메뉴 건너뛰기




Volumn 398, Issue PART 2, 2013, Pages 208-215

Towards an harmonious and integrated management approach for lifecycle planning

Author keywords

Closed loop PLM; Concurrent engineering; Integrated design; Lifecycle planning; Product lifecycle management

Indexed keywords

CLOSED-LOOP; INDUSTRIAL REQUIREMENTS; INTEGRATED DESIGNS; INTEGRATED MANAGEMENT; INTEGRATED MANAGEMENT APPROACHES; LIFE-CYCLE ENGINEERING; MAINTENANCE PLANNING; PRODUCT LIFE CYCLE MANAGEMENT;

EID: 84887936809     PISSN: 18684238     EISSN: None     Source Type: Book Series    
DOI: 10.1007/978-3-642-40361-3_27     Document Type: Conference Paper
Times cited : (2)

References (7)
  • 2
    • 84860869045 scopus 로고    scopus 로고
    • A mereotopological product relationship description approach for assembly oriented design
    • Demoly, F., Matsokis, A., Kiritsis, D.: A mereotopological product relationship description approach for assembly oriented design. Robotics and Computer-Integrated Manufacturing 28(1), 681-693 (2012).
    • (2012) Robotics and Computer-Integrated Manufacturing , vol.28 , Issue.1 , pp. 681-693
    • Demoly, F.1    Matsokis, A.2    Kiritsis, D.3
  • 3
    • 78049277610 scopus 로고    scopus 로고
    • An Assembly oriented design framework for product structure engineering and assembly sequence planning
    • Demoly, F., Yan, X.-T., Eynard, B., Rivest, L., Gomes, S.: An Assembly oriented design framework for product structure engineering and assembly sequence planning. Robotics and Computer-Integrated Manufacturing 27(1), 33-46 (2011).
    • (2011) Robotics and Computer-Integrated Manufacturing , vol.27 , Issue.1 , pp. 33-46
    • Demoly, F.1    Yan, X.-T.2    Eynard, B.3    Rivest, L.4    Gomes, S.5
  • 4
    • 84862252003 scopus 로고    scopus 로고
    • Integrated product relationships management: A model to enable concurrent product design and assembly sequence planning
    • Demoly, F., Yan, X.-T., Eynard, B., Kiritsis, D., Gomes, S.: Integrated product relationships management: a model to enable concurrent product design and assembly sequence planning. Journal of Engineering Design 23(7), 544-561 (2012).
    • (2012) Journal of Engineering Design , vol.23 , Issue.7 , pp. 544-561
    • Demoly, F.1    Yan, X.-T.2    Eynard, B.3    Kiritsis, D.4    Gomes, S.5
  • 5
    • 80054117570 scopus 로고    scopus 로고
    • Geometric skeleton computation enabling concurrent product engineering and assembly sequence planning
    • Demoly, F., Toussaint, L., Eynard, B., Kiritsis, D., Gomes, S.: Geometric skeleton computation enabling concurrent product engineering and assembly sequence planning. Computer-Aided Design 43(12), 1654-1673 (2011).
    • (2011) Computer-Aided Design , vol.43 , Issue.12 , pp. 1654-1673
    • Demoly, F.1    Toussaint, L.2    Eynard, B.3    Kiritsis, D.4    Gomes, S.5
  • 6
    • 51249141938 scopus 로고    scopus 로고
    • Supporting early design decision making using design context knowledge
    • Rehman, F. U., Yan, X. T.: Supporting early design decision making using design context knowledge. Journal of Design Research 6(1-2), 169-189 (2007).
    • (2007) Journal of Design Research , vol.6 , Issue.1-2 , pp. 169-189
    • Rehman, F.U.1    Yan, X.T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.