메뉴 건너뛰기




Volumn 28, Issue 4, 2013, Pages 4558-4567

Robust transmission network expansion planning with uncertain renewable generation and loads

Author keywords

Linear programming; Optimization methods; Power system planning

Indexed keywords

BENDERS DECOMPOSITION; MIXED INTEGER LINEAR PROGRAM; OPTIMIZATION METHOD; POWER SYSTEM PLANNING; RENEWABLE GENERATION; ROBUST OPTIMIZATION; SOLUTION ALGORITHMS; TRANSMISSION NETWORK EXPANSION PLANNING;

EID: 84886093553     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2013.2267058     Document Type: Article
Times cited : (294)

References (23)
  • 2
    • 80054906305 scopus 로고    scopus 로고
    • A strategy to solve the multistage transmission expansion planning problem
    • Nov.
    • G. Vinasco,M. J. Rider, and R. Romero, "A strategy to solve the multistage transmission expansion planning problem," IEEE Trans. Power Syst., vol. 26, no. 4, pp. 2574-2576, Nov. 2011.
    • (2011) IEEE Trans. Power Syst. , vol.26 , Issue.4 , pp. 2574-2576
    • Vinasco, G.1    Rider, M.J.2    Romero, R.3
  • 3
    • 0035339650 scopus 로고    scopus 로고
    • A new Benders decomposition approach to solve power transmission network design problems
    • May
    • S. Binato, M. V. F. Pereira, and S. Granville, "A new Benders decomposition approach to solve power transmission network design problems," IEEE Trans. Power Syst., vol. 16, no. 2, pp. 235-240, May 2001.
    • (2001) IEEE Trans. Power Syst. , vol.16 , Issue.2 , pp. 235-240
    • Binato, S.1    Pereira, M.V.F.2    Granville, S.3
  • 4
    • 33847689868 scopus 로고    scopus 로고
    • Transmission network expansion planning considering uncertainty in demand
    • Nov.
    • I. de J. Silva, M. J. Rider, R. Romero, and C. A. F. Murari, "Transmission network expansion planning considering uncertainty in demand," IEEE Trans. Power Syst., vol. 21, no. 4, pp. 1565-1573, Nov. 2006.
    • (2006) IEEE Trans. Power Syst. , vol.21 , Issue.4 , pp. 1565-1573
    • De Silva, I.J.1    Rider, M.J.2    Romero, R.3    Murari, C.A.F.4
  • 6
    • 0021494176 scopus 로고
    • Static transmission capacity expansion planning under uncertainty
    • Sept.
    • T. A.M. Sharaf and G. J. Berg, "Static transmission capacity expansion planning under uncertainty," Electr. Power Syst. Res., vol. 7, no. 4, pp. 289-296, Sept. 1984.
    • (1984) Electr. Power Syst. Res. , vol.7 , Issue.4 , pp. 289-296
    • Sharaf, T.A.M.1    Berg, G.J.2
  • 7
    • 34548025131 scopus 로고    scopus 로고
    • Generation and transmission expansion under risk using stochastic programming
    • Aug.
    • J. A. López, K. Ponnambalam, and V. H. Quintana, "Generation and transmission expansion under risk using stochastic programming," IEEE Trans. Power Syst., vol. 22, no. 3, pp. 1369-1378, Aug. 2007.
    • (2007) IEEE Trans. Power Syst. , vol.22 , Issue.3 , pp. 1369-1378
    • López, J.A.1    Ponnambalam, K.2    Quintana, V.H.3
  • 8
    • 24944564730 scopus 로고    scopus 로고
    • A method for transmission system expansion planning considering probabilistic reliability criteria
    • Aug.
    • J. Choi, T. Tran, A. A. El-Keib, R. Thomas, H. Oh, and R. Billinton, "A method for transmission system expansion planning considering probabilistic reliability criteria," IEEE Trans. Power Syst., vol. 20, no. 3, pp. 1606-1615, Aug. 2005.
    • (2005) IEEE Trans. Power Syst. , vol.20 , Issue.3 , pp. 1606-1615
    • Choi, J.1    Tran, T.2    El-Keib, A.A.3    Thomas, R.4    Oh, H.5    Billinton, R.6
  • 9
    • 68349150313 scopus 로고    scopus 로고
    • A chance constrained transmission network expansion planning method with consideration of load and wind farm uncertainties
    • Aug.
    • H. Yu, C. Y. Chung, K. P. Wong, and J. H. Zhang, "A chance constrained transmission network expansion planning method with consideration of load and wind farm uncertainties," IEEE Trans. Power Syst., vol. 24, no. 3, pp. 1568-1576, Aug. 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.3 , pp. 1568-1576
    • Yu, H.1    Chung, C.Y.2    Wong, K.P.3    Zhang, J.H.4
  • 10
    • 0032207223 scopus 로고    scopus 로고
    • Robust convex optimization
    • A. Ben-Tal and A. Nemirovski, "Robust convex optimization," Math. Oper. Res., vol. 23, no. 4, pp. 769-805, 1998.
    • (1998) Math. Oper. Res. , vol.23 , Issue.4 , pp. 769-805
    • Ben-Tal, A.1    Nemirovski, A.2
  • 11
    • 84872853161 scopus 로고    scopus 로고
    • Adaptive robust optimization for the security constrained unit commitment problem
    • Feb.
    • D. Bertsimas, E. Litvinov, X. A. Sun, J. Zhao, and T. Zheng, "Adaptive robust optimization for the security constrained unit commitment problem," IEEE Trans. Power Syst., vol. 28, no. 1, pp. 52-63, Feb. 2013.
    • (2013) IEEE Trans. Power Syst. , vol.28 , Issue.1 , pp. 52-63
    • Bertsimas, D.1    Litvinov, E.2    Sun, X.A.3    Zhao, J.4    Zheng, T.5
  • 12
    • 49249130139 scopus 로고    scopus 로고
    • The interval minimum load cutting problem in the process of transmission network expansion planning considering uncertainty in demand
    • Aug.
    • P. Wu, H. Cheng, and J. Xing, "The interval minimum load cutting problem in the process of transmission network expansion planning considering uncertainty in demand," IEEE Trans. Power Syst., vol. 23, no. 3, pp. 1497-1506, Aug. 2008.
    • (2008) IEEE Trans. Power Syst. , vol.23 , Issue.3 , pp. 1497-1506
    • Wu, P.1    Cheng, H.2    Xing, J.3
  • 13
    • 79960893391 scopus 로고    scopus 로고
    • Robust transmission network expansion planning method with Taguchi's orthogonal array testing
    • Aug.
    • H. Yu, C. Y. Chung, and K. P. Wong, "Robust transmission network expansion planning method with Taguchi's orthogonal array testing," IEEE Trans. Power Syst., vol. 26, no. 3, pp. 1573-1580, Aug. 2011.
    • (2011) IEEE Trans. Power Syst. , vol.26 , Issue.3 , pp. 1573-1580
    • Yu, H.1    Chung, C.Y.2    Wong, K.P.3
  • 16
    • 84881026090 scopus 로고    scopus 로고
    • Optimization of AC transmission system planning
    • DOI: 10.1109/TPWRS.2013. 2228507
    • R. A. Jabr, "Optimization of AC transmission system planning," IEEE Trans. Power Syst., vol. PP, no. 99, 2012, DOI: 10.1109/TPWRS.2013. 2228507.
    • (2012) IEEE Trans. Power Syst. , vol.PP , Issue.99
    • Jabr, R.A.1
  • 17
    • 3042762207 scopus 로고    scopus 로고
    • The price of robustness
    • Jan.-Feb.
    • D. Bertsimas and M. Sim, "The price of robustness," Oper. Res., vol. 52, no. 1, pp. 35-53, Jan.-Feb. 2004.
    • (2004) Oper. Res. , vol.52 , Issue.1 , pp. 35-53
    • Bertsimas, D.1    Sim, M.2
  • 19
    • 84871320661 scopus 로고    scopus 로고
    • ver. 12.3 [Online]. Available
    • IBM ILOG CPLEX. ver. 12.3 [Online]. Available: http://www-01.ibm.com/ software/integration/optimization/cplex-optimizer
    • IBM ILOG CPLEX
  • 20
    • 79151479984 scopus 로고    scopus 로고
    • MATPOWER: Steady-state operations, planning, and analysis tools for power systems research and education
    • Feb.
    • R. D. Zimmerman, C. E. Murillo-Sánchez, and R. J. Thomas, "MATPOWER: Steady-state operations, planning, and analysis tools for power systems research and education," IEEE Trans. Power Syst., vol. 26, no. 1, pp. 12-19, Feb. 2011.
    • (2011) IEEE Trans. Power Syst. , vol.26 , Issue.1 , pp. 12-19
    • Zimmerman, R.D.1    Murillo-Sánchez, C.E.2    Thomas, R.J.3
  • 21
    • 0037292318 scopus 로고    scopus 로고
    • A new strategy for transmission expansion in competitive electricity markets
    • Feb.
    • R. Fang and D. J. Hill, "A new strategy for transmission expansion in competitive electricity markets," IEEE Trans. Power Syst., vol. 18, no. 1, pp. 374-380, Feb. 2003.
    • (2003) IEEE Trans. Power Syst. , vol.18 , Issue.1 , pp. 374-380
    • Fang, R.1    Hill, D.J.2
  • 22
    • 0018544097 scopus 로고
    • IEEE reliability test system
    • P. M. Subcommittee, Nov.
    • P. M. Subcommittee, "IEEE reliability test system," IEEE Trans. Power Appar. Syst., vol. PAS-98, no. 6, pp. 2047-2054, Nov. 1979.
    • (1979) IEEE Trans. Power Appar. Syst. , vol.PAS-98 , Issue.6 , pp. 2047-2054


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.