메뉴 건너뛰기




Volumn , Issue , 2013, Pages 1392-1395

The application of BIM in the completion phase

Author keywords

BIM; Built drawing; Completion model with BIM; the completion of settlement

Indexed keywords

BIM; BIM TECHNOLOGIES; DESIGN AND CONSTRUCTION; THE COMPLETION OF SETTLEMENT;

EID: 84886516070     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICDMA.2013.332     Document Type: Conference Paper
Times cited : (2)

References (6)
  • 3
    • 62649089794 scopus 로고    scopus 로고
    • BIM-based indoor-emergency- navigation-system for complex buildings
    • in Chinese
    • Uwe Rueppel, Kai Marcus Stuebbe, "BIM-Based Indoor-Emergency- Navigation-System for Complex Buildings" TSINGHUA SCIENCE AND TECHNOLOGY, 2008, 13, pp 362-267. (in Chinese).
    • (2008) TSINGHUA SCIENCE and TECHNOLOGY , vol.13 , pp. 267-362
    • Rueppel, U.1    Stuebbe, K.M.2
  • 4
    • 84886489268 scopus 로고    scopus 로고
    • 4D simulation of real-time construction based on BIM
    • in Chinese
    • Wang Xueqin, Zhang Kangxi, Xie Yin, "4D simulation of real-time construction based on BIM", Journal of Guangxi University: Nat Sci Ed, Vol.37 (4), 814-819.(in Chinese).
    • Journal of Guangxi University: Nat Sci Ed , vol.37 , Issue.4 , pp. 814-819
    • Wang, X.1    Zhang, K.2    Xie, Y.3
  • 5
    • 84886519753 scopus 로고    scopus 로고
    • BIM in Shanghai center tower
    • in Chinese
    • Che Jiliang, Zhang Dongsheng, "BIM in Shanghai Center Tower", Architecture Technique, pp 104-107. (in Chinese).
    • Architecture Technique , pp. 104-107
    • Che, J.1    Zhang, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.