메뉴 건너뛰기




Volumn 1, Issue , 2012, Pages 28-35

Using parallel computing to increase the speed of water distribution network optimization

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL POWER; ENGINEERING PROBLEMS; HIGH PERFORMANCE COMPUTING; MESSAGE PASSING INTERFACE; NON DOMINATED SORTING GENETIC ALGORITHM II (NSGA II); OPTIMAL REHABILITATION; OPTIMIZATION FRAMEWORK; WATER DISTRIBUTION NETWORKS;

EID: 84883116299     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (4)

References (11)
  • 1
    • 70350423302 scopus 로고    scopus 로고
    • Multiobjective optimization of rehabilitation and leakage detection scheduling in water distribution systems
    • Alvisi S., Franchini M., (2009) "Multiobjective Optimization of Rehabilitation and Leakage Detection Scheduling in Water Distribution Systems", Journal of water resources planning and management, 135(6): 426-436.
    • (2009) Journal of Water Resources Planning and Management , vol.135 , Issue.6 , pp. 426-436
    • Alvisi, S.1    Franchini, M.2
  • 4
    • 84883100250 scopus 로고    scopus 로고
    • Dramatically improve compute-intense applications in the supercomputing cloud
    • Juethner, K., (2011) "Dramatically Improve Compute-Intense Applications in the Supercomputing Cloud", White paper, COMSOL Inc.
    • (2011) White Paper, COMSOL Inc.
    • Juethner, K.1
  • 5
    • 60449107703 scopus 로고    scopus 로고
    • Optimize managed code for multi-core machines
    • Issue 2007 Oct
    • Leijen D., Hall J., (2007) "Optimize Managed Code For Multi-Core Machines", D, MSDN Magazine Issue 2007 Oct.
    • (2007) D, MSDN Magazine
    • Leijen, D.1    Hall, J.2
  • 7
    • 84859341205 scopus 로고    scopus 로고
    • Evaluating the impact of climate change mitigation strategies on the optimal design and expansion of the amherstview, ontario water network: A canadian case study
    • ASCE
    • Roshani, E., MacLeod, S.P., Filion, Y.R. (2012) "Evaluating the Impact of Climate Change Mitigation Strategies on the Optimal Design and Expansion of the Amherstview, Ontario Water Network: A Canadian Case Study" Journal of Water Resources Planning and Management, ASCE, Vol 138, Issue 2, P 100-110.
    • (2012) Journal of Water Resources Planning and Management , vol.138 , Issue.2 , pp. 100-110
    • Roshani, E.1    MacLeod, S.P.2    Filion, Y.R.3
  • 10
    • 0018318075 scopus 로고
    • An analytic approach to scheduling pipe replacement
    • Shamir, U., Howard, C. D. D., (1979), "An analytic approach to scheduling pipe replacement." J. Am. Water Works Assoc., 71(5), 248-258.
    • (1979) J. Am. Water Works Assoc. , vol.71 , Issue.5 , pp. 248-258
    • Shamir, U.1    Howard, C.D.D.2
  • 11
    • 0024108254 scopus 로고
    • Predicting internal roughness in water mains
    • Sharp, W. W., Walski, T. M., (1988), "Predicting internal roughness in water mains", J. Am. Water Works Assoc., 80(11), 34-40.
    • (1988) J. Am. Water Works Assoc. , vol.80 , Issue.11 , pp. 34-40
    • Sharp, W.W.1    Walski, T.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.