-
1
-
-
0032099143
-
Techniques for the analysis of risks in major projects
-
Baker S., Ponniah D., Smith S., (1998), Techniques for the analysis of risks in major projects, The Journal of the Operational Research Society, 49, 567-572.
-
(1998)
The Journal of the Operational Research Society
, vol.49
, pp. 567-572
-
-
Baker, S.1
Ponniah, D.2
Smith, S.3
-
2
-
-
0037840504
-
Risk analysis techniques and their application to software development
-
Bennett J.C., Bohoris G.A., Aspinwall E.M., Hall R.C., (1996), Risk analysis techniques and their application to software development, European Journal of the Operational Research, 95, 467-470.
-
(1996)
European Journal of the Operational Research
, vol.95
, pp. 467-470
-
-
Bennett, J.C.1
Bohoris, G.A.2
Aspinwall, E.M.3
Hall, R.C.4
-
3
-
-
0020588645
-
Risk engineering basic controlled interval and memory models
-
Chapman C.B., Cooper D.F., (1983), Risk engineering basic controlled interval and memory models, The Journal of the Operational Research Society, 134, 51-60.
-
(1983)
The Journal of the Operational Research Society
, vol.134
, pp. 51-60
-
-
Chapman, C.B.1
Cooper, D.F.2
-
4
-
-
0344267707
-
Contractual risk and liability sharing in hydropower construction
-
Charoenngam C., Yeh C.Y., (1999), Contractual risk and liability sharing in hydropower construction, International Journal of Project Management,17, 29-37.
-
(1999)
International Journal of Project Management
, vol.17
, pp. 29-37
-
-
Charoenngam, C.1
Yeh, C.Y.2
-
5
-
-
0041639624
-
Risk analysis in investment appraisal based on the Monte Carlo simulation technique
-
Hacura A., Hacura M.J., Kocot A., (2001), Risk analysis in investment appraisal based on the Monte Carlo simulation technique, European Physical Journal B, 20, 551-553.
-
(2001)
European Physical Journal B
, vol.20
, pp. 551-553
-
-
Hacura, A.1
Hacura, M.J.2
Kocot, A.3
-
6
-
-
4444264437
-
Large scale particle image velocimetry for low velocity and shallow water flows
-
Meselhe E., Peeva T., Muste M., (2004), Large scale particle image velocimetry for low velocity and shallow water flows, Journal of Hydraulic Engineering, 130, 937-940.
-
(2004)
Journal of Hydraulic Engineering
, vol.130
, pp. 937-940
-
-
Meselhe, E.1
Peeva, T.2
Muste, M.3
-
7
-
-
0026106979
-
Project risk assessment using the analytic hierarchy process
-
Mustafa M.A., Al-Bahar J.F., (1991), Project risk assessment using the analytic hierarchy process, IEEE Transaction on Engineering Management, 38, 46-52.
-
(1991)
IEEE Transaction on Engineering Management
, vol.38
, pp. 46-52
-
-
Mustafa, M.A.1
Al-Bahar, J.F.2
-
8
-
-
77953281230
-
Wastewater ecotreatment system and its application (in Chinese)
-
Sun T.-h., Zhou Q.-x, Zhang K.-s, (2002), Wastewater ecotreatment system and its application (in Chinese), Water Resources Protection, 3, 6-9.
-
(2002)
Water Resources Protection
, vol.3
, pp. 6-9
-
-
Sun, T.-H.1
Zhou, Q.-X.2
Zhang, K.-S.3
-
9
-
-
0004211845
-
-
(in Chinese), Dalian University of Technology Press, Dalian, China
-
Teng S.-z., Jiang B.-w., Ren Y.-j., (1996), Statistics (in Chinese), Dalian University of Technology Press, Dalian, China.
-
(1996)
Statistics
-
-
Teng, S.-Z.1
Jiang, B.-W.2
Ren, Y.-J.3
-
10
-
-
84891722481
-
Major water conservancy and hydropower project operation risk analysis method dilapidated
-
Wu Z.-r., Su H., (2008), Major water conservancy and hydropower project operation risk analysis method dilapidated, Chinese Science E Series, 38, 1391-1397.
-
(2008)
Chinese Science E Series
, vol.38
, pp. 1391-1397
-
-
Wu, Z.-R.1
Su, H.2
|