WELLS;
WELL LOGGING;
WELL TESTING;
COILED-TUBING-CONVEYED PRODUCTION;
COST-EFFECTIVE METHODS;
ECONOMICAL METHODS;
ELECTRIC SUBMERSIBLE PUMPS;
HORIZONTAL SECTION;
HYDROCARBON PRODUCTION;
LOGGING WHILE DRILLING;
SOURCE OF WATERS;
OIL WELL LOGGING;
|
EID: 84888968386
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.2118/72291-ms Document Type: Conference Paper |
Times cited : (8)
|
References (8)
|