메뉴 건너뛰기




Volumn , Issue , 2005, Pages 564-567

Status and first results from the upgraded pitz facility

(52)  Oppelt, A a   Abrahamyan, K a   Asova, G a   Bahr J a   Dimitrov, G a   Gensch, U a   Grabosch, H J a   Han, J H a   Khodyachykh, S a   Krasilnikov, M a   Liu, S a   Miltchev, V a   Petrosyan, B a   Riemann, S a   Staykov, L a   Stephan, F a   Hartrott, M v b   Jaeschke, E b   Kramer D b   Lipka, D b   more..

a DESY   (Germany)

Author keywords

[No Author keywords available]

Indexed keywords

AVERAGE POWER; BEAM LINES; COMMISSIONING PHASE; PHOTO-INJECTOR TEST;

EID: 84884639808     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (8)

References (9)
  • 4
    • 84885383876 scopus 로고    scopus 로고
    • Design of 10 MW L-band waveguide transmission line, technical design report
    • S.I. Sharamentov et al., Design of 10 MW L-Band Waveguide Transmission Line, Technical Design Report, PITZ internal report, 2000.
    • (2000) PITZ Internal Report
    • Sharamentov, S.I.1
  • 9
    • 84885385300 scopus 로고    scopus 로고
    • The normal conducting booster cavity development for photo injector test facility
    • V. Paramonov et al., The normal conducting booster cavity development for Photo Injector Test Facility, Technical Design Report, PITZ internal report, 2004.
    • (2004) Technical Design Report, PITZ Internal Report
    • Paramonov, V.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.