메뉴 건너뛰기




Volumn 32, Issue 4, 2013, Pages 764-770

Optimizing a bi-objective multi-product EPQ model with defective items, rework and limited orders: NSGA-II and MOPSO algorithms

Author keywords

Imperfect items; MOPSO; Multi objective model; Multi product EPQ; NSGA II; Re workable items

Indexed keywords

IMPERFECT ITEMS; MOPSO; MULTI-OBJECTIVE MODELING; MULTI-PRODUCTS; NSGA-II; RE-WORKABLE ITEMS;

EID: 84888330449     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jmsy.2013.08.001     Document Type: Article
Times cited : (41)

References (19)
  • 1
    • 0000356787 scopus 로고
    • How many parts to make at once
    • F.W. Harris How many parts to make at once Factory, The Mag Manage 10 152 1913 135 136
    • (1913) Factory, the Mag Manage , vol.10 , Issue.152 , pp. 135-136
    • Harris, F.W.1
  • 2
    • 0037740269 scopus 로고
    • The most economical production lot
    • E.W. Taft The most economical production lot The Iron Age 101 1918 1410 1412
    • (1918) The Iron Age , vol.101 , pp. 1410-1412
    • Taft, E.W.1
  • 3
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • P.A. Hayek, and M.K. Salameh Production lot sizing with the reworking of imperfect quality items produced Prod Plann Control 12 2001 584 590
    • (2001) Prod Plann Control , vol.12 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 4
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • M.J. Rosenblatt, and H.L. Lee Economic production cycles with imperfect production processes IIE Trans 18 1986 48 55
    • (1986) IIE Trans , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 5
    • 0032991947 scopus 로고    scopus 로고
    • Integrated production-inventory models with imperfect production processes and a limited capacity for raw materials
    • C.S. Lin Integrated production-inventory models with imperfect production processes and a limited capacity for raw materials Math Comput Modell 29 1999 81 89
    • (1999) Math Comput Modell , vol.29 , pp. 81-89
    • Lin, C.S.1
  • 6
    • 0032761507 scopus 로고    scopus 로고
    • An optimal production run length in deteriorating production processes
    • C.H. Kim, and Y. Hong An optimal production run length in deteriorating production processes Int J Prod Econom 58 1999 183 189
    • (1999) Int J Prod Econom , vol.58 , pp. 183-189
    • Kim, C.H.1    Hong, Y.2
  • 7
    • 33749665095 scopus 로고    scopus 로고
    • An EPQ model with setup cost and process quality as functions of capital expenditure
    • K.L. Hou An EPQ model with setup cost and process quality as functions of capital expenditure Appl Math Modell 31 2007 10 17
    • (2007) Appl Math Modell , vol.31 , pp. 10-17
    • Hou, K.L.1
  • 8
    • 33846655633 scopus 로고    scopus 로고
    • Determining the optimal run time for EPQ model with scrap, rework and stochastic breakdowns
    • S.W. Chiu, S.L. Wang, and Y.S.P. Chiu Determining the optimal run time for EPQ model with scrap, rework and stochastic breakdowns Eur J Oper Res 180 2007 664 676
    • (2007) Eur J Oper Res , vol.180 , pp. 664-676
    • Chiu, S.W.1    Wang, S.L.2    Chiu, Y.S.P.3
  • 9
    • 0033874992 scopus 로고    scopus 로고
    • Economic production order quantity model for items with imperfect quality
    • M.K. Salameh, and M.Y. Jaber Economic production order quantity model for items with imperfect quality Int J Prod Econom 64 2000 59 64
    • (2000) Int J Prod Econom , vol.64 , pp. 59-64
    • Salameh, M.K.1    Jaber, M.Y.2
  • 10
    • 84888331043 scopus 로고    scopus 로고
    • A mathematical model on EPQ for stochastic demand in an imperfect production system
    • B. Pal, S.S. Sana, and K. Chaudhuri A mathematical model on EPQ for stochastic demand in an imperfect production system J Manufact Syst 32 2013 260 270
    • (2013) J Manufact Syst , vol.32 , pp. 260-270
    • Pal, B.1    Sana, S.S.2    Chaudhuri, K.3
  • 11
    • 84877325249 scopus 로고    scopus 로고
    • An optimal production and inspection strategy with preventive maintenance error and rework
    • Y.C. Chen An optimal production and inspection strategy with preventive maintenance error and rework J Manufact Syst 32 2013 99 106
    • (2013) J Manufact Syst , vol.32 , pp. 99-106
    • Chen, Y.C.1
  • 12
    • 84858333711 scopus 로고    scopus 로고
    • A multi-objective electromagnetism algorithm for a bi-objective flowshop scheduling problem
    • M. Khalili, and R. Tavakkoli-Moghaddam A multi-objective electromagnetism algorithm for a bi-objective flowshop scheduling problem J Manufact Syst 31 2012 232 239
    • (2012) J Manufact Syst , vol.31 , pp. 232-239
    • Khalili, M.1    Tavakkoli-Moghaddam, R.2
  • 13
    • 78651329677 scopus 로고    scopus 로고
    • A new integrated mathematical model for a bi-objective multi-depot location-routing problem solved by a multi-objective scatter search algorithm
    • R. Tavakkoli-Moghaddam, A. Makui, and Z. Mazloomi A new integrated mathematical model for a bi-objective multi-depot location-routing problem solved by a multi-objective scatter search algorithm J Manufact Syst 29 2010 111 119
    • (2010) J Manufact Syst , vol.29 , pp. 111-119
    • Tavakkoli-Moghaddam, R.1    Makui, A.2    Mazloomi, Z.3
  • 17
    • 3142756516 scopus 로고    scopus 로고
    • Handling multiple objectives with particle swarm optimization
    • C.A.C. Coello, G.T. Pulido, and M.S. Lechuga Handling multiple objectives with particle swarm optimization IEEE Trans Evol Comput 8 2004 256 279
    • (2004) IEEE Trans Evol Comput , vol.8 , pp. 256-279
    • Coello, C.A.C.1    Pulido, G.T.2    Lechuga, M.S.3
  • 18
    • 0000852513 scopus 로고
    • Multi objective optimization using non-dominated sorting in genetic algorithms
    • N. Srinivas, and K. Deb Multi objective optimization using non-dominated sorting in genetic algorithms Evol Comput 2 1994 221 248
    • (1994) Evol Comput , vol.2 , pp. 221-248
    • Srinivas, N.1    Deb, K.2
  • 19
    • 0036530772 scopus 로고    scopus 로고
    • A Fast and elitist multi objective genetic algorithm: NSGA-II
    • K. Deb, A. Pratap, and S. Agarwal A Fast and elitist multi objective genetic algorithm: NSGA-II IEEE Trans Evol Comput 2 2002 182 197
    • (2002) IEEE Trans Evol Comput , vol.2 , pp. 182-197
    • Deb, K.1    Pratap, A.2    Agarwal, S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.