메뉴 건너뛰기




Volumn 11, Issue 2, 2013, Pages 231-240

Fault diagnosis for substation with redundant protection configuration based on time-sequence fuzzy petri-net

Author keywords

750kv substation; Fault diagnosis; Redundant knowledge representation; Redundant protection; Time sequence fuzzy petri net

Indexed keywords

ELECTRIC FAULT CURRENTS; FAILURE ANALYSIS; FUZZY NEURAL NETWORKS; FUZZY SYSTEMS; INFORMATION USE; KNOWLEDGE REPRESENTATION; PETRI NETS;

EID: 84888864161     PISSN: 16936930     EISSN: 23029293     Source Type: Journal    
DOI: 10.12928/telkomnika.v11i2.911     Document Type: Article
Times cited : (6)

References (15)
  • 1
    • 39149097210 scopus 로고    scopus 로고
    • Configuration and redundancy of communication networks in digital substations
    • Dou Xiaobo, Hu Minqiang, Wu Zaijun. Configuration and redundancy of communication networks in digital substations. Electric Power Automation Equipment. 2008; 28(1): 38-43.
    • (2008) Electric Power Automation Equipment , vol.28 , Issue.1 , pp. 38-43
    • Xiaobo, D.1    Minqiang, H.2    Zaijun, W.3
  • 2
    • 0142198995 scopus 로고    scopus 로고
    • Online fault diagnosis for power system based on information theory
    • Tang Lei, Sun Hongbin, Zhang Boming. Online fault diagnosis for power system based on information theory. Proceedings of the CSEE. 2003; 27(7): 5-11.
    • (2003) Proceedings of the CSEE , vol.27 , Issue.7 , pp. 5-11
    • Lei, T.1    Hongbin, S.2    Boming, Z.3
  • 3
    • 57449089582 scopus 로고    scopus 로고
    • An analytic model for power network fault diagnosis with the temporal information of alarm message taken into account
    • Guo Wenxin, Liao Zhiwei, Wen Fushuan. An analytic model for power network fault diagnosis with the temporal information of alarm message taken into account. Automation of Electric Power Systems. 2008; 32(22): 26-31.
    • (2008) Automation of Electric Power Systems , vol.32 , Issue.22 , pp. 26-31
    • Wenxin, G.1    Zhiwei, L.2    Fushuan, W.3
  • 4
    • 71949110832 scopus 로고    scopus 로고
    • An analytic model for power system online alarm processing based on temporal constraint network
    • Guo Wenxin, Wen Fushuan, Liao Zhiwei. An analytic model for power system online alarm processing based on temporal constraint network. Automation of Electric Power Systems. 2009; 33(21): 36-43.
    • (2009) Automation of Electric Power Systems , vol.33 , Issue.21 , pp. 36-43
    • Wenxin, G.1    Fushuan, W.2    Zhiwei, L.3
  • 5
    • 77954803780 scopus 로고    scopus 로고
    • Temporal abductive reasoning based diagnosis and alarm for power grid
    • Kang Taifeng, Wu Wenchuan, Zhang Boming. Temporal abductive reasoning based diagnosis and alarm for power grid. Proceedings of the CSEE. 2010; 30(19): 84-90.
    • (2010) Proceedings of the CSEE , vol.30 , Issue.19 , pp. 84-90
    • Taifeng, K.1    Wenchuan, W.2    Boming, Z.3
  • 6
    • 17244363062 scopus 로고    scopus 로고
    • Extended time petri net applied in action logic simulation of protection and automation equipment in DTS
    • Wang Lei, Wan Qiulan. Extended time petri net applied in action logic simulation of protection and automation equipment in DTS. Automation of Electric Power Systems. 2005; 29(6): 71-74.
    • (2005) Automation of Electric Power Systems , vol.29 , Issue.6 , pp. 71-74
    • Lei, W.1    Qiulan, W.2
  • 7
    • 80052274975 scopus 로고    scopus 로고
    • Power system fault diagnosis approach based on time sequence fuzzy Petri net
    • Yang Jianwei, He Zhengyou. Power system fault diagnosis approach based on time sequence fuzzy Petri net. Automation of Electric Power Systems. 2011; 35(15): 46-51.
    • (2011) Automation of Electric Power Systems , vol.35 , Issue.15 , pp. 46-51
    • Jianwei, Y.1    Zhengyou, H.2
  • 8
    • 0033311551 scopus 로고    scopus 로고
    • A methodology for evaluating alarm processing systems using informational entropy based measure and the analytic hierarchy process
    • Kang H G, Seong P H. A methodology for evaluating alarm processing systems using informational entropy based measure and the analytic hierarchy process. IEEE Transactions on Nuclear Science. 1999; 46(6): 2269-2280.
    • (1999) IEEE Transactions on Nuclear Science , vol.46 , Issue.6 , pp. 2269-2280
    • Kang, H.G.1    Seong, P.H.2
  • 11
    • 42249092802 scopus 로고    scopus 로고
    • Implementing fuzzy reasoning Petri-nets for fault section estimation
    • Xu Luo, Mladen Kezunovic. Implementing fuzzy reasoning Petri-nets for fault section estimation. IEEE Transactions on power delivery. 2008; 2(23): 676-685.
    • (2008) IEEE Transactions on power delivery , vol.2 , Issue.23 , pp. 676-685
    • Luo, X.1    Kezunovic, M.2
  • 15
    • 77956991669 scopus 로고    scopus 로고
    • An analytic model-based approach for power system alarm processing employing temporal constraint network
    • Wenxin Guo, Fushuan Wen, Zhiwei Liao. An analytic model-based approach for power system alarm processing employing temporal constraint network. IEEE Transactions on Power Delivery. 2010; 25(4): 2435-2447.
    • (2010) IEEE Transactions on Power Delivery , vol.25 , Issue.4 , pp. 2435-2447
    • Guo, W.1    Wen, F.2    Liao, Z.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.