메뉴 건너뛰기




Volumn 27, Issue 5, 2013, Pages 646-655

Modeling fund allocation to water main rehabilitation projects

Author keywords

AHP; Fund allocation; MAUT; Model; Water mains

Indexed keywords

AHP; FUND ALLOCATION; MAUT; MULTI-ATTRIBUTE UTILITY THEORY; QUALITATIVE DATA; REHABILITATION PROJECTS; REPLACEMENT COSTS; WATER MAINS;

EID: 84884641923     PISSN: 08873828     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CF.1943-5509.0000353     Document Type: Article
Times cited : (10)

References (32)
  • 1
    • 13944255814 scopus 로고    scopus 로고
    • Financial outlay modeling for a local sewer rehabilitation strategy
    • Ariaratnam, S., and, MacLeod, C. (2002). "Financial outlay modeling for a local sewer rehabilitation strategy." J. Constr. Eng. Manage., 128 (6), 486-495.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.6 , pp. 486-495
    • Ariaratnam, S.1    Macleod, C.2
  • 2
    • 0034062294 scopus 로고    scopus 로고
    • Optimal fund assignment and allocation models for pipe repair maintenance in leaky water distribution networks
    • Bach, N., Fujiwara, O., and, Luong, H. (2000). "Optimal fund assignment and allocation models for pipe repair maintenance in leaky water distribution networks." Water Resour. Res., 36 (5), 1315-1324.
    • (2000) Water Resour. Res. , vol.36 , Issue.5 , pp. 1315-1324
    • Bach, N.1    Fujiwara, O.2    Luong, H.3
  • 3
    • 33646203315 scopus 로고    scopus 로고
    • Buried treasures. NRC'S Institute for Research in Construction develops new ways to evaluate the performance of underground pipes
    • Baer, N. (1998). "Buried treasures. NRC'S Institute for Research in Construction develops new ways to evaluate the performance of underground pipes." Can. Consult. Eng., 39 (2), 41-43.
    • (1998) Can. Consult. Eng. , vol.39 , Issue.2 , pp. 41-43
    • Baer, N.1
  • 4
    • 84884606222 scopus 로고    scopus 로고
    • Best practice scan-Potable water PW2. R. V. Anderson Associates Ltd. (RVA).
    • Best practice scan-Potable water PW2. (2002). R. V. Anderson Associates Ltd. (RVA).
    • (2002)
  • 7
    • 0035395910 scopus 로고    scopus 로고
    • Optimal scheduling of water pipe replacement using genetic algorithms
    • doi:10.1061/(ASCE)0733-9496(2001)127:4(214)
    • Dandy, G., and, Engelhardt, M. (2001). " Optimal scheduling of water pipe replacement using genetic algorithms." J. Water Resour. Plann. Manage., 127 (4), 214-223. doi:10.1061/(ASCE)0733-9496(2001)127:4(214)
    • (2001) J. Water Resour. Plann. Manage. , vol.127 , Issue.4 , pp. 214-223
    • Dandy, G.1    Engelhardt, M.2
  • 10
    • 0031845475 scopus 로고    scopus 로고
    • Selection and scheduling of rehabilitation alternatives for water distribution systems
    • doi:10.1029/98WR01281
    • Kleiner, Y., Adams, B. J., and, Rogers, J. S. (1998). " Selection and scheduling of rehabilitation alternatives for water distribution systems." Water Resour. Res., 34 (8), 2053-2061. doi:10.1029/98WR01281
    • (1998) Water Resour. Res. , vol.34 , Issue.8 , pp. 2053-2061
    • Kleiner, Y.1    Adams, B.J.2    Rogers, J.S.3
  • 11
    • 0037116469 scopus 로고    scopus 로고
    • Fund allocation model for pipe repair maintenance in water distribution networks
    • doi:10.1016/S0377-2217(01)00047-9
    • Luong, H., and, Fujiwara, O. (2002). " Fund allocation model for pipe repair maintenance in water distribution networks." Eur. J. Oper. Res., 136 (2), 403-421. doi:10.1016/S0377-2217(01)00047-9
    • (2002) Eur. J. Oper. Res. , vol.136 , Issue.2 , pp. 403-421
    • Luong, H.1    Fujiwara, O.2
  • 12
    • 0000701581 scopus 로고
    • Allocating funds for repair of leaky water distribution systems
    • Male, J., and, Franz, S. L. (1986). " Allocating funds for repair of leaky water distribution systems." TIMS Studies Manage. Sci., 22, 183-203.
    • (1986) TIMS Studies Manage. Sci. , vol.22 , pp. 183-203
    • Male, J.1    Franz, S.L.2
  • 13
  • 19
    • 0036921341 scopus 로고    scopus 로고
    • Forecasting variations and trends in water-main breaks
    • Rajani, B., and, Kleiner, Y. (2002). "Forecasting variations and trends in water-main breaks." J. Infrastruct. Syst., 8 (4), 122-131.
    • (2002) J. Infrastruct. Syst , vol.8 , Issue.4 , pp. 122-131
    • Rajani, B.1    Kleiner, Y.2
  • 21
    • 0030261394 scopus 로고    scopus 로고
    • Bridge management by dynamic programming and neural networks
    • doi:10.1139/l96-913
    • Razaqpur, A., Abd El Halim, A., and, Mohamed, H. (1996). " Bridge management by dynamic programming and neural networks." Can. J. Civ. Eng., 23 (5), 1064-1069. doi:10.1139/l96-913
    • (1996) Can. J. Civ. Eng. , vol.23 , Issue.5 , pp. 1064-1069
    • Razaqpur, A.1    Abd El Halim, A.2    Mohamed, H.3
  • 24
    • 0018318075 scopus 로고
    • An analytic approach to scheduling pipe replacement
    • Shamir, U., and, Howard, C. (1979). " An analytic approach to scheduling pipe replacement." J. AWWA, 71 (5), 248-258.
    • (1979) J. AWWA , vol.71 , Issue.5 , pp. 248-258
    • Shamir, U.1    Howard, C.2
  • 26
    • 84884609344 scopus 로고
    • Decision analysis for program evaluation, Ballinger Publishing, Cambridge, MA.
    • Thompson, S. M. (1982). Decision analysis for program evaluation, Ballinger Publishing, Cambridge, MA.
    • (1982)
    • Thompson, S.M.1
  • 27
    • 61849128422 scopus 로고    scopus 로고
    • Multiple criteria decision making, multi-attribute utility theory: Recent accomplishments and what lies ahead
    • doi:10.1287/mnsc.1070.0838
    • Wallenius, J., Dyer, J., Fishburn, P., Steuer, R., Zionts, S., and, Deb, K. (2008). " Multiple criteria decision making, multi-attribute utility theory: Recent accomplishments and what lies ahead." Manage. Sci., 54 (7), 1336-1349. doi:10.1287/mnsc.1070.0838
    • (2008) Manage. Sci. , vol.54 , Issue.7 , pp. 1336-1349
    • Wallenius, J.1    Dyer, J.2    Fishburn, P.3    Steuer, R.4    Zionts, S.5    Deb, K.6
  • 28
    • 0020098396 scopus 로고
    • Economic analysis of water main breaks
    • Walski, T., and, Pellicia, A. (1982). " Economic analysis of water main breaks." J. AWWA, 74 (3), 140-147.
    • (1982) J. AWWA , vol.74 , Issue.3 , pp. 140-147
    • Walski, T.1    Pellicia, A.2
  • 29
    • 83055184964 scopus 로고    scopus 로고
    • Study of the suitability of existing deterioration models for water mains
    • doi:10.1061/(ASCE)0887-3828(2009)23:1(40)
    • Wang, Y., Moselhi, O., and, Zayed, T. (2009a). "Study of the suitability of existing deterioration models for water mains." J. Perform. Constr. Facil., 23 (1), 40-46. doi:10.1061/(ASCE)0887-3828(2009)23:1(40)
    • (2009) J. Perform. Constr. Facil. , vol.23 , Issue.1 , pp. 40-46
    • Wang, Y.1    Moselhi, O.2    Zayed, T.3
  • 30
    • 83055184964 scopus 로고    scopus 로고
    • Prediction models for annual break rates of water mains
    • doi:10.1061/(ASCE)0887-3828(2009)23:1(47)
    • Wang, Y., Zayed, T., and, Moselhi, O. (2009b). " Prediction models for annual break rates of water mains." J. Perform. Constr. Facil., 23 (1), 47-54. doi:10.1061/(ASCE)0887-3828(2009)23:1(47)
    • (2009) J. Perform. Constr. Facil. , vol.23 , Issue.1 , pp. 47-54
    • Wang, Y.1    Zayed, T.2    Moselhi, O.3
  • 31
    • 79957610345 scopus 로고    scopus 로고
    • Recommendation mechanism based on multi-attribute utility theory.
    • Yang, H.-L., and, Yang, H.-F. (2011). "Recommendation mechanism based on multi-attribute utility theory." Int. J. Digital Content Technol. Applic., 5 (3), 373-382.
    • (2011) Int. J. Digital Content Technol. Applic. , vol.5 , Issue.3 , pp. 373-382
    • Yang, H.-L.1    Yang, H.-F.2
  • 32
    • 13944273226 scopus 로고    scopus 로고
    • Budget allocation for steel bridge paint maintenance
    • doi:10.1061/(ASCE)0887-3828(2004)18:1(36)
    • Zayed, T. (2004). "Budget allocation for steel bridge paint maintenance." J. Perform. Constr. Facil., 18 (1), 36-48. doi:10.1061/(ASCE)0887-3828(2004)18:1(36)
    • (2004) J. Perform. Constr. Facil. , vol.18 , Issue.1 , pp. 36-48
    • Zayed, T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.