메뉴 건너뛰기




Volumn 209, Issue 1, 2013, Pages 5-40

A decomposition method for approximate evaluation of continuous flow multi-stage lines with general Markovian machines

Author keywords

Asynchronous flow lines; Decomposition; Finite capacity buffers; Markovian fluid models

Indexed keywords


EID: 84884980096     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1007/s10479-011-0961-9     Document Type: Article
Times cited : (60)

References (34)
  • 2
    • 0000825747 scopus 로고
    • The least variable phase-type distribution is Erlang
    • Aldous, D., & Shepp, L. (1987). The least variable phase-type distribution is Erlang. Stochastic Models, 3, 467-473.
    • (1987) Stochastic Models , vol.3 , pp. 467-473
    • Aldous, D.1    Shepp, L.2
  • 3
    • 0022076035 scopus 로고
    • On the phase-type approximations of general distributions
    • Altiok, T. (1985). On the phase-type approximations of general distributions. IIE Transactions, 17(2), 110-116.
    • (1985) IIE Transactions , vol.17 , Issue.2 , pp. 110-116
    • Altiok, T.1
  • 5
    • 0028074177 scopus 로고
    • A study of the continuous flow model of production lines with unreliable machines and finite buffers
    • Alvarez-Vargas, R., Dallery, Y., & David, R. (1994). A study of the continuous flow model of production lines with unreliable machines and finite buffers. Journal of Manufacturing Systems, 13(3), 221-234.
    • (1994) Journal of Manufacturing Systems , vol.13 , Issue.3 , pp. 221-234
    • Alvarez-Vargas, R.1    Dallery, Y.2    David, R.3
  • 6
    • 0003681233 scopus 로고
    • Ph. D. thesis, Operations Research Center, Massachusetts Institute of Technology
    • Burman, M. H. (1995). New results in flow line analysis. Ph. D. thesis, Operations Research Center, Massachusetts Institute of Technology.
    • (1995) New results in flow line analysis
    • Burman, M.H.1
  • 7
    • 0039506447 scopus 로고    scopus 로고
    • Hewlett-Packard uses operations research to improve the design of a printer production line
    • Burman, M. H., Gershwin, S. B., & Suyematsu, C. (1998). Hewlett-Packard uses operations research to improve the design of a printer production line. Interfaces, 28(1), 24-36.
    • (1998) Interfaces , vol.28 , Issue.1 , pp. 24-36
    • Burman, M.H.1    Gershwin, S.B.2    Suyematsu, C.3
  • 8
    • 84954971480 scopus 로고
    • Models of automatic transfer lines with inventory banks: a review and comparison
    • Buzacott, J. A., & Hanifin, L. E. (1978). Models of automatic transfer lines with inventory banks: a review and comparison. AHE Transactions, 10, 197-207.
    • (1978) AHE Transactions , vol.10 , pp. 197-207
    • Buzacott, J.A.1    Hanifin, L.E.2
  • 10
    • 84879026451 scopus 로고    scopus 로고
    • Performance evaluation of continuous production lines with deterministic processing times, multiple failure modes and multiple part types
    • Sorrento, ItalyJune 30th-July 2nd 2004
    • Colledani, M., & Tolio, T. (2004). Performance evaluation of continuous production lines with deterministic processing times, multiple failure modes and multiple part types. In Proceedings of 4th CIRP conference on intelligent computation in manufacturing engineering, ICME04, June 30th-July 2nd 2004, Sorrento, Italy (pp. 29-34).
    • (2004) Proceedings of 4th CIRP Conference on Intelligent Computation in Manufacturing Engineering, ICME04 , pp. 29-34
    • Colledani, M.1    Tolio, T.2
  • 11
    • 79961020137 scopus 로고    scopus 로고
    • Integrated analysis of quality and production logistics in asynchronous manufacturing lines
    • July 6-11Seoul, Korea
    • Colledani, M. (2008). Integrated analysis of quality and production logistics in asynchronous manufacturing lines. In 17th IFAC world congress, July 6-11, Seoul, Korea.
    • (2008) 17th IFAC World Congress
    • Colledani, M.1
  • 12
    • 0031337014 scopus 로고    scopus 로고
    • Homogenization techniques for the analysis of production lines with unreliable machines having different speeds
    • Dallery, Y., & Le Bihan, H. (1997). Homogenization techniques for the analysis of production lines with unreliable machines having different speeds. European Journal of Control, 3(3), 200-215.
    • (1997) European Journal of Control , vol.3 , Issue.3 , pp. 200-215
    • Dallery, Y.1    Le Bihan, H.2
  • 13
    • 0034405773 scopus 로고    scopus 로고
    • A robust decomposition method for the analysis of production lines with unreliable machines and finite buffers
    • Dallery, Y., & Le Bihan, H. (2000). A robust decomposition method for the analysis of production lines with unreliable machines and finite buffers. Annals of Operations Research, 93, 265-297.
    • (2000) Annals of Operations Research , vol.93 , pp. 265-297
    • Dallery, Y.1    Le Bihan, H.2
  • 14
    • 37349023615 scopus 로고    scopus 로고
    • A Semi-Markov decision algorithm for the maintenance of a production system with buffer capacity and continuous repair times
    • Dimitrakos, T. D., & Kyriakidis, E. G. (2008). A Semi-Markov decision algorithm for the maintenance of a production system with buffer capacity and continuous repair times. International Journal of Production Economics, 111, 752-762.
    • (2008) International Journal of Production Economics , vol.111 , pp. 752-762
    • Dimitrakos, T.D.1    Kyriakidis, E.G.2
  • 16
    • 34249834508 scopus 로고
    • Manufacturing flow line systems: a review of models and analytical results
    • Special Issue on Queueing Models of Manufacturing Systems
    • Gershwin, S. B., & Dallery, Y. (1992). Manufacturing flow line systems: a review of models and analytical results. Queueing Systems Theory and Applications (Vol. 12, pp. 3-94). Special Issue on Queueing Models of Manufacturing Systems.
    • (1992) Queueing Systems Theory and Applications , vol.12 , pp. 3-94
    • Gershwin, S.B.1    Dallery, Y.2
  • 18
    • 38049050295 scopus 로고    scopus 로고
    • Analysis of long flow lines with quality and operational failures
    • Gershwin, S. B., & Kim, J. (2008). Analysis of long flow lines with quality and operational failures. IIE Transactions, 40, 284-296.
    • (2008) IIE Transactions , vol.40 , pp. 284-296
    • Gershwin, S.B.1    Kim, J.2
  • 19
    • 67651157034 scopus 로고    scopus 로고
    • Analysis of a general Markovian two-stage continuous-flow production system with a finite buffer
    • Gershwin, S. B., & Tan, B. (2009). Analysis of a general Markovian two-stage continuous-flow production system with a finite buffer. International Journal of Production Economics, 120(2), 327-339.
    • (2009) International Journal of Production Economics , vol.120 , Issue.2 , pp. 327-339
    • Gershwin, S.B.1    Tan, B.2
  • 20
    • 78650191502 scopus 로고    scopus 로고
    • Modelling and analysis of Markovian continuous flow systems with a finite buffer
    • Gershwin, S. B., & Tan, B. (2010). Modelling and analysis of Markovian continuous flow systems with a finite buffer. Annals of Operations Research, 182(1), 5-30.
    • (2010) Annals of Operations Research , vol.182 , Issue.1 , pp. 5-30
    • Gershwin, S.B.1    Tan, B.2
  • 22
    • 0027555001 scopus 로고
    • Analysis of behaviour of an unreliable n-stage transfer line with (n-1) inter-stage storage buffers
    • Glassey, C. R., & Hong, Y. (1993). Analysis of behaviour of an unreliable n-stage transfer line with (n-1) inter-stage storage buffers. International Journal of Production Research, 31(3), 519-530.
    • (1993) International Journal of Production Research , vol.31 , Issue.3 , pp. 519-530
    • Glassey, C.R.1    Hong, Y.2
  • 23
    • 4043121812 scopus 로고    scopus 로고
    • A new decomposition approach for non-cyclic continuous material flow lines with a merging flow of material
    • Helber, S., & Jusic, H. (2004). A new decomposition approach for non-cyclic continuous material flow lines with a merging flow of material. Annals of Operations Research, 125, 117-139.
    • (2004) Annals of Operations Research , vol.125 , pp. 117-139
    • Helber, S.1    Jusic, H.2
  • 26
    • 0000285320 scopus 로고    scopus 로고
    • Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems
    • Inman, R. R. (1999). Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems. Production Operations Management, 8, 409-432.
    • (1999) Production Operations Management , vol.8 , pp. 409-432
    • Inman, R.R.1
  • 27
    • 38049086153 scopus 로고    scopus 로고
    • Ph. D. thesis, Massachusetts Institute of Technology. Available at
    • Kim, J. (2004). Designing production systems for quality and quantity. Ph. D. thesis, Massachusetts Institute of Technology. Available at http://cell1. mit. edu/theses/kim-jongyoon-phd. pdf.
    • (2004) Designing production systems for quality and quantity
    • Kim, J.1
  • 28
    • 0012378734 scopus 로고    scopus 로고
    • Continuous two-machine line with multiple failure modes and finite buffer capacity
    • Brescia, ItalySeptember 13-15
    • Levantesi, R., Matta, A., & Tolio, T. (1999). Continuous two-machine line with multiple failure modes and finite buffer capacity. In Proceedings of IV AITEM conference, Brescia, Italy, September 13-15.
    • (1999) Proceedings of IV AITEM Conference
    • Levantesi, R.1    Matta, A.2    Tolio, T.3
  • 29
    • 0037295930 scopus 로고    scopus 로고
    • Performance evaluation of continuous production lines with machines having different processing rates and multiple failure modes
    • Levantesi, R., Matta, A., & Tolio, T. (2003). Performance evaluation of continuous production lines with machines having different processing rates and multiple failure modes. Performance Evaluation, 51, 247-268.
    • (2003) Performance Evaluation , vol.51 , pp. 247-268
    • Levantesi, R.1    Matta, A.2    Tolio, T.3
  • 30
    • 0035400771 scopus 로고    scopus 로고
    • Modeling and analysis of an unreliable flow line composed of parallel-machine stages
    • Patchong, A., & Willaeys, D. (2001). Modeling and analysis of an unreliable flow line composed of parallel-machine stages. IIE Transactions, 33, 559-568.
    • (2001) IIE Transactions , vol.33 , pp. 559-568
    • Patchong, A.1    Willaeys, D.2
  • 31
    • 0037253357 scopus 로고    scopus 로고
    • Improving car body production at PSA Peugeot Citroën
    • Patchong, A., Lemoine, T., & Kern, G. (2003). Improving car body production at PSA Peugeot Citroën. Interfaces, 33(1), 36-49.
    • (2003) Interfaces , vol.33 , Issue.1 , pp. 36-49
    • Patchong, A.1    Lemoine, T.2    Kern, G.3
  • 32
    • 0031259221 scopus 로고    scopus 로고
    • A decomposition model for continuous materials flow production systems
    • Tan, B., & Yeralan, S. (1997). A decomposition model for continuous materials flow production systems. International Journal of Production Research, 35(10), 2759-2772.
    • (1997) International Journal of Production Research , vol.35 , Issue.10 , pp. 2759-2772
    • Tan, B.1    Yeralan, S.2
  • 33
    • 33645885335 scopus 로고    scopus 로고
    • Closed form solutions for mapping general distributions to quasi-minimal PH distributions
    • Osogami, T., & Harchol-Balter, M. (2006). Closed form solutions for mapping general distributions to quasi-minimal PH distributions. Performance Evaluation, 62, 524-552.
    • (2006) Performance Evaluation , vol.62 , pp. 524-552
    • Osogami, T.1    Harchol-Balter, M.2
  • 34
    • 0035831088 scopus 로고    scopus 로고
    • A three station continuous materials flow merge system with unreliable stations and a shared buffer
    • Tan, B. (2001). A three station continuous materials flow merge system with unreliable stations and a shared buffer. Mathematical and Computer Modelling, 33(8-9), 1011-1026.
    • (2001) Mathematical and Computer Modelling , vol.33 , Issue.8-9 , pp. 1011-1026
    • Tan, B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.