Volumn 50, Issue 4, 2013, Pages 24-29

Informational early warning platform for tunnel construction

Author keywords

Dynamic virtualization by network; Four color warning; Informational construction; Linkage response; Tunnel

Indexed keywords

COMPLEX CONDITION; DYNAMIC VIRTUALIZATION; EARLY WARNING; FOUR-COLOR WARNING; INFORMATIONAL CONSTRUCTION; LINKAGE RESPONSE; TUNNEL CONSTRUCTION; UNCERTAINTY AND RISKS;

EID: 84886616231     PISSN: 10096582     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (5)

References (10)
  • 4
    • 10644224889 scopus 로고
    • The squeezing potential of rock around tunnel, theory and prediction
    • Aydama, Kgit, Kawamoto T. The squeezing potential of rock around tunnel, theory and prediction [J]. Rock Mechanics and Rock Engineering Geology, 1993, 26 (1): 21-23
    • (1993) Rock Mechanics and Rock Engineering Geology , vol.26 , Issue.1 , pp. 21-23
    • Aydama1    Kgit2    Kawamoto, T.3
  • 5
    • 84886629357 scopus 로고    scopus 로고
    • Design of disaster-preventing and alarm system for water gushing and mud outbursting complex Karst tunnels
    • Hu Ziping. Design of disaster-preventing and alarm system for water gushing and mud outbursting complex Karst tunnels [J]. Modern Tunnelling Technology, 44 (6): 48-54
    • Modern Tunnelling Technology , vol.44 , Issue.6 , pp. 48-54
    • Hu, Z.1
  • 6
    • 66149142510 scopus 로고    scopus 로고
    • Research of distributed data acquisition and transmission system for long tunnel and mine excavation
    • Liang Xiangyi, Zhao Junhua. Research of distributed data acquisition and transmission system for long tunnel and mine excavation [J]. Engineering Journal of Wuhan University, 2007, 40 (4): 117-120
    • (2007) Engineering Journal of Wuhan University , vol.40 , Issue.4 , pp. 117-120
    • Liang, X.1    Zhao, J.2
  • 7
    • 66149131852 scopus 로고    scopus 로고
    • Tunnel construction multivariate information forewarning and safety management system research
    • Ye Ying, Mu Qianxiang, Zhang Chengping. Tunnel construction multivariate information forewarning and safety management system research [J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28 (5): 900-907
    • (2009) Chinese Journal of Rock Mechanics and Engineering , vol.28 , Issue.5 , pp. 900-907
    • Ye, Y.1    Mu, Q.2    Zhang, C.3
  • 8
    • 84886635932 scopus 로고    scopus 로고
    • Study on tunnel construction personnel remote real time positioning and safety management
    • Ye Ying, Sun Wenlong, Wang Yihai, Gu Wenyuan, Hu Jianhua, Yang Xinrui. Study on tunnel construction personnel remote real time positioning and safety management [J]. Modern Tunnelling Technology, 2009, 46 (2): 63-67
    • (2009) Modern Tunnelling Technology , vol.46 , Issue.2 , pp. 63-67
    • Ye, Y.1    Sun, W.2    Wang, Y.3    Gu, W.4    Hu, J.5    Yang, X.6
  • 9
    • 84886625458 scopus 로고    scopus 로고
    • Technique problems need to be solved urgently in current railway tunnel construction
    • Ma Hui, Liu Renzhi, Chen Shougen, Gao Mingzhong. Technique problems need to be solved urgently in current railway tunnel construction [J]. Modern Tunnelling Technology, 2011, 48 (5): 1-6
    • (2011) Modern Tunnelling Technology , vol.48 , Issue.5 , pp. 1-6
    • Ma, H.1    Liu, R.2    Chen, S.3    Gao, M.4
  • 10
    • 84886604640 scopus 로고    scopus 로고
    • Ground surface settlement law of a shallow-depth subway station under complex conditions
    • Song Jian, Fan Yunyun, Huo Yanpeng. Ground surface settlement law of a shallow-depth subway station under complex conditions [J]. Modern Tunnelling Technology, 2012, 49 (6): 88-92
    • (2012) Modern Tunnelling Technology , vol.49 , Issue.6 , pp. 88-92
    • Song, J.1    Fan, Y.2    Huo, Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.