메뉴 건너뛰기




Volumn , Issue , 2013, Pages

Grid impacts of twin EV fast charging stations placed alongside a motorway

Author keywords

battery switching; DIgSILENT Power Factory; e mobility; electric car; fast charging; stochastic model

Indexed keywords

DIGSILENT POWER FACTORIES; E MOBILITIES; ELECTRIC CARS; ELECTRIC VEHICLE BATTERIES; FAST CHARGING; FAST CHARGING STATIONS; MEDIUM VOLTAGE GRID; PLAUSIBLE ASSUMPTIONS;

EID: 84885447297     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/IYCE.2013.6604144     Document Type: Conference Paper
Times cited : (18)

References (7)
  • 1
    • 84885450367 scopus 로고    scopus 로고
    • Hungarian Energy Office homepage
    • Hungarian Energy Office homepage http://www.eh.gov.hu/gcpdocs/201103/ profiloL2011-esz30n.xls http://www.eh.gov.hu/gcpdocs/201103/naptar201 LI23 dstjavitott.xls
  • 2
    • 84885457357 scopus 로고    scopus 로고
    • Hans Kr. Hi idalen (NTNU Norway)
    • Hans Kr. Hi, idalen (NTNU Norway), "Introduction to A TPDraw version 5". Available: http://www.atpdraw.net/presentation.php
    • Introduction to A TPDraw Version 5
  • 5
    • 84885459899 scopus 로고    scopus 로고
    • ABB Terra 51 Charge station leaflet
    • ABB Terra 51 Charge station leaflet, Available: http://www05.abb. comiglobaVscot/scot344.nsf/veritydisplay/048b73e2a 3c71 f37c I 2579cro0262c491$file/4EVC200 I 02-LFEN- Terra51 ChargeStation.pdf
  • 7
    • 84885448803 scopus 로고    scopus 로고
    • PO Team Engineering Ltd. Network Plan of the Eger Region EMASZ Halozati Kft. (DSO) 2010
    • PO Team Engineering Ltd., Network Plan of the Eger Region, EMASZ Halozati Kft. (DSO), 2010.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.