|
Volumn 2, Issue 1, 2011, Pages 47-54
|
Integration, commissioning and operation of solar steam generator 4 at Kimberlina
|
Author keywords
[No Author keywords available]
|
Indexed keywords
ENGINES;
INSURANCE;
INTEGRATION;
MODEL PREDICTIVE CONTROL;
PLANT SHUTDOWNS;
PREDICTIVE CONTROL SYSTEMS;
REFLECTION;
SOFTWARE TESTING;
SOLAR HEATING;
STEAM;
STEAM POWER PLANTS;
THERMOELECTRIC POWER PLANTS;
TUBES (COMPONENTS);
TURBOGENERATORS;
WASTE HEAT;
BOILER TUBES;
MODEL-PREDICTIVE CONTROL;
ONCE THROUGH;
PERFORMANCE TESTS;
SOLAR STEAM;
SOLAR THERMAL POWER;
SOLAR THERMAL SYSTEMS;
SUPERHEATED STEAM;
THERMAL POWER STATIONS;
TUBE BUNDLE;
BOILERS;
|
EID: 84882600470
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1115/POWER2011-55193 Document Type: Conference Paper |
Times cited : (2)
|
References (2)
|