메뉴 건너뛰기




Volumn 1, Issue 2, 2002, Pages 125-150

Part I – Towards an OPIM system: manufacturing SME organisation for the future

Author keywords

factory models flow through product; global manufacturing; manufacturing SME; One Product Integrated Manufacturing (OPIM); OPIM institutionalisation; organisation; telematics technologies; virtual enterprise; virtual enterprise institutionalisation

Indexed keywords


EID: 84888778029     PISSN: 14709503     EISSN: None     Source Type: Journal    
DOI: 10.1504/IJNVO.2002.002542     Document Type: Article
Times cited : (5)

References (32)
  • 3
    • 84952954190 scopus 로고
    • Assessing determinants of BPR implementation success
    • Tennessee Technological University
    • Guimaraes, T. (1994) ‘Assessing determinants of BPR implementation success’, Institute for Technology Management, Tennessee Technological University.
    • (1994) Institute for Technology Management
    • Guimaraes, T.1
  • 5
    • 84952956568 scopus 로고    scopus 로고
    • We adopt the description from [4] as a metaphor for a target manufacturing system specification, repeating it in various situations. Adoption of this description is due to its expression ‘density’ which, may be the best way to describe the performance of the target ‘future’ manufacturing system
    • We adopt the description from [4] as a metaphor for a target manufacturing system specification, repeating it in various situations. Adoption of this description is due to its expression ‘density’ which, may be the best way to describe the performance of the target ‘future’ manufacturing system.
  • 8
    • 84898226642 scopus 로고    scopus 로고
    • Part II – Towards an OPIM system: results of the OPIM system design simulation and an applicability analysis
    • Putnik, G. and Avila, P. (2003) ‘Part II – Towards an OPIM system: results of the OPIM system design simulation and an applicability analysis’, Int. J. of Networking and Virtual Organisations, Vol. 1, No. 2, pp.151–169.
    • (2003) Int. J. of Networking and Virtual Organisations , vol.1 , Issue.2 , pp. 151-169
    • Putnik, G.1    Avila, P.2
  • 10
    • 0027289930 scopus 로고
    • Development of a virtual manufacturing system by integrating product models and factory models
    • Onosata, M. and Iwata, K. (1993) ‘Development of a virtual manufacturing system by integrating product models and factory models’, Annals of the CIRP, Vol. 42, No. 1, pp.475–478.
    • (1993) Annals of the CIRP , vol.42 , Issue.1 , pp. 475-478
    • Onosata, M.1    Iwata, K.2
  • 13
    • 0002478039 scopus 로고
    • The emerging theory of manufacturing
    • Drucker, P. (1990) ‘The emerging theory of manufacturing’, Harvard Business Review, May–June, p.94.
    • (1990) Harvard Business Review , vol.May–June , pp. 94
    • Drucker, P.1
  • 14
    • 0343711254 scopus 로고
    • The extended enterprise – manufacturing and the value chain
    • L.M. Camarinha-Matos and H. Afsarmanesh (Eds.) Chapman & Hall
    • Browne, J. (1995) ‘The extended enterprise – manufacturing and the value chain’, in L.M. Camarinha-Matos and H. Afsarmanesh (Eds.) Balanced Automation Systems – Architectures and Design Methods, Proceedings of BASYS’95, Chapman & Hall, pp.5–16.
    • (1995) Balanced Automation Systems – Architectures and Design Methods, Proceedings of BASYS’95 , pp. 5-16
    • Browne, J.1
  • 16
    • 0028747692 scopus 로고
    • Agile manufacturing
    • American Production and Inventory Control Society, San Diego
    • Hormozi, A.M. (1994) ‘Agile manufacturing’, in 37th International Conference Proceedings, American Production and Inventory Control Society, San Diego.
    • (1994) 37th International Conference Proceedings
    • Hormozi, A.M.1
  • 17
    • 84952962229 scopus 로고
    • Future competitiveness of European industries through applied research
    • Technotron S.A, Lisboa
    • Warnecke, H.J. (1994) ‘Future competitiveness of European industries through applied research’, Workshop Production Management Optimization in Real Time, Technotron S.A, Lisboa.
    • (1994) Workshop Production Management Optimization in Real Time
    • Warnecke, H.J.1
  • 20
    • 84952969264 scopus 로고    scopus 로고
    • Detailed presentation of the simulation performed is given in [8]
    • Detailed presentation of the simulation performed is given in [8].
  • 21
    • 84952961443 scopus 로고    scopus 로고
    • The OPIM system concept development is under research within the broader project ‘Virtual Enterprises (VE)/OPIM system design and control’ in the Production Systems Engineering Center, University of Minho (under the responsibility of the author). In that sense in the following text we will refer not only to OPIM institutionalisation but VE/OPIM institutionalisation, which is, in fact, on the general level, equal
    • The OPIM system concept development is under research within the broader project ‘Virtual Enterprises (VE)/OPIM system design and control’ in the Production Systems Engineering Center, University of Minho (under the responsibility of the author). In that sense in the following text we will refer not only to OPIM institutionalisation but VE/OPIM institutionalisation, which is, in fact, on the general level, equal.
  • 23
    • 0029231988 scopus 로고
    • A modelling and simulation architecture for virtual manufacturing system
    • Iwata, K., Onosata, M., Teramoto, K. and Osaki, S. (1995) ‘A modelling and simulation architecture for virtual manufacturing system’, Annals of the CIRP, Vol. 44, No. 1, pp.399–402.
    • (1995) Annals of the CIRP , vol.44 , Issue.1 , pp. 399-402
    • Iwata, K.1    Onosata, M.2    Teramoto, K.3    Osaki, S.4
  • 28
    • 0342841963 scopus 로고
    • CIM and one of a kind production
    • G. Doumeingts, J. Browne and M. Tomljanovich (Eds.) Elsevier Science Publ. B.V.
    • Rolstadas, A. (1991) ‘CIM and one of a kind production’, in G. Doumeingts, J. Browne and M. Tomljanovich (Eds.) Computer Applications in Production and Engineering: Integration Aspects, Elsevier Science Publ. B.V.
    • (1991) Computer Applications in Production and Engineering: Integration Aspects
    • Rolstadas, A.1
  • 29
    • 0001221156 scopus 로고
    • The focused factory
    • Skinner, W. (1974) ‘The focused factory’, Harvard Business Review, May–June, pp.113–121.
    • (1974) Harvard Business Review , vol.May–June , pp. 113-121
    • Skinner, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.