메뉴 건너뛰기




Volumn , Issue , 2010, Pages 585-587

Real-time sampling and processing hardware for bunch arrival time monitors at FLASH and XFEL

Author keywords

[No Author keywords available]

Indexed keywords

EXCEPTION HANDLING; HIGH-SPEED LINKS; LASER PULSE AMPLITUDES; LASER PULSE TRAIN; ON-LINE CALIBRATION; OPTICAL SYNCHRONIZATION; PROCESSING HARDWARE; REAL-TIME SAMPLING;

EID: 84884625883     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (3)

References (4)
  • 1
    • 84884632576 scopus 로고    scopus 로고
    • Recent developments of the bunch arrival time monitor with femtosecond resolution at FLASH
    • IPAC2010, Kyoto, Japan, May
    • M.K. Bock et al., "Recent Developments of the Bunch Arrival Time Monitor with Femtosecond Resolution at FLASH", WEOCMH02, IPAC2010, Kyoto, Japan, May 2010
    • (2010) WEOCMH02
    • Bock, M.K.1
  • 2
    • 84884641615 scopus 로고    scopus 로고
    • Longitudinal bunch arrival time feedback at FLASH
    • Malmö, Sweden, August, THPA04
    • P. Gessler et al., "Longitudinal Bunch Arrival Time Feedback at FLASH", THPA04, FEL2010, Malmö, Sweden, August 2010
    • (2010) FEL2010
    • Gessler, P.1
  • 3
    • 84885376729 scopus 로고    scopus 로고
    • Xilinx, Application Note 225, http://www.xilinx.com/support/ documentation/application-notes/xapp225.pdf
    • Application Note , vol.225
  • 4
    • 84884658708 scopus 로고    scopus 로고
    • Intra-train longitudinal feedback for beam stabilization at FLASH
    • THOAI2, Malmö, Sweden, August
    • W. Koprek et al., "Intra-train Longitudinal Feedback for Beam Stabilization at FLASH", THOAI2, FEL2010, Malmö, Sweden, August 2010
    • (2010) FEL2010
    • Koprek, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.