-
1
-
-
52149114233
-
Modeling and optimizing sequential imperfect preventive maintenance
-
Bartholomew-Biggs, M., Zuo, M. J., and, Li, X. 2009. Modeling and Optimizing Sequential Imperfect Preventive Maintenance. Reliability Engineering and System Safety, 94 (1): 53-62.
-
(2009)
Reliability Engineering and System Safety
, vol.94
, Issue.1
, pp. 53-62
-
-
Bartholomew-Biggs, M.1
Zuo, M.J.2
Li, X.3
-
3
-
-
79551541618
-
Optimal variability sensitive condition-based maintenance with a cox ph model
-
Chen, N., Chen, Y., Li, Z. G., Zhou, S. Y., and, Sievenpiper, C. 2011. Optimal Variability Sensitive Condition-based Maintenance with a Cox PH Model. International Journal of Production Research, 49 (7): 2083-2100.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.7
, pp. 2083-2100
-
-
Chen, N.1
Chen, Y.2
Li, Z.G.3
Zhou, S.Y.4
Sievenpiper, C.5
-
4
-
-
1642601903
-
Classes of imperfect repair models based on reduction of failure intensity or virtual age
-
Doyen, L., and, Gaudoin, O. 2004. Classes of Imperfect Repair Models based on Reduction of Failure Intensity or Virtual Age. Reliability Engineering and System Safety, 84 (1): 45-56.
-
(2004)
Reliability Engineering and System Safety
, vol.84
, Issue.1
, pp. 45-56
-
-
Doyen, L.1
Gaudoin, O.2
-
5
-
-
28944449352
-
Selection and validation of predictive regression and neural network models based on designed experiments
-
Feng, C. X. J., Yu, Z. G., and, Kusiak, A. 2006. Selection and Validation of Predictive Regression and Neural Network Models based on Designed Experiments. IIE Transactions, 38 (1): 13-23.
-
(2006)
IIE Transactions
, vol.38
, Issue.1
, pp. 13-23
-
-
Feng, C.X.J.1
Yu, Z.G.2
Kusiak, A.3
-
6
-
-
0026837810
-
Cost optimization of maintenance scheduling for a system with assured reliability
-
Jayabalan, V., and, Chaudhuri, D. 1992. Cost Optimization of Maintenance Scheduling for a System with Assured Reliability. IEEE Transactions on Reliability, 41 (1): 21-25.
-
(1992)
IEEE Transactions on Reliability
, vol.41
, Issue.1
, pp. 21-25
-
-
Jayabalan, V.1
Chaudhuri, D.2
-
7
-
-
84865507155
-
Life cycle environmental impact assessment of a solar water heater
-
Koroneos, C. J., and, Nanaki, E. A. 2012. Life Cycle Environmental Impact Assessment of a Solar Water Heater. Journal of Cleaner Production, 37: 154-161.
-
(2012)
Journal of Cleaner Production
, vol.37
, pp. 154-161
-
-
Koroneos, C.J.1
Nanaki, E.A.2
-
8
-
-
0034197692
-
An annotated overview of system-reliability optimization
-
Kuo, W., and, Prasad, V. R. 2000. An Annotated Overview of System-reliability Optimization. IEEE Transactions on Reliability, 49 (2): 176-187.
-
(2000)
IEEE Transactions on Reliability
, vol.49
, Issue.2
, pp. 176-187
-
-
Kuo, W.1
Prasad, V.R.2
-
10
-
-
33746216902
-
Intelligent prognostics tools and e-maintenance
-
Lee, J., Ni, J., Djurdjanovic, D., Qiu, H., and, Liao, H. 2006. Intelligent Prognostics Tools and E-Maintenance. Computers in Industry, 57: 476-489.
-
(2006)
Computers in Industry
, vol.57
, pp. 476-489
-
-
Lee, J.1
Ni, J.2
Djurdjanovic, D.3
Qiu, H.4
Liao, H.5
-
11
-
-
74549209598
-
Plant-level maintenance decision support system for throughput improvement
-
Li, L., Ambani, S., and, Ni, J. 2009. Plant-level Maintenance Decision Support System for Throughput Improvement. International Journal of Production Research, 47 (24): 7047-7061.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.24
, pp. 7047-7061
-
-
Li, L.1
Ambani, S.2
Ni, J.3
-
12
-
-
78650180260
-
Preventive maintenance scheduling for repairable system with deterioration
-
Liao, W., Pan, E., and, Xi, L. 2010. Preventive Maintenance Scheduling for Repairable System with Deterioration. Journal of Intelligent Manufacturing, 21 (6): 875-884.
-
(2010)
Journal of Intelligent Manufacturing
, vol.21
, Issue.6
, pp. 875-884
-
-
Liao, W.1
Pan, E.2
Xi, L.3
-
13
-
-
78650623486
-
Hybrid flowshop scheduling with batch-discrete processors and machine maintenance in time windows
-
Luo, H., Huang, G. Q., Zhang, Y. F., and, Dai, Q. Y. 2011. Hybrid Flowshop Scheduling with Batch-discrete Processors and Machine Maintenance in Time Windows. International Journal of Production Research, 49 (6): 1575-1603.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.6
, pp. 1575-1603
-
-
Luo, H.1
Huang, G.Q.2
Zhang, Y.F.3
Dai, Q.Y.4
-
14
-
-
0018517702
-
Reliable preventive maintenance policy
-
Malik, M. A. K. 1979. Reliable Preventive Maintenance Policy. IIE Transactions, 11 (3): 221-228.
-
(1979)
IIE Transactions
, vol.11
, Issue.3
, pp. 221-228
-
-
Malik, M.A.K.1
-
15
-
-
0033117187
-
Age-dependent reliability model considering effects of maintenance and working conditions
-
Martorell, S., Sanchez, A., and, Serradell, V. 1999. Age-dependent Reliability Model Considering Effects of Maintenance and Working Conditions. Reliability Engineering and System Safety, 64 (1): 19-31.
-
(1999)
Reliability Engineering and System Safety
, vol.64
, Issue.1
, pp. 19-31
-
-
Martorell, S.1
Sanchez, A.2
Serradell, V.3
-
17
-
-
80052413369
-
Reliability and availability analysis of a repairable k-out-of-n: G system with r repairmen subject to shut-off rules
-
Moghaddass, R., Zuo, M. J., and, Qu, J. 2011. Reliability and Availability Analysis of a Repairable k-out-of-n: G System with R Repairmen Subject to Shut-off Rules. IEEE Transactions on Reliability, 60 (3): 658-666.
-
(2011)
IEEE Transactions on Reliability
, vol.60
, Issue.3
, pp. 658-666
-
-
Moghaddass, R.1
Zuo, M.J.2
Qu, J.3
-
18
-
-
77955691762
-
Empirical analysis of maintenance performance measurement in belgian industries
-
Muchiri, P. N., Pintelon, L., Martin, H., and, De Meyer, A. M. 2010. Empirical Analysis of Maintenance Performance Measurement in Belgian Industries. International Journal of Production Research, 48 (20): 5905-5924.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.20
, pp. 5905-5924
-
-
Muchiri, P.N.1
Pintelon, L.2
Martin, H.3
De Meyer, A.M.4
-
19
-
-
0024054513
-
Sequential imperfect preventive maintenance policies
-
Nakagawa, T. 1988. Sequential Imperfect Preventive Maintenance Policies. IEEE Transactions on Reliability, 37 (3): 295-298.
-
(1988)
IEEE Transactions on Reliability
, vol.37
, Issue.3
, pp. 295-298
-
-
Nakagawa, T.1
-
20
-
-
79953815017
-
Preventive maintenance and replacement policies for deteriorating production systems subject to imperfect repairs
-
Nodem, F. I. D., Gharbi, A., and, Kenne, J. P. 2011. Preventive Maintenance and Replacement Policies for Deteriorating Production Systems Subject to Imperfect Repairs. International Journal of Production Research, 49 (12): 3543-3563.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.12
, pp. 3543-3563
-
-
Nodem, F.I.D.1
Gharbi, A.2
Kenne, J.P.3
-
21
-
-
49249096459
-
Transient analysis of maintenance intervention of continuous multi-unit systems
-
Okogbaa, O. G., Otieno, W., Peng, X., and, Jain, S. 2008. Transient Analysis of Maintenance Intervention of Continuous Multi-unit Systems. IIE Transactions, 40 (10): 971-983.
-
(2008)
IIE Transactions
, vol.40
, Issue.10
, pp. 971-983
-
-
Okogbaa, O.G.1
Otieno, W.2
Peng, X.3
Jain, S.4
-
22
-
-
0030575689
-
Imperfect maintenance
-
Pham, H., and, Wang, H. 1996. Imperfect Maintenance. European Journal of Operational Research, 94 (3): 425-438.
-
(1996)
European Journal of Operational Research
, vol.94
, Issue.3
, pp. 425-438
-
-
Pham, H.1
Wang, H.2
-
23
-
-
38749086074
-
Preventive maintenance and upgrade system: Optimizing the whole performance system by components replacement or rearrangement
-
Rachaniotis, N. P., and, Pappis, C. P. 2008. Preventive Maintenance and Upgrade System: Optimizing the Whole Performance System by Components Replacement or Rearrangement. International Journal of Production Economics, 112 (1): 236-244.
-
(2008)
International Journal of Production Economics
, vol.112
, Issue.1
, pp. 236-244
-
-
Rachaniotis, N.P.1
Pappis, C.P.2
-
24
-
-
34047122539
-
Considering scheduling and preventive maintenance in the flowshop sequencing problem
-
Ruiz, R., García-Díaz, J. C., and, Maroto, C. 2007. Considering Scheduling and Preventive Maintenance in the Flowshop Sequencing Problem. Computers and Operations Research, 34: 3314-3330.
-
(2007)
Computers and Operations Research
, vol.34
, pp. 3314-3330
-
-
Ruiz, R.1
García-Díaz, J.C.2
Maroto, C.3
-
25
-
-
77951099765
-
Impact of the use-based maintenance policy on the performance of cellular manufacturing systems
-
Safaei, N., Banjevic, D., and, Jardine, A. K. S. 2010. Impact of the Use-based Maintenance Policy on the Performance of Cellular Manufacturing Systems. International Journal of Production Research, 48 (8): 2233-2260.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.8
, pp. 2233-2260
-
-
Safaei, N.1
Banjevic, D.2
Jardine, A.K.S.3
-
26
-
-
2142714506
-
A study of availability-centered preventive maintenance for multi-component systems
-
Tsai, Y. T., Wang, K. S., and, Tsai, L. C. 2004. A Study of Availability-centered Preventive Maintenance for Multi-component Systems. Reliability Engineering and System Safety, 84 (3): 261-270.
-
(2004)
Reliability Engineering and System Safety
, vol.84
, Issue.3
, pp. 261-270
-
-
Tsai, Y.T.1
Wang, K.S.2
Tsai, L.C.3
-
27
-
-
0031163852
-
A dynamic policy for grouping maintenance activities
-
Wildeman, R. E., Dekker, R., and, Smit, A. C. J. M. 1997. A Dynamic Policy for Grouping Maintenance Activities. European Journal of Operational Research, 99 (3): 530-551.
-
(1997)
European Journal of Operational Research
, vol.99
, Issue.3
, pp. 530-551
-
-
Wildeman, R.E.1
Dekker, R.2
Smit, A.C.J.M.3
-
28
-
-
80053573852
-
Optimal cbpm policy considering maintenance effects and environmental condition
-
Xia, T., Xi, L., Zhou, X., and, Lee, J. 2011. Optimal CBPM Policy Considering Maintenance Effects and Environmental Condition. International Journal of Advanced Manufacturing Technology, 56 (9-12): 1181-1193.
-
(2011)
International Journal of Advanced Manufacturing Technology
, vol.56
, Issue.912
, pp. 1181-1193
-
-
Xia, T.1
Xi, L.2
Zhou, X.3
Lee, J.4
-
29
-
-
77950866262
-
Cost-effective updated sequential predictive maintenance policy for continuously monitored degrading systems
-
You, M. Y., Li, L., Meng, G., and, Ni, J. 2010. Cost-effective Updated Sequential Predictive Maintenance Policy for Continuously Monitored Degrading Systems. IEEE Transactions on Automation Science and Engineering, 7 (2): 257-265.
-
(2010)
IEEE Transactions on Automation Science and Engineering
, vol.7
, Issue.2
, pp. 257-265
-
-
You, M.Y.1
Li, L.2
Meng, G.3
Ni, J.4
-
30
-
-
33845605765
-
Reliability-centered predictive maintenance scheduling for a continuously monitored system subject to degradation
-
Zhou, X., Xi, L., and, Lee, J. 2007. Reliability-centered Predictive Maintenance Scheduling for a Continuously Monitored System Subject to Degradation. Reliability Engineering and System Safety, 92 (4): 530-534.
-
(2007)
Reliability Engineering and System Safety
, vol.92
, Issue.4
, pp. 530-534
-
-
Zhou, X.1
Xi, L.2
Lee, J.3
-
31
-
-
63149159128
-
Opportunistic preventive maintenance scheduling for a multi-unit series system based on dynamic programming
-
Zhou, X., Xi, L., and, Lee, J. 2009. Opportunistic Preventive Maintenance Scheduling for a Multi-unit Series System based on Dynamic Programming. International Journal of Production Economics, 118 (2): 361-366.
-
(2009)
International Journal of Production Economics
, vol.118
, Issue.2
, pp. 361-366
-
-
Zhou, X.1
Xi, L.2
Lee, J.3
-
32
-
-
33745185563
-
Performance evaluation of generalized multi-state k-out-of-n systems
-
Zuo, M. J., and, Tian, Z. 2006. Performance Evaluation of Generalized Multi-State k-out-of-n Systems. IEEE Transactions on Reliability, 55 (2): 319-327.
-
(2006)
IEEE Transactions on Reliability
, vol.55
, Issue.2
, pp. 319-327
-
-
Zuo, M.J.1
Tian, Z.2
|