-
1
-
-
0035337666
-
VAr planning using genetic algorithm and linear programming
-
May
-
J. Mantovani, S. Modesto, and A. Garcia, "VAr planning using genetic algorithm and linear programming," Proc. Inst. Elect. Eng., Gen., Transm., Distrib., vol. 148, no. 3, pp. 257-262, May 2001.
-
(2001)
Proc. Inst. Elect. Eng., Gen., Transm., Distrib.
, vol.148
, Issue.3
, pp. 257-262
-
-
Mantovani, J.1
Modesto, S.2
Garcia, A.3
-
3
-
-
84962262699
-
A reactive power resource planning method by tabu search in competitive markets
-
K. Nara and H. Hu, "A reactive power resource planning method by tabu search in competitive markets," in Proc. Int. Conf. Power System Technology, 2000 (PowerCon 2000), 2000, vol. 2, pp. 1089-1094.
-
Proc. Int. Conf. Power System Technology, 2000 (PowerCon 2000), 2000
, vol.2
, pp. 1089-1094
-
-
Nara, K.1
Hu, H.2
-
4
-
-
62949102753
-
Adaptive particle swarm optimization approach for optimal reactive power planning
-
P. Rajkumar and D. Devaraj, "Adaptive particle swarm optimization approach for optimal reactive power planning," in Proc. Joint Int. Conf. Power System Technology and IEEE Power India Conf., 2008 (POWERCON 2008), Oct. 2008, pp. 1-7.
-
Proc. Joint Int. Conf. Power System Technology and IEEE Power India Conf., 2008 (POWERCON 2008), Oct. 2008
, pp. 1-7
-
-
Rajkumar, P.1
Devaraj, D.2
-
5
-
-
50249185698
-
A multiple scenario security constrained reactive power planning tool using EPSO
-
H. Keko, A. Duque, and V. Miranda, "A multiple scenario security constrained reactive power planning tool using EPSO," in Proc. Int. Conf. Intelligent Systems Applications to Power Systems, 2007 (ISAP 2007), Nov. 2007, pp. 1-6.
-
Proc. Int. Conf. Intelligent Systems Applications to Power Systems, 2007 (ISAP 2007), Nov. 2007
, pp. 1-6
-
-
Keko, H.1
Duque, A.2
Miranda, V.3
-
6
-
-
34548812311
-
An investigation of reactive power planning based on chance constrained programming
-
N. Yang, C. Yu, F. Wen, and C. Chung, "An investigation of reactive power planning based on chance constrained programming," Int. J. Elect. Power Energy Syst., vol. 29, no. 9, pp. 650-656, 2007.
-
(2007)
Int. J. Elect. Power Energy Syst.
, vol.29
, Issue.9
, pp. 650-656
-
-
Yang, N.1
Yu, C.2
Wen, F.3
Chung, C.4
-
7
-
-
0030084668
-
A heuristic method for reactive power planning
-
Feb.
-
J. Mantovani and A. Garcia, "A heuristic method for reactive power planning," IEEE Trans. Power Syst., vol. 11, no. 1, pp. 68-74, Feb. 1996.
-
(1996)
IEEE Trans. Power Syst.
, vol.11
, Issue.1
, pp. 68-74
-
-
Mantovani, J.1
Garcia, A.2
-
8
-
-
0034243086
-
Optimal capacitor placement using deterministic and genetic algorithms
-
Aug.
-
M. Delfanti, G. Granelli, P. Marannino, and M. Montagna, "Optimal capacitor placement using deterministic and genetic algorithms," IEEE Trans. Power Syst., vol. 15, no. 3, pp. 1041-1046, Aug. 2000.
-
(2000)
IEEE Trans. Power Syst.
, vol.15
, Issue.3
, pp. 1041-1046
-
-
Delfanti, M.1
Granelli, G.2
Marannino, P.3
Montagna, M.4
-
9
-
-
0032684216
-
Optimal reactive power planning against voltage collapse using the successive multiobjective fuzzy LP technique
-
Jul.
-
B. Venkatesh, G. Sadasivam, and M. Khan, "Optimal reactive power planning against voltage collapse using the successive multiobjective fuzzy LP technique," Proc. Inst. Elect. Eng., Gen., Transm., Distrib., vol. 146, no. 4, pp. 343-348, Jul. 1999.
-
(1999)
Proc. Inst. Elect. Eng., Gen., Transm., Distrib.
, vol.146
, Issue.4
, pp. 343-348
-
-
Venkatesh, B.1
Sadasivam, G.2
Khan, M.3
-
10
-
-
0024668282
-
Large-scale optimal power flow: Effects of initialization, decoupling and discretization
-
May
-
A. Papalexopoulos, C. Imparato, and F. Wu, "Large-scale optimal power flow: Effects of initialization, decoupling and discretization," IEEE Trans. Power Syst., vol. 4, no. 2, pp. 748-759, May 1989.
-
(1989)
IEEE Trans. Power Syst.
, vol.4
, Issue.2
, pp. 748-759
-
-
Papalexopoulos, A.1
Imparato, C.2
Wu, F.3
-
11
-
-
84963505936
-
Optimal operation and allocation of reactive power resource considering static voltage stability
-
vol. 2
-
B. Kermanshahi, K. Takahashi, and Y. Zhou, "Optimal operation and allocation of reactive power resource considering static voltage stability," in Proc. 1998 Int. Conf. Power System Technology, 1998 (POWERCON' 98), Aug. 1998, vol. 2, pp. 1473-1477, vol. 2.
-
Proc. 1998 Int. Conf. Power System Technology, 1998 (POWERCON' 98), Aug. 1998
, vol.2
, pp. 1473-1477
-
-
Kermanshahi, B.1
Takahashi, K.2
Zhou, Y.3
-
12
-
-
0026104975
-
A method to compute reactive power margins with respect to voltage collapse
-
Feb.
-
T. Van Cutsem, "A method to compute reactive power margins with respect to voltage collapse," IEEE Trans. Power Syst., vol. 6, no. 1, pp. 145-156, Feb. 1991.
-
(1991)
IEEE Trans. Power Syst.
, vol.6
, Issue.1
, pp. 145-156
-
-
Van Cutsem, T.1
-
13
-
-
0024000838
-
An integrated methodology for var sources planning
-
May
-
S. Granville, M. Pereira, and A. Monticelli, "An integrated methodology for var sources planning," IEEE Trans. Power Syst., vol. 3, no. 2, pp. 549-557, May 1988.
-
(1988)
IEEE Trans. Power Syst.
, vol.3
, Issue.2
, pp. 549-557
-
-
Granville, S.1
Pereira, M.2
Monticelli, A.3
-
14
-
-
0024104421
-
Optimal var planning by approximation method for recursivemixed-integer linear programming
-
Nov.
-
K. Aoki, M. Fan, and A. Nishikori, "Optimal var planning by approximation method for recursivemixed-integer linear programming," IEEE Trans. Power Syst., vol. 3, no. 4, pp. 1741-1747, Nov. 1988.
-
(1988)
IEEE Trans. Power Syst.
, vol.3
, Issue.4
, pp. 1741-1747
-
-
Aoki, K.1
Fan, M.2
Nishikori, A.3
-
15
-
-
0027306375
-
Optimal long-term reactive power planning using decomposition techniques
-
M. K. Mangoli, K. Y. Lee, and Y. M. Park, "Optimal long-term reactive power planning using decomposition techniques," Elect. Power Syst. Res., vol. 26, no. 1, pp. 41-52, 1993.
-
(1993)
Elect. Power Syst. Res.
, vol.26
, Issue.1
, pp. 41-52
-
-
Mangoli, M.K.1
Lee, K.Y.2
Park, Y.M.3
-
16
-
-
0026203985
-
A security-constrained decomposition approach to optimal reactive power planning
-
Aug.
-
T. Gómez, I. Pérez-Arriaga, J. Lumbreras, and V. Parra, "A security-constrained decomposition approach to optimal reactive power planning," IEEE Trans. Power Syst., vol. 6, no. 3, pp. 1069-1076, Aug. 1991.
-
(1991)
IEEE Trans. Power Syst.
, vol.6
, Issue.3
, pp. 1069-1076
-
-
Gómez, T.1
Pérez-Arriaga, I.2
Lumbreras, J.3
Parra, V.4
-
17
-
-
0024001583
-
Practical reactive power allocation/operation planning using successive linear programming
-
May
-
K. Iba, H. Suzuki, K.-I. Suzuki, and K. Suzuki, "Practical reactive power allocation/operation planning using successive linear programming," IEEE Trans. Power Syst., vol. 3, no. 2, pp. 558-566, May 1988.
-
(1988)
IEEE Trans. Power Syst.
, vol.3
, Issue.2
, pp. 558-566
-
-
Iba, K.1
Suzuki, H.2
Suzuki, K.-I.3
Suzuki, K.4
-
18
-
-
0027697295
-
Cross decomposition for multi-area optimal reactive power planning
-
Nov.
-
N. Deeb and S. Shahidehpour, "Cross decomposition for multi-area optimal reactive power planning," IEEE Trans. Power Syst., vol. 8, no. 4, pp. 1539-1544, Nov. 1993.
-
(1993)
IEEE Trans. Power Syst.
, vol.8
, Issue.4
, pp. 1539-1544
-
-
Deeb, N.1
Shahidehpour, S.2
-
19
-
-
0018294903
-
A two-stage approach to solving large-scale optimal power flows
-
F. F. Wu, G. Gross, J. Luini, and P. M. Look, "A two-stage approach to solving large-scale optimal power flows," in Proc. IEEE Conf. Power Industry Computer Applications, 1979 (PICA-79), May 1979, pp. 126-136.
-
Proc. IEEE Conf. Power Industry Computer Applications, 1979 (PICA-79), May 1979
, pp. 126-136
-
-
Wu, F.F.1
Gross, G.2
Luini, J.3
Look, P.M.4
-
20
-
-
0026927060
-
Efficient identification of binding inequality constraints in optimal power flow newton approach
-
Sep.
-
O. Crisan and M. Mohtadi, "Efficient identification of binding inequality constraints in optimal power flow newton approach," Proc. Inst. Elect. Eng., Gen., Transm., Distrib., vol. 139, no. 5, pp. 365-370, Sep. 1992.
-
(1992)
Proc. Inst. Elect. Eng., Gen., Transm., Distrib.
, vol.139
, Issue.5
, pp. 365-370
-
-
Crisan, O.1
Mohtadi, M.2
-
21
-
-
82955224891
-
-
PSERC, Atlanta, GA, Final Project Report 08-06, Mar.
-
A. S. Meliopoulos, V. Vittal, J. McCalley, V. Ajjarapu, and I. Hiskens, Optimal Allocation of Static and Dynamic var Resources, PSERC, Atlanta, GA, Final Project Report 08-06, Mar. 2008, 30332-0250.
-
(2008)
Optimal Allocation of Static and Dynamic Var Resources
, pp. 30332-40250
-
-
Meliopoulos, A.S.1
Vittal, V.2
McCalley, J.3
Ajjarapu, V.4
Hiskens, I.5
-
22
-
-
0034559151
-
Scenarios for multistage stochastic programs
-
J. Dupačová, G. Consigli, and S.W.Wallace, "Scenarios for multistage stochastic programs," Ann. Oper. Res., vol. 100, pp. 25-53, 2000.
-
(2000)
Ann. Oper. Res.
, vol.100
, pp. 25-53
-
-
Dupačová, J.1
Consigli, G.2
Wallace, S.W.3
-
23
-
-
58449108245
-
Sequential importance sampling algorithms for dynamic stochastic programming
-
M. Dempster, "Sequential importance sampling algorithms for dynamic stochastic programming," Ann. Oper. Res., vol. 84, pp. 153-184, 1998.
-
(1998)
Ann. Oper. Res.
, vol.84
, pp. 153-184
-
-
Dempster, M.1
-
24
-
-
0035261934
-
Generating scenario trees for multistage decision problems
-
K. Hoyland and S. W. Wallace, "Generating scenario trees for multistage decision problems," Manage. Sci., vol. 47, no. 2, pp. 295-307, 2001.
-
(2001)
Manage. Sci.
, vol.47
, Issue.2
, pp. 295-307
-
-
Hoyland, K.1
Wallace, S.W.2
-
25
-
-
34248677663
-
Evaluation of scenario-generation methods for stochastic programming
-
M. Kaut and S. W. Wallace, "Evaluation of scenario-generation methods for stochastic programming," Pacific J. Optimiz., vol. 3, pp. 257-271, 2003.
-
(2003)
Pacific J. Optimiz.
, vol.3
, pp. 257-271
-
-
Kaut, M.1
Wallace, S.W.2
-
27
-
-
84861523380
-
Scenario reduction and scenario tree construction for power management problems
-
N. Gröwe-kuska, H. Heitsch, and W. Römisch, "Scenario reduction and scenario tree construction for power management problems," in Proc. Power Management Problems, IEEE Bologna Power Tech, 2003.
-
(2003)
Proc. Power Management Problems, IEEE Bologna Power Tech
-
-
Gröwe-kuska, N.1
Heitsch, H.2
Römisch, W.3
-
28
-
-
84880774099
-
-
San Francisco, CA: Morgan Kaufmann
-
S. Manandhar, A. Tarim, and T. Walsh, Scenario-Based Stochastic Constraint Programming. San Francisco, CA: Morgan Kaufmann, 2003, pp. 257-262.
-
(2003)
Scenario-Based Stochastic Constraint Programming
, pp. 257-262
-
-
Manandhar, S.1
Tarim, A.2
Walsh, T.3
-
29
-
-
43849108245
-
The value of the stochastic solution in multistage problems
-
L. F. Escudero, A. Garín, M. Merino, and G. Pérez, "The value of the stochastic solution in multistage problems," TOP, vol. 15, no. 1, pp. 48-64, 2007.
-
(2007)
TOP
, vol.15
, Issue.1
, pp. 48-64
-
-
Escudero, L.F.1
Garín, A.2
Merino, M.3
Pérez, G.4
-
30
-
-
0019586612
-
Optimal control of reactive power flow for improvements in voltage profiles and for real power loss minimization
-
Jul.
-
K. Mamandur and R. Chenoweth, "Optimal control of reactive power flow for improvements in voltage profiles and for real power loss minimization," IEEE Trans. Power App. Syst., vol. PAS-100, no. 7, pp. 3185-3194, Jul. 1981.
-
(1981)
IEEE Trans. Power App. Syst.
, vol.PAS-100
, Issue.7
, pp. 3185-3194
-
-
Mamandur, K.1
Chenoweth, R.2
-
31
-
-
84855772737
-
-
University of Washington. [Online]. Available
-
"Power systems test case archive," Department of Electrical Engineering, University of Washington. [Online]. Available: http://www.ee. washington.edu/research/pstca.
-
Power Systems Test Case Archive
-
-
-
32
-
-
40949106826
-
Knitro: An integrated package for nonlinear optimization
-
New York: Springer-Verlag
-
R. H. Byrd, J. Nocedal, and R. A. Waltz, "Knitro: An integrated package for nonlinear optimization," in Large Scale Nonlinear Optimization. New York: Springer-Verlag, 2006, pp. 35-59.
-
(2006)
Large Scale Nonlinear Optimization
, pp. 35-59
-
-
Byrd, R.H.1
Nocedal, J.2
Waltz, R.A.3
-
33
-
-
0003404231
-
-
Pacific Grove, CA: Duxbury, Nov.
-
R. Fourer, D. M. Gay, and B. W. Kernighan, AMPL: A Modeling Language for Mathematical Programming. Pacific Grove, CA: Duxbury, Nov. 2002.
-
(2002)
AMPL: A Modeling Language for Mathematical Programming
-
-
Fourer, R.1
Gay, D.M.2
Kernighan, B.W.3
-
34
-
-
51149097427
-
-
Power Transmission and Distribution Group, Siemens, Germany
-
K. Habour and D. O'Leary, "FACTS for cost effective and reliable transmission of electrical energy," Power Transmission and Distribution Group, pp. 1-11, Siemens, Germany.
-
FACTS for Cost Effective and Reliable Transmission of Electrical Energy
, pp. 1-11
-
-
Habour, K.1
O'Leary, D.2
-
35
-
-
79952632888
-
-
Technical University Dortmund, EU 7th Framework Programme, REALISEGRID Project Deliverable D1.2.1, Project no. 219123, Sep. [Online]. Available
-
S. Rüberg, H. Ferreira, A. L'Abbate, U. Häger, G. Fulli, Y. Li, and J. Schwippe, "Improving network controllability by flexible alternating current transmission system (FACTS) and by high voltage direct current (HVDC) transmission systems," Technical University Dortmund, EU 7th Framework Programme, REALISEGRID Project Deliverable D1.2.1, Project no. 219123, Sep. 2008. [Online]. Available: http://realisegrid.rse-web.it/ Publications-and-results.asp.
-
(2008)
Improving Network Controllability by Flexible Alternating Current Transmission System (FACTS) and by High Voltage Direct Current (HVDC) Transmission Systems
-
-
Rüberg, S.1
Ferreira, H.2
L'Abbate, A.3
Häger, U.4
Fulli, G.5
Li, Y.6
Schwippe, J.7
|