Volumn 63, Issue , 2013, Pages 215-223
|
Improved cost-benefit analysis for market-based transmission planning, a European perspective
|
Author keywords
Cost benefit analysis; Future electric power systems; Uncertain transmission planning
|
Indexed keywords
FUTURE GENERATIONS;
HEURISTIC ANALYSIS;
HEURISTIC APPROACH;
MARKET-BASED TRANSMISSIONS;
NETWORK REINFORCEMENTS;
SOCIAL WELFARE MAXIMIZATION;
TRANSMISSION PLANNING;
UNCERTAIN ENVIRONMENTS;
COST BENEFIT ANALYSIS;
DECISION MAKING;
ELECTRIC POWER SYSTEM INTERCONNECTION;
ELECTRIC POWER TRANSMISSION NETWORKS;
ENERGY POLICY;
HEURISTIC METHODS;
UNCERTAINTY ANALYSIS;
PLANNING;
COST-BENEFIT ANALYSIS;
ELECTRICAL POWER;
ELECTRICITY GENERATION;
ENERGY PLANNING;
ENERGY POLICY;
PRODUCTION COST;
EUROPE;
|
EID: 84887155514
PISSN: 03014215
EISSN: None
Source Type: Journal
DOI: 10.1016/j.enpol.2013.08.066 Document Type: Article |
Times cited : (6)
|
References (15)
|