-
1
-
-
67349225799
-
Unit commitment for systems with significant wind penetration
-
May
-
A. Tuohy, P. Meibom, and E. Denny et al., "Unit commitment for systems with significant wind penetration," IEEE Trans. Power Syst., vol. 24, no. 2, pp. 592-601, May 2009.
-
(2009)
IEEE Trans. Power Syst.
, vol.24
, Issue.2
, pp. 592-601
-
-
Tuohy, A.1
Meibom, P.2
Denny, E.3
-
2
-
-
82855172381
-
Look-ahead dispatch in ERCOT: Case study
-
L. Xie, L. Xu, and O. Obadina, "Look-ahead dispatch in ERCOT: Case study," in Proc. Power Energy Soc. General Meeting, San Diego, CA, USA, 2011, pp. 1-3.
-
Proc. Power Energy Soc. General Meeting, San Diego, CA, USA, 2011
, pp. 1-3
-
-
Xie, L.1
Xu, L.2
Obadina, O.3
-
3
-
-
1442264390
-
Unit commitment by enhanced adaptive Lagrangian relaxation
-
Feb.
-
W. Ongsakul and N. Petcharaks, "Unit commitment by enhanced adaptive Lagrangian relaxation," IEEE Trans. Power. Syst., vol. 19, no. 1, pp. 620-628, Feb. 2004.
-
(2004)
IEEE Trans. Power. Syst.
, vol.19
, Issue.1
, pp. 620-628
-
-
Ongsakul, W.1
Petcharaks, N.2
-
4
-
-
0029307071
-
A capacity based Lagrangian relaxation unit commitment with ramp rate constraints
-
May
-
W. L. Peterson and S. R. Brammer, "A capacity based Lagrangian relaxation unit commitment with ramp rate constraints," IEEE Trans. Power Syst., vol. 10, no. 2, pp. 1077-1084, May 1995.
-
(1995)
IEEE Trans. Power Syst.
, vol.10
, Issue.2
, pp. 1077-1084
-
-
Peterson, W.L.1
Brammer, S.R.2
-
5
-
-
0029356616
-
Short-term generation scheduling with transmission and environmental constraints using an augmented Lagrangian relaxation
-
Aug.
-
S. J.Wang, S. M. Shahidehpour, and D. S. Kirschen et al., "Short-term generation scheduling with transmission and environmental constraints using an augmented Lagrangian relaxation," IEEE Trans. Power Syst., vol. 10, no. 3, pp. 1294-1301, Aug. 1995.
-
(1995)
IEEE Trans. Power Syst.
, vol.10
, Issue.3
, pp. 1294-1301
-
-
Wang, S.J.1
Shahidehpour, S.M.2
Kirschen, D.S.3
-
6
-
-
0020091778
-
Spinning reserve constrained static and dynamic economic dispatch
-
Feb.
-
W. G. Wood, "Spinning reserve constrained static and dynamic economic dispatch," IEEE Trans. Power App. Syst., vol. PAS-101, no. 2, pp. 381-388, Feb. 1982.
-
(1982)
IEEE Trans. Power App. Syst.
, vol.PAS-101
, Issue.2
, pp. 381-388
-
-
Wood, W.G.1
-
7
-
-
0027647348
-
Effects of ramp-rate limits on unit commitment and economic dispatch
-
Aug.
-
C. Wang and S. M. Shahidehpour, "Effects of ramp-rate limits on unit commitment and economic dispatch," IEEE Trans. Power Syst., vol. 8, no. 3, pp. 1341-1350, Aug. 1993.
-
(1993)
IEEE Trans. Power Syst.
, vol.8
, Issue.3
, pp. 1341-1350
-
-
Wang, C.1
Shahidehpour, S.M.2
-
8
-
-
0035248330
-
Dynamic economic dispatch: Feasible and optimal solutions
-
Feb.
-
X. S. Han, H. B. Gooi, and D. S. Kirschen, "Dynamic economic dispatch: Feasible and optimal solutions," IEEE Trans. Power Syst., vol. 16, no. 1, pp. 22-28, Feb. 2001.
-
(2001)
IEEE Trans. Power Syst.
, vol.16
, Issue.1
, pp. 22-28
-
-
Han, X.S.1
Gooi, H.B.2
Kirschen, D.S.3
-
9
-
-
84860261854
-
High-speed real-time dynamic economic load dispatch
-
May
-
N. Yorino, H. M. Hafiz, Y. Sasaki, and Y. Zoka, "High-speed real-time dynamic economic load dispatch," IEEE Trans. Power Syst., vol. 27, no. 2, pp. 621-630, May 2012.
-
(2012)
IEEE Trans. Power Syst.
, vol.27
, Issue.2
, pp. 621-630
-
-
Yorino, N.1
Hafiz, H.M.2
Sasaki, Y.3
Zoka, Y.4
-
10
-
-
0029253063
-
Optimal generation schedulingwith ramping costs
-
Feb.
-
C.Wang and S.M. Shahidehpour, "Optimal generation schedulingwith ramping costs," IEEE Trans. Power Syst., vol. 10, no. 1, pp. 60-67, Feb. 1995.
-
(1995)
IEEE Trans. Power Syst.
, vol.10
, Issue.1
, pp. 60-67
-
-
Wang, C.1
Shahidehpour, S.M.2
-
11
-
-
32144445924
-
Unit commitment by an enhanced simulated annealing algorithm
-
Feb.
-
D. N. Simopoulos, S. D. Kavatza, and C. D. Vournas, "Unit commitment by an enhanced simulated annealing algorithm," IEEE Trans. Power Syst., vol. 21, no. 1, pp. 68-76, Feb. 2006.
-
(2006)
IEEE Trans. Power Syst.
, vol.21
, Issue.1
, pp. 68-76
-
-
Simopoulos, D.N.1
Kavatza, S.D.2
Vournas, C.D.3
-
12
-
-
33947321134
-
A new particle swarm optimization solution to nonconvex economic dispatch problems
-
Feb.
-
A. I. Selvakumar and K. Thanushkodi, "A new particle swarm optimization solution to nonconvex economic dispatch problems," IEEE Trans. Power Syst., vol. 22, no. 1, pp. 42-51, Feb. 2007.
-
(2007)
IEEE Trans. Power Syst.
, vol.22
, Issue.1
, pp. 42-51
-
-
Selvakumar, A.I.1
Thanushkodi, K.2
-
13
-
-
28244499291
-
Improved genetic algorithm for power economic dispatch of units with valve-point effects and multiple fuels
-
Nov.
-
C. Chao-Lung, "Improved genetic algorithm for power economic dispatch of units with valve-point effects and multiple fuels," IEEE Trans. Power Syst., vol. 20, no. 4, pp. 1690-1699, Nov. 2005.
-
(2005)
IEEE Trans. Power Syst.
, vol.20
, Issue.4
, pp. 1690-1699
-
-
Chao-Lung, C.1
-
14
-
-
79955538693
-
Unit commitment problem solution using Shuffled Frog Leaping Algorithm
-
May
-
J. Ebrahimi, S. H. Hosseinian, and G. B. Gharehpetian, "Unit commitment problem solution using Shuffled Frog Leaping Algorithm," IEEE Trans. Power Syst., vol. 26, no. 5, pp. 573-581, May 2011.
-
(2011)
IEEE Trans. Power Syst.
, vol.26
, Issue.5
, pp. 573-581
-
-
Ebrahimi, J.1
Hosseinian, S.H.2
Gharehpetian, G.B.3
-
15
-
-
46149124329
-
A hybrid HNN-QP approach for dynamic economic dispatch problem
-
Oct.
-
A. Y. Abdelaziz, M. Z. Kamh, and S. F. Mekhamer et al., "A hybrid HNN-QP approach for dynamic economic dispatch problem," Electric Power Syst. Res., vol. 78, pp. 1784-1788, Oct. 2008.
-
(2008)
Electric Power Syst. Res.
, vol.78
, pp. 1784-1788
-
-
Abdelaziz, A.Y.1
Kamh, M.Z.2
Mekhamer, S.F.3
-
16
-
-
84858450815
-
Solving dynamic economic dispatch problem with security constraints using bacterial foraging PSO-DE algorithm
-
Jul.
-
K. Vaisakh, P. Praveena, and S. Rama Mohana et al., "Solving dynamic economic dispatch problem with security constraints using bacterial foraging PSO-DE algorithm," Int. J. Electrical Power Energy Syst., vol. 39, pp. 56-67, Jul. 2012.
-
(2012)
Int. J. Electrical Power Energy Syst.
, vol.39
, pp. 56-67
-
-
Vaisakh, K.1
Praveena, P.2
Rama Mohana, S.3
-
17
-
-
0023451776
-
Lagrangean decomposition: A model yielding stronger lagrangean bounds
-
M. Guignard and S. Kim, "Lagrangean decomposition: A model yielding stronger lagrangean bounds," Math. Programming, vol. 39, pp. 215-228, 1987.
-
(1987)
Math. Programming
, vol.39
, pp. 215-228
-
-
Guignard, M.1
Kim, S.2
-
18
-
-
42549094850
-
Assessment of Lagrangian relaxation with variable splitting for hydrothermal scheduling
-
A. L. Diniz, C. Sagastizabal, and M. E. P. Maceira, "Assessment of Lagrangian relaxation with variable splitting for hydrothermal scheduling," in Proc. Power Eng. Soc. General Meeting, Sagastizabal, CA, USA, 2007, pp. 1-8.
-
Proc. Power Eng. Soc. General Meeting, Sagastizabal, CA, USA, 2007
, pp. 1-8
-
-
Diniz, A.L.1
Sagastizabal, C.2
Maceira, M.E.P.3
-
19
-
-
0031142782
-
Variable splitting applied tomodelling of start-up costs in short term hydro generation scheduling
-
May
-
O. Nilsson and D. Sjelvgren, "Variable splitting applied tomodelling of start-up costs in short term hydro generation scheduling," IEEE Trans. Power Syst., vol. 12, no. 2, pp. 770-775, May 1997.
-
(1997)
IEEE Trans. Power Syst.
, vol.12
, Issue.2
, pp. 770-775
-
-
Nilsson, O.1
Sjelvgren, D.2
-
20
-
-
33646376903
-
Solving the hydro unit commitment problem via dual decomposition and sequential quadratic programming
-
May
-
E. C. Finardi and E. L. Da Silva, "Solving the hydro unit commitment problem via dual decomposition and sequential quadratic programming," IEEE Trans. Power Syst., vol. 21, no. 2, pp. 835-844, May 2006.
-
(2006)
IEEE Trans. Power Syst.
, vol.21
, Issue.2
, pp. 835-844
-
-
Finardi, E.C.1
Da Silva, E.L.2
-
21
-
-
33747920157
-
Auction implementation problems using Lagrangian relaxation
-
Feb.
-
S. Dekrajangpetch, G. B. Sheble, and A. Conejo, "Auction implementation problems using Lagrangian relaxation," IEEE Trans. Power Syst., vol. 14, no. 1, pp. 82-88, Feb. 1999.
-
(1999)
IEEE Trans. Power Syst.
, vol.14
, Issue.1
, pp. 82-88
-
-
Dekrajangpetch, S.1
Sheble, G.B.2
Conejo, A.3
-
22
-
-
84866564679
-
Combined heat and power (CHP) economic dispatch solved using Lagrangian relaxation with surrogate subgradient multiplier updates
-
Jan.
-
A. Sashirekha, J. Pasupuleti, and N. H. Moin et al., "Combined heat and power (CHP) economic dispatch solved using Lagrangian relaxation with surrogate subgradient multiplier updates," Int. J. Electrical Power Energy Syst., vol. 44, pp. 421-430, Jan. 2013.
-
(2013)
Int. J. Electrical Power Energy Syst.
, vol.44
, pp. 421-430
-
-
Sashirekha, A.1
Pasupuleti, J.2
Moin, N.H.3
-
23
-
-
0033079889
-
Short-term hydro-thermal coordination by Lagrangian relaxation: Solution of the dual problem
-
Feb.
-
N. J. Redondo and A. J. Conejo, "Short-term hydro-thermal coordination by Lagrangian relaxation: Solution of the dual problem," IEEE Trans. Power Syst., vol. 14, no. 1, pp. 89-95, Feb. 1999.
-
(1999)
IEEE Trans. Power Syst.
, vol.14
, Issue.1
, pp. 89-95
-
-
Redondo, N.J.1
Conejo, A.J.2
-
24
-
-
0032072749
-
An algorithm for solving the dual problem of hydrothermal scheduling
-
May
-
P. B. Luh, D. Zhang, and R. N. Tomastik, "An algorithm for solving the dual problem of hydrothermal scheduling," IEEE Trans. Power Syst., vol. 13, no. 2, pp. 593-600, May 1998.
-
(1998)
IEEE Trans. Power Syst.
, vol.13
, Issue.2
, pp. 593-600
-
-
Luh, P.B.1
Zhang, D.2
Tomastik, R.N.3
-
25
-
-
0037291089
-
Lagrangian heuristics based on disaggregated Bundle methods for hydrothermal unit commitment
-
Feb.
-
A. Borghetti, A. Frangioni, and F. Lacalandra et al., "Lagrangian heuristics based on disaggregated Bundle methods for hydrothermal unit commitment," IEEE Trans. Power Syst., vol. 18, no. 1, pp. 313-323, Feb. 2003.
-
(2003)
IEEE Trans. Power Syst.
, vol.18
, Issue.1
, pp. 313-323
-
-
Borghetti, A.1
Frangioni, A.2
Lacalandra, F.3
-
26
-
-
0033221396
-
A bundle method for hydrothermal scheduling
-
Nov.
-
Z. Daoyuan, P. B. Luh, and Z. Yuanhui, "A bundle method for hydrothermal scheduling," IEEE Trans. Power Syst., vol. 14, no. 4, pp. 1355-1361, Nov. 1999.
-
(1999)
IEEE Trans. Power Syst.
, vol.14
, Issue.4
, pp. 1355-1361
-
-
Daoyuan, Z.1
Luh, P.B.2
Yuanhui, Z.3
-
27
-
-
33749477054
-
Solving nonlinear single-unit commitment problems with ramping constraints
-
Jul.
-
A. Frangioni and C. Gentile, "Solving nonlinear single-unit commitment problems with ramping constraints," Oper. Res., vol. 54, pp. 767-775, Jul. 2006.
-
(2006)
Oper. Res.
, vol.54
, pp. 767-775
-
-
Frangioni, A.1
Gentile, C.2
-
28
-
-
84893184890
-
Dynamic economic dispatch with spinning reserve constraints considering wind power integration
-
Z. Li, W. Wu, and B. Zhang et al., "Dynamic economic dispatch with spinning reserve constraints considering wind power integration," in Proc. Power Energy Soc. General Meeting, Vancouver, BC, Canada, Jul. 21-25, 2013.
-
Proc. Power Energy Soc. General Meeting, Vancouver, BC, Canada, Jul. 21-25, 2013
-
-
Li, Z.1
Wu, W.2
Zhang, B.3
-
29
-
-
0018544097
-
IEEE reliability test system
-
Nov.
-
"IEEE reliability test system," IEEE Trans. Power App. Syst., vol. PAS-98, no. 6, pp. 2047-2054, Nov. 1979.
-
(1979)
IEEE Trans. Power App. Syst.
, vol.PAS-98
, Issue.6
, pp. 2047-2054
-
-
-
30
-
-
0029356615
-
A direct method for security-constrained unit commitment
-
Aug.
-
J. J. Shaw, "A direct method for security-constrained unit commitment," IEEE Trans. Power Syst., vol. 10, no. 3, pp. 1329-1342,Aug. 1995.
-
(1995)
IEEE Trans. Power Syst.
, vol.10
, Issue.3
, pp. 1329-1342
-
-
Shaw, J.J.1
-
31
-
-
84886090129
-
-
Electrical and Computer Engineering Department, Illinois Institute of Technology, Apr. 29, Available: motor.ece.iit.edu Directory: data/ File:IEEE-118%20system%20unit%20data.pdf
-
Electrical and Computer Engineering Department, Illinois Institute of Technology, Apr. 29, 2004, IEEE-118 System Unit Data [Online]. Available: motor.ece.iit.edu Directory: data/ File:IEEE-118%20system%20unit%20data.pdf
-
(2004)
IEEE-118 System Unit Data [Online]
-
-
|