메뉴 건너뛰기




Volumn , Issue , 2011, Pages 253-263

Probabilistic Risk Assessment

Author keywords

Cumulative risk; Event trees; Fault trees; Probabilistic risk assessment; Project risk; Software reliability; Space Shuttle probabilistic risk assessment

Indexed keywords


EID: 84886347123     PISSN: None     EISSN: None     Source Type: Book    
DOI: 10.1002/9781119994053.ch15     Document Type: Chapter
Times cited : (7)

References (10)
  • 1
    • 0003687180 scopus 로고    scopus 로고
    • Probabilistic Networks and Expert Systems
    • Springer-Verlag, New York.
    • Cowell, R., Dawid, P. A., Lauritzen, S., and Spiegelhalter, D. (1999) Probabilistic Networks and Expert Systems, Springer-Verlag, New York.
    • (1999)
    • Cowell, R.1    Dawid, P.A.2    Lauritzen, S.3    Spiegelhalter, D.4
  • 2
    • 84886329397 scopus 로고    scopus 로고
    • Graphical Network Interface
    • GeNIe 2. 0, University of Pittsburgh., (accessed Jan 28, 2011).
    • GeNIe 2. 0 (2005) Graphical Network Interface. Decision Systems Laboratory, University of Pittsburgh. http://genie.sis.pitt.edu/ (accessed Jan 28, 2011).
    • (2005) Decision Systems Laboratory
  • 3
    • 84865311731 scopus 로고    scopus 로고
    • Risk modeling
    • in, (ed. L.B. Rainey), Aerospace Press, El Segundo, CA.
    • Guarro, S. and Vesely, W. (2004) Risk modeling, in Space Modeling and Simulation (ed. L.B. Rainey), Aerospace Press, El Segundo, CA.
    • (2004) Space Modeling and Simulation
    • Guarro, S.1    Vesely, W.2
  • 4
    • 0003448310 scopus 로고    scopus 로고
    • Bayesian Networks and Decision Graphs
    • Springer-Verlag, New York.
    • Jensen, F. (2001) Bayesian Networks and Decision Graphs, Springer-Verlag, New York.
    • (2001)
    • Jensen, F.1
  • 5
    • 0041452768 scopus 로고    scopus 로고
    • Risk Modeling for Determining Value and Decision Making
    • Chapman and Hall/CRC Press, Boca Raton, FL.
    • Koller, G. (2000) Risk Modeling for Determining Value and Decision Making, Chapman and Hall/CRC Press, Boca Raton, FL.
    • (2000)
    • Koller, G.1
  • 6
    • 84886315539 scopus 로고    scopus 로고
    • Risk Assessment Report for the NASA DC-8 Transition from Dryden to the University of North Dakota
    • Moskios, T. (2005) Risk Assessment Report for the NASA DC-8 Transition from Dryden to the University of North Dakota.
    • (2005)
    • Moskios, T.1
  • 7
    • 84886345937 scopus 로고    scopus 로고
    • DecisionPlus®, The Complete Formulation, Analysis, and Presentation for Windows, Version 3.0
    • InfoHarvest, PO Box 25155, Seattle, WA.
    • Murphy, P., Solan, A., and Gibbon, J. (2005) DecisionPlus®, The Complete Formulation, Analysis, and Presentation for Windows, Version 3.0. InfoHarvest, PO Box 25155, Seattle, WA.
    • (2005)
    • Murphy, P.1    Solan, A.2    Gibbon, J.3
  • 8
    • 84886319908 scopus 로고    scopus 로고
    • Probabilistic Risk Assessment (PRA) Procedures for NASA Programs and Projects
    • NASA Procedural Requirements, (January 28, 2011)
    • NASA Procedural Requirements (2004) Probabilistic Risk Assessment (PRA) Procedures for NASA Programs and Projects. NPR 8705. 5. 2004. http://nodis3.gsfc.nasa.gov/displayDir.cfm?t=NPR&c=8705&s=5 (January 28, 2011).
    • (2004) NPR 8705. 5. 2004
  • 9
    • 0012151627 scopus 로고    scopus 로고
    • Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners, Version 1.1
    • (accessed January 17, 2001).
    • Stamatelatos, M. et al. (2003) Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners, Version 1.1. http://www.hq.nasa.gov/office/codeq/doctree/praguide.pdf (accessed January 17, 2001).
    • (2003)
    • Stamatelatos, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.