메뉴 건너뛰기




Volumn 5, Issue , 2012, Pages 611-618

Reasoning: Source of variability in the boothroyd and dewhurst assembly time estimation method

Author keywords

Assembly time; Design for assembly; Dfa; Dfm; Dfma; Information subjectivity

Indexed keywords

ASSEMBLY; DECISION MAKING; ESTIMATION; PROBABILITY DENSITY FUNCTION;

EID: 84884636496     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1115/DETC2012-71075     Document Type: Conference Paper
Times cited : (7)

References (24)
  • 1
    • 0036818783 scopus 로고    scopus 로고
    • Towards more strategic product design for manufacture and assembly: Priorities for concurrent engineering
    • Edwards K., 2002, "Towards More Strategic Product Design for Manufacture and Assembly: Priorities for Concurrent Engineering, " Materials & Design, 23(7), pp. 651-656.
    • (2002) Materials & Design , vol.23 , Issue.7 , pp. 651-656
    • Edwards, K.1
  • 2
    • 48349096480 scopus 로고    scopus 로고
    • Design for assembly
    • Khan Z., 2008, "Design for Assembly, " Assembly Automation, 28(3), pp. 200-206.
    • (2008) Assembly Automation , vol.28 , Issue.3 , pp. 200-206
    • Khan, Z.1
  • 3
    • 0000181823 scopus 로고    scopus 로고
    • Prototyping and design for assembly analysis using multimodal virtual environments
    • Gupta R., 1997, "Prototyping and Design for Assembly Analysis Using Multimodal Virtual Environments, " Computer-Aided Design, 29(8), pp. 585-597.
    • (1997) Computer-Aided Design , vol.29 , Issue.8 , pp. 585-597
    • Gupta, R.1
  • 4
    • 0030684915 scopus 로고    scopus 로고
    • Assembly sequence structures in design for assembly
    • (August)
    • Barnes C., Dalgleish G., and Jared G., 1997, "Assembly sequence structures in design for assembly, " Assembly and Task, (August), pp. 164-169.
    • (1997) Assembly and Task , pp. 164-169
    • Barnes, C.1    Dalgleish, G.2    Jared, G.3
  • 5
    • 0032599585 scopus 로고    scopus 로고
    • A computer-based intelligent system for design for assembly
    • Daabub A., 1999, "A Computer-Based Intelligent System for Design for Assembly, " Computers & Industrial Engineering, 37(1-2), pp. 111-115.
    • (1999) Computers & Industrial Engineering , vol.37 , Issue.1-2 , pp. 111-115
    • Daabub, A.1
  • 6
    • 0032795156 scopus 로고    scopus 로고
    • Design for manufacture and assembly on the internet
    • Huang G., 1999, "Design for manufacture and assembly on the Internet, " Computers in Industry, 38(1), pp. 17-30.
    • (1999) Computers in Industry , vol.38 , Issue.1 , pp. 17-30
    • Huang, G.1
  • 9
    • 0029252396 scopus 로고
    • A constraint network approach to design for assembly
    • Sik Oh J., O'Grady P., and Young R. E., 1995, "A Constraint Network Approach to Design for Assembly, " IIE Transactions, 27(1), pp. 72-80.
    • (1995) IIE Transactions , vol.27 , Issue.1 , pp. 72-80
    • Sik Oh, J.1    O'Grady, P.2    Young, R.E.3
  • 13
    • 84885418368 scopus 로고    scopus 로고
    • A survey report on implementation of design for assembly (dfa) in malaysian manufacturing industries
    • Sirat M., Tap M., Shaharoun M., and others, 2000, "A Survey Report on Implementation of Design for Assembly (DFA) in Malaysian Manufacturing Industries, " Jurnal Mekanikal, 1, pp. 60-75.
    • (2000) Jurnal Mekanikal , vol.1 , pp. 60-75
    • Sirat, M.1    Tap, M.2    Shaharoun, M.3
  • 15
    • 0032291425 scopus 로고    scopus 로고
    • A survey report on design for manufacture in the uk furniture manufacturing industry
    • Huang G. Q., 1998, "A survey report on design for manufacture in the UK furniture manufacturing industry, " Assembly, pp. 383-387.
    • (1998) Assembly , pp. 383-387
    • Huang, G.Q.1
  • 16
    • 0025546506 scopus 로고
    • Utilization of design for manufacturing (dfm) techniques
    • Management Through the Year 2000-Gaining the Competitive Advantage, 1990 IEEE International, IEEE
    • Dean B. V., and Salstrom R. L., 1990, "Utilization of design for manufacturing (DFM) techniques, " Engineering Management Conference, 1990. Management Through the Year 2000-Gaining the Competitive Advantage, 1990 IEEE International, IEEE, pp. 223-232.
    • (1990) Engineering Management Conference, 1990 , pp. 223-232
    • Dean, B.V.1    Salstrom, R.L.2
  • 19
    • 0022076352 scopus 로고
    • Programming optimal suggestions in the design concept phase: Application to the boothroyd assembly charts
    • Jakiela M., Papalambros P., and Ulsoy a. G., 1985, "Programming Optimal Suggestions in the Design Concept Phase: Application to the Boothroyd Assembly Charts, " Journal of Mechanisms Transmissions and Automation in Design, 107(2), p. 285.
    • (1985) Journal of Mechanisms Transmissions and Automation in Design , vol.107 , Issue.2 , pp. 285
    • Jakiela, M.1    Papalambros, P.2    Ulsoy, A.G.3
  • 20
    • 84951389654 scopus 로고    scopus 로고
    • The rationalization of quality in the construction industry
    • 93AD
    • Pheng L. S., 93AD, "The rationalization of quality in the construction industry:, " Construction Management & Economics, (4), p. 247.
    • Construction Management & Economics , Issue.4 , pp. 247
    • Pheng, L.S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.