메뉴 건너뛰기




Volumn 44, Issue 4, 2013, Pages 101-112

Critical management measures contributing to construction waste management: Evidence from construction projects in China

Author keywords

China; construction project; construction waste; factor analysis; management measure

Indexed keywords


EID: 84882287392     PISSN: 87569728     EISSN: 19389507     Source Type: Journal    
DOI: 10.1002/pmj.21349     Document Type: Article
Times cited : (56)

References (43)
  • 1
    • 2242459831 scopus 로고    scopus 로고
    • Analysis of factors influencing project cost estimating practice
    • Akintoye, A., (2000). Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18 (1), 77-89.
    • (2000) Construction Management and Economics , vol.18 , Issue.1 , pp. 77-89
    • Akintoye, A.1
  • 2
    • 84857278851 scopus 로고    scopus 로고
    • A study on the attitudes and behavioral influence of construction waste management in occupied Palestinian territory
    • Al-Sari, M., Al-Khaib, I., Avraamides, M., &, Fatta, D., (2012). A study on the attitudes and behavioral influence of construction waste management in occupied Palestinian territory. Waste Management and Research, 30 (2), 122-136.
    • (2012) Waste Management and Research , vol.30 , Issue.2 , pp. 122-136
    • Al-Sari, M.1    Al-Khaib, I.2    Avraamides, M.3    Fatta, D.4
  • 3
    • 79954826849 scopus 로고    scopus 로고
    • Reducing waste in high-rise residential buildings by information modeling at the design stage
    • Baldwin, A. N., Austin, S. A., Poon, C. S., Shen, L. Y., &, Wong, I., (2007). Reducing waste in high-rise residential buildings by information modeling at the design stage. Surveying & Built Environment, 18 (1), 51-62.
    • (2007) Surveying & Built Environment , vol.18 , Issue.1 , pp. 51-62
    • Baldwin, A.N.1    Austin, S.A.2    Poon, C.S.3    Shen, L.Y.4    Wong, I.5
  • 4
    • 37549009171 scopus 로고    scopus 로고
    • Modeling design information to evaluate pre-fabricated and pre-cast design solution for reducing construction waste in high rise residential buildings
    • Baldwin, A. N., Shen, L. Y., Poon, C. S., Austin, S. A., Wong, I., (2008). Modeling design information to evaluate pre-fabricated and pre-cast design solution for reducing construction waste in high rise residential buildings. Auto-mation in Construction, 17 (3), 333-341.
    • (2008) Auto-mation in Construction , vol.17 , Issue.3 , pp. 333-341
    • Baldwin, A.N.1    Shen, L.Y.2    Poon, C.S.3    Austin, S.A.4    Wong, I.5
  • 5
    • 34548825122 scopus 로고    scopus 로고
    • Factors and values of willingness to pay for improved construction waste management: A perspective of Malaysian contractors
    • Begum, R. A., Siwar, C., Pereira, J. J., &, Jaafar, A. H., (2007). Factors and values of willingness to pay for improved construction waste management: A perspective of Malaysian contractors. Waste Management, 27, 1902-1909.
    • (2007) Waste Management , vol.27 , pp. 1902-1909
    • Begum, R.A.1    Siwar, C.2    Pereira, J.J.3    Jaafar, A.H.4
  • 6
    • 62849125235 scopus 로고    scopus 로고
    • Attitude and behavioral factors in waste management in the construction industry of Malaysia
    • Begum, R. A., Siwar, C., Pereira, J. J., &, Jaafar, A. H., (2009). Attitude and behavioral factors in waste management in the construction industry of Malaysia. Resources, Conservation and Recycling, 53, 321-328.
    • (2009) Resources, Conservation and Recycling , vol.53 , pp. 321-328
    • Begum, R.A.1    Siwar, C.2    Pereira, J.J.3    Jaafar, A.H.4
  • 8
    • 0035296738 scopus 로고    scopus 로고
    • Municipal solid waste management in China: Using commercial management to solve a growing problem
    • (in Chinese).
    • Dong, S. S., Tong, K. W., &, Wu, Y. P., (2001). Municipal solid waste management in China: Using commercial management to solve a growing problem. Utilities Policy, 10, 7-11 (in Chinese).
    • (2001) Utilities Policy , vol.10 , pp. 7-11
    • Dong, S.S.1    Tong, K.W.2    Wu, Y.P.3
  • 9
    • 1842736956 scopus 로고    scopus 로고
    • Building waste assessment score: Design-based tool
    • Ekanayake, L. L., &, Ofori, G., (2004). Building waste assessment score: Design-based tool. Building and Environment, 39 (7), 851-861.
    • (2004) Building and Environment , vol.39 , Issue.7 , pp. 851-861
    • Ekanayake, L.L.1    Ofori, G.2
  • 10
    • 33751518002 scopus 로고    scopus 로고
    • A study conducted to reduce construction waste generation in Turkey
    • Esin, T., &, Cosgun, N., (2007). A study conducted to reduce construction waste generation in Turkey. Building and Environment, 42 (4), 1667-1674.
    • (2007) Building and Environment , vol.42 , Issue.4 , pp. 1667-1674
    • Esin, T.1    Cosgun, N.2
  • 14
    • 57149140880 scopus 로고    scopus 로고
    • The effectiveness of Hong Kong's construction waste disposal charging scheme
    • Hao, J. L., Hills, M., &, Tam, V. W. Y., (2008). The effectiveness of Hong Kong's construction waste disposal charging scheme. Waste Management & Research, 28, 553-558.
    • (2008) Waste Management & Research , vol.28 , pp. 553-558
    • Hao, J.L.1    Hills, M.2    Tam, V.W.Y.3
  • 15
    • 53349089708 scopus 로고    scopus 로고
    • Sustainable construction aspects of using prefabrication in dense urban environment: A Hong Kong case study
    • Jaillon, L., &, Poon, C. S., (2008). Sustainable construction aspects of using prefabrication in dense urban environment: A Hong Kong case study. Construction Management and Economics, 26 (9), 953-966.
    • (2008) Construction Management and Economics , vol.26 , Issue.9 , pp. 953-966
    • Jaillon, L.1    Poon, C.S.2
  • 16
    • 55549143657 scopus 로고    scopus 로고
    • Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong
    • Jaillon, L., Poon, C. S., &, Chiang, Y. H., (2009). Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong. Waste Management, 29 (1), 309-320.
    • (2009) Waste Management , vol.29 , Issue.1 , pp. 309-320
    • Jaillon, L.1    Poon, C.S.2    Chiang, Y.H.3
  • 18
    • 56349148222 scopus 로고    scopus 로고
    • Estimation of construction waste generation and management in Thailand
    • Kofoworola, O. F., &, Gheewala, S. H., (2009). Estimation of construction waste generation and management in Thailand. Waste Management, 29 (2), 731-738.
    • (2009) Waste Management , vol.29 , Issue.2 , pp. 731-738
    • Kofoworola, O.F.1    Gheewala, S.H.2
  • 19
    • 0038267851 scopus 로고    scopus 로고
    • Bar code technology for an incentive reward program to reduce construction wastes
    • Li, H., Chen, Z., &, Wong, C. T. C., (2003). Bar code technology for an incentive reward program to reduce construction wastes. Computer-Aided Civil and Infrastructure Engineering, 18, 313-324.
    • (2003) Computer-Aided Civil and Infrastructure Engineering , vol.18 , pp. 313-324
    • Li, H.1    Chen, Z.2    Wong, C.T.C.3
  • 20
    • 13244265795 scopus 로고    scopus 로고
    • Application of integrated GPS and GIS technology for reducing construction waste and improving construction efficiency
    • Li, H., Chen, Z., Yong, L., &, Kong, S. C. W., (2005). Application of integrated GPS and GIS technology for reducing construction waste and improving construction efficiency. Automation in Construction, 14, 323-331.
    • (2005) Automation in Construction , vol.14 , pp. 323-331
    • Li, H.1    Chen, Z.2    Yong, L.3    Kong, S.C.W.4
  • 21
    • 0035576477 scopus 로고    scopus 로고
    • Improving solid waste reduction and recycling performance using goal setting and feedback
    • Lingard, H., Gilbert, G., &, Graham, P., (2001). Improving solid waste reduction and recycling performance using goal setting and feedback. Construction Management and Economics, 19 (8), 809-817.
    • (2001) Construction Management and Economics , vol.19 , Issue.8 , pp. 809-817
    • Lingard, H.1    Gilbert, G.2    Graham, P.3
  • 22
    • 78649322407 scopus 로고    scopus 로고
    • Exploring critical success factors for waste management in construction projects of China
    • Lu, W. S., &, Yuan, H. P., (2010). Exploring critical success factors for waste management in construction projects of China. Resources, Conservation and Recycling, 55 (2), 201-208.
    • (2010) Resources, Conservation and Recycling , vol.55 , Issue.2 , pp. 201-208
    • Lu, W.S.1    Yuan, H.P.2
  • 24
    • 0002962578 scopus 로고    scopus 로고
    • Implementing a waste management plan during the construction phase of a construction project: A case study
    • McDonald, B., &, Smithers, M., (1998). Implementing a waste management plan during the construction phase of a construction project: A case study. Construction Management and Economics, 16 (1), 71-78.
    • (1998) Construction Management and Economics , vol.16 , Issue.1 , pp. 71-78
    • McDonald, B.1    Smithers, M.2
  • 29
    • 42149102027 scopus 로고    scopus 로고
    • Architects' perspectives on construction waste reduction by design
    • Osmani, M., Glass J., &, Price, A. D. F., (2008). Architects' perspectives on construction waste reduction by design. Waste Management, 28 (7), 1147-1158.
    • (2008) Waste Management , vol.28 , Issue.7 , pp. 1147-1158
    • Osmani, M.1    Glass, J.2    Price, A.D.F.3
  • 30
    • 0034996007 scopus 로고    scopus 로고
    • On-site sorting of construction and demolition waste in Hong Kong
    • Poon, C. S., Yu, A. T. W., &, Ng, L. H., (2001). On-site sorting of construction and demolition waste in Hong Kong. Resources, Conservation and Recycling, 32, 157-172.
    • (2001) Resources, Conservation and Recycling , vol.32 , pp. 157-172
    • Poon, C.S.1    Yu, A.T.W.2    Ng, L.H.3
  • 31
    • 40849086243 scopus 로고    scopus 로고
    • On the effectiveness of implementing a waste management plan method in construction
    • (a).
    • Tam, V. W. Y., (2008 a). On the effectiveness of implementing a waste management plan method in construction. Waste Management, 28, 1072-1080.
    • (2008) Waste Management , vol.28 , pp. 1072-1080
    • Tam, V.W.Y.1
  • 32
    • 38949202600 scopus 로고    scopus 로고
    • Economic comparison of concrete recycling: A case study approach
    • (b).
    • Tam, V. W. Y., (2008 b). Economic comparison of concrete recycling: A case study approach. Resources, Conservation and Recycling, 52 (5), 821-828.
    • (2008) Resources, Conservation and Recycling , vol.52 , Issue.5 , pp. 821-828
    • Tam, V.W.Y.1
  • 33
    • 33751162142 scopus 로고    scopus 로고
    • Assessing the levels of material wastage affected by sub-contracting relationships and projects types with their correlations
    • Tam, V. W. Y., Shen, L. Y., &, Tam, C. M., (2007). Assessing the levels of material wastage affected by sub-contracting relationships and projects types with their correlations. Building and Environment, 42, 1471-1477.
    • (2007) Building and Environment , vol.42 , pp. 1471-1477
    • Tam, V.W.Y.1    Shen, L.Y.2    Tam, C.M.3
  • 34
    • 34249942080 scopus 로고    scopus 로고
    • Towards adoption of prefabrication in construction
    • Tam, V. W. Y., Tam, C. M., Zeng, S. X., &, Ng, C. Y., (2007). Towards adoption of prefabrication in construction. Building and Environment, 42 (10), 3642-3654.
    • (2007) Building and Environment , vol.42 , Issue.10 , pp. 3642-3654
    • Tam, V.W.Y.1    Tam, C.M.2    Zeng, S.X.3    Ng, C.Y.4
  • 35
    • 0035501639 scopus 로고    scopus 로고
    • A theory of waste behavior in the construction industry
    • Teo, M. M. M., &, Loosermore, M., (2001). A theory of waste behavior in the construction industry. Construction Management and Economics, 19 (7), 741-751.
    • (2001) Construction Management and Economics , vol.19 , Issue.7 , pp. 741-751
    • Teo, M.M.M.1    Loosermore, M.2
  • 36
    • 77956627614 scopus 로고    scopus 로고
    • Research on management measures for reducing construction waste
    • (in Chinese).
    • Wang, J. Y., Kang, X. P., Shen, L. Y., &, Tan, Y. E., (2004). Research on management measures for reducing construction waste. Architecture Technology, 35 (10), 732-734 (in Chinese).
    • (2004) Architecture Technology , vol.35 , Issue.10 , pp. 732-734
    • Wang, J.Y.1    Kang, X.P.2    Shen, L.Y.3    Tan, Y.E.4
  • 37
    • 77956638469 scopus 로고    scopus 로고
    • On-site construction waste management model based on system dynamics
    • (in Chinese).
    • Wang, J. Y., &, Yuan, H. P., (2008). On-site construction waste management model based on system dynamics. Science and Technology Progress and Policy, 25 (10), 74-78 (in Chinese).
    • (2008) Science and Technology Progress and Policy , vol.25 , Issue.10 , pp. 74-78
    • Wang, J.Y.1    Yuan, H.P.2
  • 38
    • 77956629198 scopus 로고    scopus 로고
    • Critical success factors for on-site sorting of construction waste: A China study
    • Wang, J. Y., Yuan, H. P., Kang, X. P., &, Lu, W. S., (2010). Critical success factors for on-site sorting of construction waste: A China study. Resources, Conservation and Recycling, 54, 931-936.
    • (2010) Resources, Conservation and Recycling , vol.54 , pp. 931-936
    • Wang, J.Y.1    Yuan, H.P.2    Kang, X.P.3    Lu, W.S.4
  • 39
    • 84866695920 scopus 로고    scopus 로고
    • A SWOT analysis of successful construction waste management
    • Yuan, H. P., (2013). A SWOT analysis of successful construction waste management. Journal of Cleaner Production, 39 (1), 1-8.
    • (2013) Journal of Cleaner Production , vol.39 , Issue.1 , pp. 1-8
    • Yuan, H.P.1
  • 40
    • 84856329129 scopus 로고    scopus 로고
    • A dynamic model for assessing the effects of management strategies on the reduction of construction and demolition waste
    • Yuan, H. P., Chini, A. R., Lu, Y. J., &, Shen, L. Y., (2012). A dynamic model for assessing the effects of management strategies on the reduction of construction and demolition waste. Waste Management, 32, 521-531.
    • (2012) Waste Management , vol.32 , pp. 521-531
    • Yuan, H.P.1    Chini, A.R.2    Lu, Y.J.3    Shen, L.Y.4
  • 41
    • 79951551147 scopus 로고    scopus 로고
    • The research trend of construction and demolition waste management
    • Yuan, H. P., &, Shen, L. Y., (2011). The research trend of construction and demolition waste management. Waste Management, 31 (4), 670-679.
    • (2011) Waste Management , vol.31 , Issue.4 , pp. 670-679
    • Yuan, H.P.1    Shen, L.Y.2
  • 42
    • 79953271722 scopus 로고    scopus 로고
    • Major obstacles to improving the performance of waste management in China's construction industry
    • Yuan, H. P., Shen, L. Y., &, Wang, J. Y., (2011). Major obstacles to improving the performance of waste management in China's construction industry. Facilities, 29 (5/6), 224-242.
    • (2011) Facilities , vol.29 , Issue.56 , pp. 224-242
    • Yuan, H.P.1    Shen, L.Y.2    Wang, J.Y.3
  • 43
    • 84859843240 scopus 로고    scopus 로고
    • China's cities, globalization, and sustainable development: Comparative thoughts on urban planning, energy, and environmental policy
    • Ziegler, E. H., (2006). China's cities, globalization, and sustainable development: comparative thoughts on urban planning, energy, and environmental policy. Washington University Global Studies Law Review, 5 (2), 295-322.
    • (2006) Washington University Global Studies Law Review , vol.5 , Issue.2 , pp. 295-322
    • Ziegler, E.H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.