메뉴 건너뛰기




Volumn 4, Issue 3, 2013, Pages 231-240

Implementation of performance based maintenance contracting in railway industries

Author keywords

Outcome indicators; Outsourcing; Performance based railway infrastructure maintenance; Performance measurement

Indexed keywords

INFRASTRUCTURE AS A SERVICE (IAAS); OUTSOURCING; RAILROAD TRANSPORTATION; RAILROADS;

EID: 84883511538     PISSN: 09756809     EISSN: 09764348     Source Type: Journal    
DOI: 10.1007/s13198-013-0167-4     Document Type: Article
Times cited : (12)

References (32)
  • 2
    • 77950493163 scopus 로고    scopus 로고
    • The Swedish railway deregulation path
    • 10.2202/1446-9022.1136
    • Alexandersson G, Hultén S (2008) The Swedish railway deregulation path. Rev Netw Econ 7(1):2
    • (2008) Rev Netw Econ , vol.7 , Issue.1 , pp. 2
    • Alexandersson, G.1    Hultén, S.2
  • 3
    • 0034147463 scopus 로고    scopus 로고
    • Outsourcing services: The contract is just the beginning
    • 10.1016/S0007-6813(00)88558-4
    • Allen S (2000) Outsourcing services: the contract is just the beginning. Bus Horizons 43(2):25
    • (2000) Bus Horizons , vol.43 , Issue.2 , pp. 25
    • Allen, S.1
  • 5
    • 3543129537 scopus 로고    scopus 로고
    • Integrated performance measurement systems: A development guide
    • 10.1108/01443579710167230
    • Bititci US (1997) Integrated performance measurement systems: a development guide. Int J Operations Prod Manag 17(5):522-534
    • (1997) Int J Operations Prod Manag , vol.17 , Issue.5 , pp. 522-534
    • Bititci, U.S.1
  • 7
    • 0008687770 scopus 로고
    • Outsourcing in maintenance management: A valid alternative to self-provision
    • 10.1108/13552519510096369
    • Campbell JD (1995) Outsourcing in maintenance management: a valid alternative to self-provision. J Qual Maintenance Eng 1(3):18-24
    • (1995) J Qual Maintenance Eng , vol.1 , Issue.3 , pp. 18-24
    • Campbell, J.D.1
  • 8
    • 0032172080 scopus 로고    scopus 로고
    • Outsourcing decisions and managerial incentives
    • 10.1111/j.1540-5915.1998.tb00881.x
    • Chalos P (1998) Outsourcing decisions and managerial incentives. Decis Sci 29(4):901
    • (1998) Decis Sci , vol.29 , Issue.4 , pp. 901
    • Chalos, P.1
  • 11
    • 84883511479 scopus 로고    scopus 로고
    • European Committee for Standardization (CEN) European Standard 2010
    • European Committee for Standardization (CEN) (2010) "Maintenance terminology: EN 13306," European Standard 2010
    • (2010) Maintenance Terminology: En 13306
  • 13
    • 84883492148 scopus 로고    scopus 로고
    • Maintenance organisation
    • M. Ben-Daya S.O. Duffuaa A. Raouf J. Knezevic D. Ait-Kadi (eds) Springer London
    • Haroun AE, Duffuaa SO (2009) Maintenance organisation. In: Ben-Daya M, Duffuaa SO, Raouf A, Knezevic J, Ait-Kadi D (eds) Handbook of maintenance management and engineering. Springer, London, pp 479-498
    • (2009) Handbook of Maintenance Management and Engineering , pp. 479-498
    • Haroun, A.E.1    Duffuaa, S.O.2
  • 15
    • 26644462414 scopus 로고    scopus 로고
    • Outsourcing: Current and future trends
    • 10.1002/tie.20048
    • Kakabadse A (2005) Outsourcing: current and future trends. Thunderbird Int Bus Rev 47(2):183
    • (2005) Thunderbird Int Bus Rev , vol.47 , Issue.2 , pp. 183
    • Kakabadse, A.1
  • 16
    • 54349116635 scopus 로고    scopus 로고
    • Transforming the balanced scorecard from performance measurement to strategic management: Part 1
    • 1099.90593 10.2308/acch.2001.15.1.87
    • Kaplan RS, Norton DP (2001) Transforming the balanced scorecard from performance measurement to strategic management: part 1. Account Horizons 15(1):87-104
    • (2001) Account Horizons , vol.15 , Issue.1 , pp. 87-104
    • Kaplan, R.S.1    Norton, D.P.2
  • 17
    • 84861377434 scopus 로고    scopus 로고
    • System maintenance: Trends in management and technology
    • K.B. Misra (eds) Springer London 10.1007/978-1-84800-131-2-47
    • Kumar U (2008) System maintenance: trends in management and technology. In: Misra KB (ed) Handbook on performability engineering. Springer, London, pp 773-787
    • (2008) Handbook on Performability Engineering , pp. 773-787
    • Kumar, U.1
  • 18
    • 84951817581 scopus 로고    scopus 로고
    • Maintenance performance measurement (MPM) system
    • K.A.H. Kobbacy D.N. Murthy (eds) Springer London 10.1007/978-1-84800-011- 7-19
    • Kumar U, Parida A (2008) Maintenance performance measurement (MPM) system. In: Kobbacy KAH, Murthy DNP (eds) Complex system maintenance handbook. Springer, London, pp 459-478
    • (2008) Complex System Maintenance Handbook , pp. 459-478
    • Kumar, U.1    Parida, A.2
  • 19
    • 0036540669 scopus 로고    scopus 로고
    • Making maintenance contracts perform
    • Levery M (2002) Making maintenance contracts perform. Eng Manag J 12(2):78-82
    • (2002) Eng Manag J , vol.12 , Issue.2 , pp. 78-82
    • Levery, M.1
  • 20
    • 3142569036 scopus 로고    scopus 로고
    • Insourcing maintenance: From railtrack to network rail
    • 10.1049/em:20040308
    • Levery M (2004) Insourcing maintenance: from railtrack to network rail. Eng Manag J 14(3):38-41
    • (2004) Eng Manag J , vol.14 , Issue.3 , pp. 38-41
    • Levery, M.1
  • 21
    • 0030717183 scopus 로고    scopus 로고
    • Contracting out maintenance and a plan for future research
    • 10.1108/13552519710167700
    • Martin H (1997) Contracting out maintenance and a plan for future research. J Qual Maintenance Eng 3(2):81-90
    • (1997) J Qual Maintenance Eng , vol.3 , Issue.2 , pp. 81-90
    • Martin, H.1
  • 24
    • 28344438887 scopus 로고    scopus 로고
    • Performance measurement system design: A literature review and research agenda
    • 10.1108/01443570510633639
    • Neely A (2005) Performance measurement system design: a literature review and research agenda. Int J Operations Prod Manag 25(12):1228
    • (2005) Int J Operations Prod Manag , vol.25 , Issue.12 , pp. 1228
    • Neely, A.1
  • 25
    • 65449137908 scopus 로고    scopus 로고
    • Use of availability concepts in the railway system
    • Nyström B (2009) Use of availability concepts in the railway system. Int J Performability Eng 5(2):103-118
    • (2009) Int J Performability Eng , vol.5 , Issue.2 , pp. 103-118
    • Nyström, B.1
  • 26
    • 9144225524 scopus 로고    scopus 로고
    • Part I. A framework of partnering for infrastructure maintenance
    • 10.1108/13552510410564855
    • Olsson U, Espling U (2004) Part I. A framework of partnering for infrastructure maintenance. J Qual Maintenance Eng 10(4):234-247
    • (2004) J Qual Maintenance Eng , vol.10 , Issue.4 , pp. 234-247
    • Olsson, U.1    Espling, U.2
  • 28
    • 78449252532 scopus 로고    scopus 로고
    • Performance-based contracting for preservation and improvement of road assets
    • TN-27 2005
    • Stankevich N, Qureshi N, Queiroz C (2005) Performance-based contracting for preservation and improvement of road assets, Transport Note, vol TN-27 2005
    • (2005) Transport Note
    • Stankevich, N.1    Qureshi, N.2    Queiroz, C.3
  • 30
    • 84993097128 scopus 로고    scopus 로고
    • Performance-based maintenance partnering: A promising concept
    • 10.1108/14725960710751870
    • Straub A (2007) Performance-based maintenance partnering: a promising concept. J Facil Manag 5(2):129
    • (2007) J Facil Manag , vol.5 , Issue.2 , pp. 129
    • Straub, A.1
  • 31
    • 0041902156 scopus 로고    scopus 로고
    • The purchasing of full-service contracts: An exploratory study within the industrial maintenance market
    • 10.1016/S0019-8501(99)00090-5
    • Stremersch S, Wuyts S, Frambach RT (2001) The purchasing of full-service contracts: an exploratory study within the industrial maintenance market. Ind Mark Manag 30(1):1-12
    • (2001) Ind Mark Manag , vol.30 , Issue.1 , pp. 1-12
    • Stremersch, S.1    Wuyts, S.2    Frambach, R.T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.