메뉴 건너뛰기




Volumn , Issue , 2000, Pages 22-31

Heuristics for Constraint-Directed Scheduling with Inventory

Author keywords

[No Author keywords available]

Indexed keywords

ARTIFICIAL INTELLIGENCE; CRITICALITY (NUCLEAR FISSION); INVENTORY CONTROL;

EID: 84885686552     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (2)

References (26)
  • 2
    • 0343277802 scopus 로고    scopus 로고
    • The ODO project: Toward a unified basis for constraint-directed scheduling
    • Beck, J. C., Davenport, A. J., Davis, E. D., and Fox, M. S. (1998). The ODO project: Toward a unified basis for constraint-directed scheduling. Journal of Scheduling, 1(2):89–125.
    • (1998) Journal of Scheduling , vol.1 , Issue.2 , pp. 89-125
    • Beck, J. C.1    Davenport, A. J.2    Davis, E. D.3    Fox, M. S.4
  • 6
    • 85166218603 scopus 로고    scopus 로고
    • The job shop scheduling problem: Conventional and new solution techniques. European Journal of Operational Research, 93(1):1–33. Carlier, J. and Pinson, E. (1994). Adjustment of heads and tails for the job-shop problem
    • European Journal of Operational Research
    • Blazewicz, J., Domschke, W., and Pesch, E. (1996). The job shop scheduling problem: Conventional and new solution techniques. European Journal of Operational Research, 93(1):1–33. Carlier, J. and Pinson, E. (1994). Adjustment of heads and tails for the job-shop problem. European Journal of Operational Research, 78:146–161.
    • (1996) , vol.78 , pp. 146-161
    • Blazewicz, J.1    Domschke, W.2    Pesch, E.3
  • 9
    • 0004176660 scopus 로고
    • PhD thesis, Carnegie Mellon University, Intelligent Systems Laboratory, The Robotics Institute, Pittsburgh, PA. CMU-RI-TR-85-7
    • Fox, M. S. (1983). Constraint-Directed Search: A Case Study of Job-Shop Scheduling. PhD thesis, Carnegie Mellon University, Intelligent Systems Laboratory, The Robotics Institute, Pittsburgh, PA. CMU-RI-TR-85-7.
    • (1983) Constraint-Directed Search: A Case Study of Job-Shop Scheduling
    • Fox, M. S.1
  • 15
    • 0028442512 scopus 로고
    • Implementation of resource constraints in ILOG Schedule: A library for the development of constraint-based scheduling systems
    • Le Pape, C. (1994a). Implementation of resource constraints in ILOG Schedule: A library for the development of constraint-based scheduling systems. Intelligent Systems Engineering, 3(2):55–66.
    • (1994) Intelligent Systems Engineering , vol.3 , Issue.2 , pp. 55-66
    • Le Pape, C.1
  • 22
    • 0346298277 scopus 로고
    • Technical report, Carnegie Group, Inc., Pittsburgh, PA
    • Saks, V. (1992). Distribution planner overview. Technical report, Carnegie Group, Inc., Pittsburgh, PA, 15222.
    • (1992) Distribution planner overview , pp. 15222
    • Saks, V.1
  • 23
    • 0015728810 scopus 로고
    • The structure of ill-structured problems
    • Simon, H. A. (1973). The structure of ill-structured problems. Artificial Intelligence, 4:181–200.
    • (1973) Artificial Intelligence , vol.4 , pp. 181-200
    • Simon, H. A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.