-
1
-
-
34249990430
-
A fuzzy AHP approach to the determination of weights of evaluation factors in mechanism scheme evaluation process
-
2-s2.0-34249990430
-
Gu Y. K., Wu L. H., A fuzzy AHP approach to the determination of weights of evaluation factors in mechanism scheme evaluation process. China Mechanical Engineering 2007 18 5 1052 1067 2-s2.0-34249990430
-
(2007)
China Mechanical Engineering
, vol.18
, Issue.5
, pp. 1052-1067
-
-
Gu, Y.K.1
Wu, L.H.2
-
2
-
-
77953162158
-
Multicriteria renewable energy planning using an integrated fuzzy VIKOR & AHP methodology: The case of Istanbul
-
2-s2.0-77953162158 10.1016/j.energy.2010.02.051
-
Kaya T., Kahraman C., Multicriteria renewable energy planning using an integrated fuzzy VIKOR & AHP methodology: The case of Istanbul. Energy 2010 35 6 2517 2527 2-s2.0-77953162158 10.1016/j.energy.2010.02.051
-
(2010)
Energy
, vol.35
, Issue.6
, pp. 2517-2527
-
-
Kaya, T.1
Kahraman, C.2
-
3
-
-
84863169879
-
Research on comprehensive evaluation model of enterprise's technological innovation abilities based on VIKOR method
-
Kong F., Jia Y., Jia J., Research on comprehensive evaluation model of enterprise's technological innovation abilities based on VIKOR method. Technology Economics 2008 27 2 26 30
-
(2008)
Technology Economics
, vol.27
, Issue.2
, pp. 26-30
-
-
Kong, F.1
Jia, Y.2
Jia, J.3
-
4
-
-
0242269345
-
PROMETHEE and AHP: The design of operational synergies in multicriteria analysis - Strengthening PROMETHEE with ideas of AHP
-
2-s2.0-0242269345 10.1016/S0377-2217(03)00153-X
-
Macharis C., Springael J., de Brucker K., Verbeke A., PROMETHEE and AHP: the design of operational synergies in multicriteria analysis-strengthening PROMETHEE with ideas of AHP. European Journal of Operational Research 2004 153 2 307 317 2-s2.0-0242269345 10.1016/S0377-2217(03)00153-X
-
(2004)
European Journal of Operational Research
, vol.153
, Issue.2
, pp. 307-317
-
-
Macharis, C.1
Springael, J.2
De Brucker, K.3
Verbeke, A.4
-
5
-
-
1442283191
-
Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS
-
2-s2.0-1442283191 10.1016/S0377-2217(03)00020-1
-
Opricovic S., Tzeng G.-H., Compromise solution by MCDM methods: a comparative analysis of VIKOR and TOPSIS. European Journal of Operational Research 2004 156 2 445 455 2-s2.0-1442283191 10.1016/S0377-2217(03)00020-1
-
(2004)
European Journal of Operational Research
, vol.156
, Issue.2
, pp. 445-455
-
-
Opricovic, S.1
Tzeng, G.-H.2
-
6
-
-
33751011060
-
Extended VIKOR method in comparison with outranking methods
-
2-s2.0-33751011060 10.1016/j.ejor.2006.01.020
-
Opricovic S., Tzeng G.-H., Extended VIKOR method in comparison with outranking methods. European Journal of Operational Research 2007 178 2 514 529 2-s2.0-33751011060 10.1016/j.ejor.2006.01.020
-
(2007)
European Journal of Operational Research
, vol.178
, Issue.2
, pp. 514-529
-
-
Opricovic, S.1
Tzeng, G.-H.2
-
7
-
-
58649090867
-
Extension of VIKOR method for decision making problem with interval numbers
-
2-s2.0-58649090867 10.1016/j.apm.2008.06.002
-
Sayadi M. K., Heydari M., Shahanaghi K., Extension of VIKOR method for decision making problem with interval numbers. Applied Mathematical Modelling 2009 33 5 2257 2262 2-s2.0-58649090867 10.1016/j.apm.2008.06.002
-
(2009)
Applied Mathematical Modelling
, vol.33
, Issue.5
, pp. 2257-2262
-
-
Sayadi, M.K.1
Heydari, M.2
Shahanaghi, K.3
-
8
-
-
36148947128
-
Using AHP and TOPSIS approaches in customer-driven product design process
-
2-s2.0-36148947128 10.1016/j.compind.2007.05.013
-
Lin M.-C., Wang C.-C., Chen M.-S., Chang C. A., Using AHP and TOPSIS approaches in customer-driven product design process. Computers in Industry 2008 59 1 17 31 2-s2.0-36148947128 10.1016/j.compind.2007.05.013
-
(2008)
Computers in Industry
, vol.59
, Issue.1
, pp. 17-31
-
-
Lin, M.-C.1
Wang, C.-C.2
Chen, M.-S.3
Chang, C.A.4
-
9
-
-
33845571095
-
An extension of TOPSIS for group decision making
-
2-s2.0-33845571095 10.1016/j.mcm.2006.03.023
-
Shih H.-S., Shyur H.-J., Lee E. S., An extension of TOPSIS for group decision making. Mathematical and Computer Modelling 2007 45 7-8 801 813 2-s2.0-33845571095 10.1016/j.mcm.2006.03.023
-
(2007)
Mathematical and Computer Modelling
, vol.45
, Issue.7-8
, pp. 801-813
-
-
Shih, H.-S.1
Shyur, H.-J.2
Lee, E.S.3
-
10
-
-
0036569875
-
Multicriteria planning of post-earthquake sustainable reconstruction
-
2-s2.0-0036569875
-
Opricovic S., Tzeng G.-H., Multicriteria planning of post-earthquake sustainable reconstruction. Computer-Aided Civil and Infrastructure Engineering 2002 17 3 211 220 2-s2.0-0036569875
-
(2002)
Computer-Aided Civil and Infrastructure Engineering
, vol.17
, Issue.3
, pp. 211-220
-
-
Opricovic, S.1
Tzeng, G.-H.2
-
12
-
-
0016102310
-
A projection pursuit algorithm for exploratory data analysis
-
2-s2.0-0016102310
-
Friedman J. H., Turkey J. W., A projection pursuit algorithm for exploratory data analysis. IEEE Transactions on Computers 1974 23 9 881 890 2-s2.0-0016102310
-
(1974)
IEEE Transactions on Computers
, vol.23
, Issue.9
, pp. 881-890
-
-
Friedman, J.H.1
Turkey, J.W.2
-
14
-
-
57149123339
-
Dominance-based multiobjective simulated annealing
-
2-s2.0-57149123339 10.1109/TEVC.2007.904345
-
Smith K. I., Everson R. M., Fieldsend J. E., Murphy C., Misra R., Dominance-based multiobjective simulated annealing. IEEE Transactions on Evolutionary Computation 2008 12 3 323 342 2-s2.0-57149123339 10.1109/TEVC.2007.904345
-
(2008)
IEEE Transactions on Evolutionary Computation
, vol.12
, Issue.3
, pp. 323-342
-
-
Smith, K.I.1
Everson, R.M.2
Fieldsend, J.E.3
Murphy, C.4
Misra, R.5
-
15
-
-
84861145571
-
Robustness analysis method of PROMETHEE weights with incomplete information
-
Sun S. Y., Wang H. Y., Qiu Z. M., Robustness analysis method of PROMETHEE weights with incomplete information. Command Control & Simulation 2007 29 1 47 49
-
(2007)
Command Control & Simulation
, vol.29
, Issue.1
, pp. 47-49
-
-
Sun, S.Y.1
Wang, H.Y.2
Qiu, Z.M.3
-
16
-
-
0020702683
-
How to select and how to rank projects: The Promethee method
-
2-s2.0-0020702683
-
Brans J. P., Vincke P., Mareschal B., How to select and how to rank projects: the Promethee method. European Journal of Operational Research 1986 24 2 228 238 2-s2.0-0020702683
-
(1986)
European Journal of Operational Research
, vol.24
, Issue.2
, pp. 228-238
-
-
Brans, J.P.1
Vincke, P.2
Mareschal, B.3
-
17
-
-
0000372281
-
A preference ranking organization method: The PROMETHEE method
-
Brans J. P., Vike P., A preference ranking organization method: the PROMETHEE method. Management Science 1985 31 647 656
-
(1985)
Management Science
, vol.31
, pp. 647-656
-
-
Brans, J.P.1
Vike, P.2
-
18
-
-
12444302322
-
Objective combined evaluation model for optimizing water resource engineering schemes
-
2-s2.0-12444302322
-
Jin J.-L., Wang M.-W., Wei Y.-M., Objective combined evaluation model for optimizing water resource engineering schemes. System Engineering Theory and Practice 2004 24 12 111 116 2-s2.0-12444302322
-
(2004)
System Engineering Theory and Practice
, vol.24
, Issue.12
, pp. 111-116
-
-
Jin, J.-L.1
Wang, M.-W.2
Wei, Y.-M.3
|